This is an Integrated Vendor Q&A and Government Response Guide for a recompete solicitation (HQ072726QRT02) issued by the Defense Microelectronics Activity (DMEA) for enterprise program support services. The contract, valued at $450,000 annually with approximately 1.2 FTEs (2,400 hours), requires professional, technical, and system integration services to maintain, assess, and remediate DMEA's enterprise-wide risk management (ERM) and risk management and internal control (RMIC) program. The scope encompasses approximately 10 divisions, 1 accredited laboratory, and 200 personnel at the McClellan, California facility, with possible onsite visits to Florida and Pennsylvania locations. Work involves managing approximately 8 primary systems, 25 business processes, 15 active enterprise risks, and 170 controls across all frameworks, with the contractor expected to maintain the current Maturity Level 4 ("Quantitatively Managed") program and help transition it toward Level 5 ("Optimized"). Key responsibilities include system integration improvements to existing government-furnished equipment (ServiceNow and SharePoint), independent testing and coordination of 13 assessable units with 170 RMIC controls annually, root-cause analysis facilitation for approximately 8 CPARs/DARAs and 6 findings per year, and coordination with 21 risk owners and 9 executive stakeholders.
The solicitation is issued as an RFQ under open-market commercial simplified procedures available exclusively to 13 CFR 127.300 certified Women-Owned Small Businesses (WOSB), with award anticipated as a single contract without discussions. Performance requires access to Controlled Unclassified Information (CUI) only, with all onsite personnel requiring Common Access Cards (CAC) for logical network access; no facility or personnel security clearances are required, though interim CAC issuance is available pending FBI fingerprint checks. Approximately 5 percent of work is onsite with 95 percent telework authorized; the Project Manager/Lead Auditor position must be dedicated, and travel (2 trips annually to DMEA) is cost-reimbursable. The Government anticipates no surge requirements, with workload distributed across the year. Questions must be submitted by 29 July 2026 at 16:30 PST, and offers are due by 16:30 PST on Monday, 10 August 2026, to Contract Specialist Ryan Tung via email at ryan.c.tung.civ@mail.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Government_Response_Guide_30 JUL 2026.docx | DOCX document | |
| Combined SynapSolicit DMEA_Enterprise_Program_Support_(FAR_Part_12) v3.docx | DOCX document | |
| Government_Response_Guide_28 JUL 2026.docx | DOCX document | |
| Combined SynapSolicit DMEA_Enterprise_Program_Support_(FAR_Part_12) v2.docx | DOCX document | |
| Combined SynapSolicit DMEA_Enterprise_Program_Support_(FAR_Part_12).docx | DOCX document | |
| 26-6F3 PWS Enterprise Program Support_Redacted.pdf | ||
| Gvt_response_guide.docx | DOCX document | |
| Combined SynapSolicit DMEA_Enterprise_Program_Support_(FAR_Part_12).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Integrated Vendor Q&A and Government Response Guide
Government Response Guide
July 20, 2026
Theme 1: Enterprise Scope & Workload Metrics Q: Is this a recompete? If so, what is the contract number, incumbent, annual value, and historical staffing level? (MECC answers this) A: Yes, this is a recompete. Contract: [HQ072721F0024]. Incumbent: [CSCI]. Historical Value: [$450k/12months]. Historical staffing: Approx. [1.2] FTEs or [2400] hours.
Q: How many DMEA organizations, directorates, laboratories, and personnel are in scope?
A: The scope encompasses the DMEA Complex at McClellan, CA. There are approximately [10] Divisions, [1] accredited lab, and [200] personnel involved.
Q: Are there geographically dispersed DMEA facilities or contractor-operated environments?
A: Contractor employees could perform this work at McClellan, with possible onsite visits to FL, PA (other) facilities, and from their facilities or telework (as authorized by the contractor and in compliance with DMEA security/cybersecurity requirements for GFE).
Q: How many enterprise systems, processes, risks, and controls are documented and in scope?
A: DMEA tracks approximately [8] primary systems, [25] business processes, [15] active enterprise risks, and [170] controls across all frameworks.
Q: What is the current maturity level of the ERM/RMIC program?
A: The program is currently at a “Quantitatively Managed” level (Maturity Level 4). The Contractor is expected to maintain and help transition it toward an “Optimized” level (Maturity Level 5). (I used the CMMI levels as there are no specified maturity models for RMIC. If there is a model that should be used, please send it to me so I can select our current level from its descriptions).
Theme 2: Technology, Systems, and Data Integration Q: Is DMEA utilizing a centralized GRC platform? Is the contractor expected to build, buy, or migrate software?
A: DMEA does not license a commercial GRC platform. No new software procurement or massive data migration is required. Operations use existing GFE (ServiceNow, SharePoint).
Q: What system integrations, workflow automation, and reporting are expected under PWS 3.3.1?
A: “System integration” means providing improvements to existing GFE configurations. The contractor will optimize SharePoint sites, ServiceNow workflows, and dashboards.
Theme 3: RMIC, OMB A-123 & Risk Management Operations Q: How many audits, assessable units, and key controls are tested annually?
A: DMEA has [13] assessable units with [170] RMIC controls tested annually. [1] major internal assessment cycle, with [1-2] single-unit, out-of-cycle assessments, occurring each year.
Q: Is the contractor expected to conduct independent testing or merely facilitate?
A: The contractor shall execute independent testing/analysis in coordination with process owners and program manager, though the Government makes the final determination.
Q: How many findings, CPARs, DARAs, and material weaknesses are managed annually? Does the contractor perform root-cause analysis?
A: DMEA manages [8] CPARs/DARAs and [6] findings annually, with [0] material weaknesses. Yes, the contractor facilitates root-cause analysis with process owners and program manager.
Q: How many risk owners and executive boards participate? Are taxonomies established?
A: Approx. [21] risk owners and [9] executive stakeholders participate. Taxonomies and impact criteria are already established under DMEA Policy 5010.40.
Theme 4: Cybersecurity & ISO Frameworks Q: Is compliance with DoDI 8510.01 (Cyber RMF), CMMC, or NIST 800-53 in scope?
A: No. Cybersecurity authorization (ATO/cATO) is out of scope. High-level IT risks are in the ERM, but deep technical security control testing is handled by DMEA’s IT division.
Q: Which organizations/labs are certified under ISO 9001 and ISO 17025? Are other ISO standards in scope?
A: The organic engineering (design, manufacturing, product support, packaging, and data package) is ISO 9001 registered. The Science and Engineering Gamma Irradiation Test lab is ISO 17025 accredited. No other ISO standards are in scope.
Q: Is there an expectation to maintain a unified catalog and map ERM/RMIC to ISO requirements?
A: No. ISO-9001 requirements are mapped to the RMIC framework where they apply within DMEA.
Theme 5: Staffing, Clearances, and Submission Rules Q: What security clearance, suitability, and facility-clearance (FCL) requirements apply?
A: All onsite personnel require a CAC for CUI level access. A Secret Clearance and above is not required. An FCL is not required.
Q: Contractors need CAC cards?
A: Yes, CAC grants "logical access" (login rights) to a secure government network via Government laptop and requires a Tier 1 background check. Because a full Tier 1 investigation can take weeks or months to finalize, the government is authorized to issue the physical CAC on an interim basis as soon as the contractor's FBI fingerprint check and initial database checks return with favorable results.
Q: What percentage of work is onsite? Are specific roles full-time? What about travel?
A: Approx. [5%] onsite and [95%] telework. No strict full-time mandate, but the PM/Lead Auditor must be dedicated. Travel is cost-reimbursable (2 times a year to DMEA).
Q: Does the Government anticipate surge requirements for the Statement of Assurance?
A: No. Workload is distributed across the year to avoid surge for testing.
Q: Are resumes excluded from the page limit?
A: Yes, resumes are excluded from the page limit.