7-15-15_HQ0727-15-R-JW03-0004.pdf
PDF 34 KB Posted
- Attached to
- Installation of cameras and lighting
- Solicitation number
- HQ0727-15-R-JW03
- Issued by
-
Defense Microelectronics Activity
About this file
SF 30 Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_15-5B7_(C4).doc | DOC document | |
| SOW_15-5B7_CH3.doc | DOC document | |
| Construction_Cost_Estimate_Breakdown.xls | XLS spreadsheet | |
| 6-23-2015_HQ0727-15-R-JW03_Final.pdf | ||
| Wage_Decision_No._CA20140009.pdf | ||
| SOW_15-5B7_CH2.pdf | ||
| 6-23-2015_HQ0727-15-R-JW03_Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5M15B701 15-5B7
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Adding SOW 15-5B7 CH4 dated 14 July 2015 (See Statement of Work w ith tracked changes on to view changes from previous version).
Extending the date and time proposals are due to 31 Jul 15 by 1500 PST.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X HQ0727-15-R-JW03
X 9B. DATED (SEE ITEM 11)
23-Jun-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2015
CODE
DEFENSE MICROELECTRONICS ACTIVITY (HQ)
CONTRACTING DIVISION
4234 54TH STREET
MCCLELLAN CA 95652-2100
HQ0727 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
HQ0727-15-R-JW03
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 21-Jul-2015 09:00 AM to 31-Jul-2015 03:00 PM.
CLIN 0001
The CLIN description has changed from South Lot lLighting and Cameras to South Lot Lighting and Cameras.
The CLIN extended description has changed from The Contractor shall provide, design, labor, and materials to install proper lighting and camera coverage for the South lot of Building 1. In accordance with DMEA Statement of Work 15-5B7 dated 15 May 2015 to The Contractor shall provide, design, labor, and materials to install proper lighting and camera coverage for the South lot of Building 1. In accordance with DMEA Statement of Work 15-5B7 dated 14 Jul 2015.
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Decision No.
CA20140009 Mod-09
42 05-JUN-2015
Attachment 2 Statement of Work 10 15-MAY-2015 Attachment 3 Construction Cost
Estimate
3 18-JUN-2015
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Wage Decision No.
CA20140009 Mod-09
42 05-JUN-2015
Attachment 2 Statement of Work 15-
5B7 CH4
10 14-JUL-2015
Attachment 3 Construction Cost Estimate
3 18-JUN-2015
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
1.0 Basis for Award:
Award will be made to the Offeror whose proposal is determined to provide the “best value” to the Government in accordance with FAR Part 36 and FAR Part 15, considering cost and non-cost factors. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.
The Government intends to evaluate proposals and award a contract without discussions; the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them necessary. The Government reserves the right to reject any or all offers.
2.0 Questions / Requests for Information:
Any questions or concerns regarding the project must be submitted in writing to the Contract Specialist (CS) not later than 1500 (3:00 p.m.) PST, 22 Jul 2015, as follows:
Name: Mr. Jarrod Washington, CS E-mail Address: jarrod.washington@dmea.osd.mil
Questions received after this deadline may not be answered.
Beyond e-mailing questions to the CS, Offerors may not contact any points of contact identified in the solicitation or SOW.
The CS will provide responses to questions to all participating Offerors via e-mail. The Government anticipates that answers will be provided to all participating Offerors by 1500 (3:00 p.m.) PST on 13 Jul 2015. Additionally, answers will be provided as a posting amendment on FedBizOpps.gov.
3.0 Proposal Submittal:
Offerors must submit proposals to the Contract Specialist, Jarrod Washington, by 1500 (3:00 p.m.) PST, Friday, 31 Jul 2015. Offerors may submit proposals by e-mail (preferred method) or mail (must be delivered Monday through Friday, 0700 – 1500 / 7 a.m. to 3 p.m.), as follows:
Via E-mail: jarrod.washington@dmea.osd.mil Via Mail: DMEA Contracting Office
4234 54th Street McClellan, CA 95652-2100
4.0 Proposals must include the following:
1) SF 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), pages 2-4. On page 2, the Code in block 14 is the Offeror’s CAGE code; no Facility Code is needed. Please read the CLIN descriptions on page 3 prior to providing pricing. Complete and return SF 1442 pages 2-3.
2) SF 1442, Representations & Certifications. Complete and return SF 1442 Reps & Certs, pages 16-24, OR System for Award Management (SAM) Reps & Certs printouts which include all completed clauses from solicitation pages 16-24.
3) Construction Cost Estimate Breakdown (CCEB). Offerors shall provide a breakdown of all proposal costs using the CCEB form (solicitation Attachment 5), or other Contractor format. Lump sum costs for any item of work will not be accepted; incomplete or non-compliant price proposals may be rejected. Breakdown must include all prime and any subcontractor costs. Breakdown must address all aspects of the Offeror’s technical approach including all material costs, quantities, labor skill mixes, labor hours, hourly rates, otherdirect costs (ODCs), overhead, profit, and total price. Contractor will provide a CCEB for CLIN 0001 and a separate CCEB for each potential sub-contractor.
4) Material specifications / data sheets for all proposed materials to be installed.
5) A copy of the manufacturer’s warranty terms and conditions.
6) A copy of the Contractor’s installation warranty terms and conditions.
7) Construction Schedule: The estimated Period of Performance (PoP) for this requirement is 60 days, including lead times for materials; this PoP is negotiable. The Contractor shall propose the PoP for completion of the project. The Offeror’s Schedule must include material lead times and break out completion timelines for significant portions of work in number of calendar days.
8) Company contact information, including shop address, project manager’s name, e-mail address, and telephone number.
9) Licensing Information. Provide your California State Contractor License Number.
10) Customer References. Provide at least three (3) past performance references listing customers, locations, and current points of contact, at which your company performed similar work.
5.0 Evaluation Criteria:
1) Technical Approach
a. Technical Narrative /Lighting, cameras and trenching:
i. Describes the exact processes to be utilized to remove and replace the the earth in the affected area to include estimated amonts displaced and replaced.
ii. Defines the length of time start to finish.
iii. Describes the methodology to to protect the area from accidents.
iv. Discusses the type and number of cameras to be installed and their locations **NOTE** Using google earth you may be able to obtain aerial pictures of the facility, which will aid you in providing drawings that can be used to place your location of work descriptors and areas of coverage.
v. States the size of work crews needed.
vi. States equipment to be used.
vii. Addresses the environmental requirements/concerns of the contract.
b. Proposed Product Specifications:
i. Includes a material submittal / specification sheet for all materials of the design.
system, including all product layers and walkways.
ii. Material submittals propose a system and coverages as listed in the SOW
d. Warranty:
i. Manufacturer’s warranty is not less than twenty (20) years.
ii. Contractor’s installation warranty is not less than five (5) years.
iii. Warranty for commercial items standard
2) Schedule
a. Provide a schedule in number of calendar days, that includes the portions of the work broken out by type (e.g.
excavation, conduit laying, cabling, electrical, etc)
b. Provides material lead times and break out completion timelines for significant portions of work.
3) Price
a. Provides a price for CLIN 0001 on SF 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), pages 2-3.
b. Provides a detailed cost breakout for labor/skill categories proposed with expected hours and rates per hour fully burdened.
c. Provides listing of equipment and material.
4) Past Performance
a. Provide three (3) references listing customers, locations, and current points of contact, at which your company performed similar work.
b. References indicate acceptable or better performance of past project.
c. References indicate that similar work was completed within the last ten (10) years.
5) Other Requirements –
a. Proposal includes all items identified in Section 4.0, above and if not listed ensure that all items in the statement of work are addressed.
b. Proposals are limited to sixty (60) pages maximum, including all items identified in Section 4.0, above. One page is defined as one side of a single 8.5” x 11” sheet of paper.
c. Offeror is a small business, in accordance with the set-aside determination for the requirement.
Small business size status is verifiable in SAM.
Please contact Jarrod Washington at jarrod.washington@dmea.osd.mil, with any questions regarding this solicitation.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .