6-23-2015_HQ0727-15-R-JW03_Final.pdf

PDF 109 KB Posted

Attached to
Installation of cameras and lighting
Solicitation number
HQ0727-15-R-JW03
Issued by

About this file

SF-1442 HQ0727-15-R-JW03 RFP

View the file

Other files

File Type Posted
7-15-15_HQ0727-15-R-JW03-0004.pdf PDF
SOW_15-5B7_(C4).doc DOC document
SOW_15-5B7_CH3.doc DOC document
Construction_Cost_Estimate_Breakdown.xls XLS spreadsheet
6-23-2015_HQ0727-15-R-JW03_Final.pdf PDF
Wage_Decision_No._CA20140009.pdf PDF
SOW_15-5B7_CH2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5M15B701

South Lot lighting and camera installation, incidental to trenching and conduit w ork on Bldg 1

Statement of Work 15-5B7, South Lot Lighting and Cameras, dated 5 May 2015.

Guiding Principles for Federal Leadership in High-Performance and Sustainable Buildings, dated 1 Dec 2008.

Department of Labor Wage Determination No. CA20140030, Modification 11, dated 17 April 2015.

In accordance w ith FAR 36.204, the magnitude of the construction for this project is estimated to be betw een $250,0000.00 and $500,000.00.

Mandatory site visit is scheduled for 1100 (11:00 a.m.) Pacif ic Standard Time (PST), Thursday, 18 June 2015.

All site visit attendance requests must be received by 0900 (9:00 a.m.) PST 17 June 2015 to be processed for site clearance. All attendees must be U.S. Citizens.

See FAR 52.236-27 and Alternate I for more information.

Contractor proposals are due by 0900 (9:00 a.m.) PST, 7 July 2015.

JARROD WASHINGTON (916)231-2857

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

23-Jun-2015

(RFP)

(IFB)

X

CALL:

South Lot Lighting and Cameras

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________21 Jul 2015 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

DEFENSE MICROELECTRONICS ACTIVITY (HQ)

CONTRACTING DIVISION

4234 54TH STREET

MCCLELLAN CA 95652-2100

HQ0727

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

09:00 AM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

15-5B7

8. ADDRESS OFFER TO (If Other Than Item 7)

916-231-2821FAX:TEL: 916-231-1521 TEL: FAX:

HQ0727-15-R-JW03 42

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

HQ0727-15-R-JW03

Section 00010 - Solicitation Contract Form

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Task

South Lot lLighting and Cameras

FFP

The Contractor shall provide, design, labor, and materials to install proper lighting and camera coverage for the South lot of Building 1. In accordance with DMEA Statement of Work 15-5B7 dated 15 May 2015

FOB: Destination

PURCHASE REQUEST NUMBER: 5M15B701

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 60 dys. ADC 1 DEFENSE MICROELECTRONICS

ACTIVITY (HQ)

DAVID ELLIOTT

DMEA/MECA

4234 54TH STREET

MCCLELLAN CA 95652-2100

916-231-1629

FOB: Destination

HQ0727

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Wage Decision No.

CA20140009 Mod-09

42 05-JUN-2015

Attachment 2 Statement of Work 10 15-MAY-2015

Attachment 3 Construction Cost Estimate

3 18-JUN-2015

Section 00100 - Bidding Schedule/Instructions to Bidders

CLAUSES INCORPORATED BY REFERENCE

52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.232-13 Notice Of Progress Payments APR 1984 52.236-28 Preparation of Proposals--Construction OCT 1997

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Nellie Daugherty

4234 54th Street

McClellan, CA 95652-2100

Nellie.daugherty@dmea.osd.mil

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: Mr. Jarrod Washington

E-Mail Address: jarrod.washington@dmea.osd.mil

NOTES: Requests must include the name, phone number, and confirmation of US citizenship for each attendee.

Requests must be received by 1500 (3:00 p.m.) PST 23 Jun 2015 to be processed for site clearance.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

24 Jun 2015 @ 1000 (10:00 a.m.) PST

(c) Participants will meet at--

DMEA Building 1 Lobby, 4234 54th Street, McClellan, CA 95652-2100

NOTES: Site visit attendance is limited to three (3) people per company.

All site visit attendees must be U.S. Citizens. Attendees will be required to provide proof of US citizenship at the site visit; please bring a current US passport OR valid US driver’s license and birth certificate.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/ https://www.acquisition.gov/

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

1.0 Basis for Award:

Award will be made to the Offeror whose proposal is determined to provide the “best value” to the Government in accordance with FAR Part 36 and FAR Part 15, considering cost and non-cost factors. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

The Government intends to evaluate proposals and award a contract without discussions; the Offeror’s initial proposal should contain the Offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them necessary. The Government reserves the right to reject any or all offers.

2.0 Questions / Requests for Information:

Any questions or concerns regarding the project must be submitted in writing to the Contract Specialist (CS) not later than 1500 (3:00 p.m.) PST, 8 Jul 2015, as follows:

Name: Mr. Jarrod Washington, CS E-mail Address: jarrod.washington@dmea.osd.mil

Questions received after this deadline may not be answered.

Beyond e-mailing questions to the CS, Offerors may not contact any points of contact identified in the solicitation or SOW.

The CS will provide responses to questions to all participating Offerors via e-mail. The Government anticipates that answers will be provided to all participating Offerors by 1500 (3:00 p.m.) PST on 13 Jul 2015. Additionally, answers will be provided as a posting amendment on FedBizOpps.gov.

3.0 Proposal Submittal:

Offerors must submit proposals to the Contract Specialist, Jarrod Washington, by 1500 (3:00 p.m.) PST, Tuesday, 21 Jul 2015. Offerors may submit proposals by e-mail (preferred method) or mail (must be delivered Monday through Friday, 0700 – 1500 / 7 a.m. to 3 p.m.), as follows:

Via E-mail: jarrod.washington@dmea.osd.mil Via Mail: DMEA Contracting Office

4234 54th Street McClellan, CA 95652-2100

4.0 Proposals must include the following:

1) SF 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), pages 2-4. On page 2, the Code in block 14 is the Offeror’s CAGE code; no Facility Code is needed. Please read the CLIN descriptions on page 3 prior to providing pricing. Complete and return SF 1442 pages 2-3.

2) SF 1442, Representations & Certifications. Complete and return SF 1442 Reps & Certs, pages 16-24, OR System for Award Management (SAM) Reps & Certs printouts which include all completed clauses from solicitation pages 16-24.

3) Construction Cost Estimate Breakdown (CCEB). Offerors shall provide a breakdown of all proposal costs using the CCEB form (solicitation Attachment 5), or other Contractor format. Lump sum costs for any item of work will not be accepted; incomplete or non-compliant price proposals may be rejected. Breakdown must include all prime and any subcontractor costs. Breakdown must address all aspects of the Offeror’s technical approach including all material costs, quantities, labor skill mixes, labor hours, hourly rates, otherdirect costs (ODCs), overhead, profit, and total price. Contractor will provide a CCEB for CLIN 0001 and a separate CCEB for

CLIN 0002.

4) Material specifications / data sheets for all proposed materials to be installed.

5) A copy of the manufacturer’s warranty terms and conditions.

6) A copy of the Contractor’s installation warranty terms and conditions.

7) Construction Schedule: The estimated Period of Performance (PoP) for this requirement is 60 days, including lead times for materials; this PoP is negotiable. The Contractor shall propose the PoP for completion of the project. The Offeror’s Schedule must include material lead times and break out completion timelines for significant portions of work in number of calendar days.

8) Company contact information, including shop address, project manager’s name, e-mail address, and telephone number.

9) Licensing Information. Provide your California State Contractor License Number.

10) Customer References. Provide at least three (3) past performance references listing customers, locations, and current points of contact, at which your company installed the proposed roofing material.

5.0 Evaluation Criteria:

1) Technical Approach

a. Technical Narrative /Lighting, cameras and trenching:

i. Describes the exact processes to be utilized to remove and replace the the earth in the affected area to include estimated amonts displaced and replaced.

ii. Defines the length of time start to finish.

iii. Describes the methodology to to protect the area from accidents.

iv. Discusses the type and number of cameras to be installed and their locations **NOTE** Using google earth you may be able to obtain aerial pictures of the facility, which will aid you in providing drawings that can be used to place your location of work descriptors and areas of coverage.

v. States the size of work crews needed.

vi. States equipment to be used.

vii. Addresses the environmental requirements/concerns of the contract.

b. Proposed Product Specifications:

i. Includes a material submittal / specification sheet for all materials of the design.

system, including all product layers and walkways.

ii. Material submittals propose a system and coverages as listed in the SOW

d. Warranty:

i. Manufacturer’s warranty is not less than twenty (20) years.

ii. Contractor’s installation warranty is not less than five (5) years.

iii. Warranty for commercial items standard

2) Schedule

a. Provide a schedule in number of calendar days, that includes the portions of the work broken out by type (e.g.

excavation, conduit laying, cabling, electrical, etc)

b. Provides material lead times and break out completion timelines for significant portions of work.

3) Price

a. Provides a price for CLIN 0001 on SF 1442, Solicitation, Offer, and Award (Construction, Alteration, or Repair), pages 2-3.

b. Provides a detailed cost breakout for labor/skill categories proposed with expected hours and rates per hour fully burdened.

c. Provides listing of equipment and material.

4) Past Performance

a. Provides three (3) references listing customers, locations, and current points of contact, at which your company installed the proposed roofing material.

b. References indicate acceptable or better performance of past project.

c. References indicate that installation of proposed roofing material was completed within the last ten (10) years.

5) Other Requirements –

a. Proposal includes all items identified in Section 4.0, above and if not listed ensure that all items in the statement of work are addressed.

b. Proposals are limited to fifty (60) pages maximum, including all items identified in Section 4.0, above. One page is defined as one side of a single 8.5” x 11” sheet of paper.

c. Offeror is a small business, in accordance with the set-aside determination for the requirement.

Small business size status is verifiable in SAM.

Please contact Jarrod Washington at jarrod.washington@dmea.osd.mil, with any questions regarding this solicitation.

Section 00600 - Representations & Certifications

52.203-11 Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions

SEP 2007

52.204-7 System for Award Management JUL 2013

52.204-8 Annual Representations and Certifications DEC 2014

52.204-12 Data Universal Numbering System Number Maintenance DEC 2012

52.204-13 System for Award Management Maintenance JUL 2013

52.204-16 Commercial and Government Entity Code Reporting NOV 2014

52.204-18 Commercial and Government Entity Code Maintenance NOV 2014

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.222-38 Compliance With Veterans' Employment Reporting Requirements

SEP 2010

252.203-7005 Representation Relating to Compensation of Former DoD Officials

NOV 2011

252.204-7004 Alt A System for Award Management Alternate A FEB 2014

252.204-7007 Alternate A, Annual Representations and Certifications JAN 2015

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JULY 2013)

(a) Definitions. As used in this clause--

Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause. Such a concern is ``not dominant in its field of operation'' when it does not exercise a controlling or major influence on a national basis in a kind of business activity in which a number of business concerns are primarily engaged. In determining whether dominance exists, consideration shall be given to all appropriate factors, including volume of business, number of employees, financial resources, competitive status or position, ownership or control of materials, processes, patents, license agreements, facilities, sales territory, and nature of business activity.

(b) If the Contractor represented that it was a small business concern prior to award of this contract, the Contractor shall rerepresent its size status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon the occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts--

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code assigned to this contract. The small business size standard corresponding to this NAICS code can be found at http://www.sba.gov/content/table-small-business-size-standards.

(d) The small business size standard for a Contractor providing a product which it does not manufacture itself, for a contract other than a construction or service contract, is 500 employees.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The

Contractor shall notify the contracting office in writing within the timeframes specified in paragraph (b) of this clause that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it ( ) is, ( ) is not a small business concern under NAICS Code 238210- assigned to contract number .

(Contractor to sign and date and insert authorized signer's name and title).

(End of clause)

52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4) such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction Material Description Unit of Measure Quantity Price (dollars)

Item 1:

Foreign construction material

Domestic construction material

Item 2:

Foreign construction material

Domestic construction material

Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2015)

Substitute the following paragraphs (d) and (e) for paragraph (d) of the provision at FAR 52.204-8:

(d)(1) The following representations or certifications in the System for Award Management (SAM) database are applicable to this solicitation as indicated:

(i) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus--Representation. Applies to all solicitations with institutions of higher education.

(ii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.

(iii) 252.222-7007, Representation Regarding Combating Trafficking in Persons, as prescribed in 222.1771. Applies to solicitations with a value expected to exceed the simplified acquisition threshold.

(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.

(v) 252.225-7049, Prohibition on Acquisition of Commercial Satellite Services from Certain Foreign Entities-- Representations. Applies to solicitations for the acquisition of commercial satellite services.

(vi) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.

(vii) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will be in Italy.

(viii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will be in Spain.

(ix) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.

(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate.]

____ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.

____ (ii) 252.225-7000, Buy American--Balance of Payments Program Certificate.

____ (iii) 252.225-7020, Trade Agreements Certificate.

____ Use with Alternate I.

____ (iv) 252.225-7031, Secondary Arab Boycott of Israel.

____ (v) 252.225-7035, Buy American--Free Trade Agreements--Balance of Payments Program Certificate.

____ Use with Alternate I.

____ Use with Alternate II.

____ Use with Alternate III.

____ Use with Alternate IV.

____ Use with Alternate V.

(e) The offeror has completed the annual representations and certifications electronically via the SAM Web site at https://www.acquisition.gov/. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8(c) and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below ____ [offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications located in the SAM database.

Section 00700 - Contract Clauses

52.202-1 Definitions NOV 2013

52.203-3 Gratuities APR 1984

52.203-5 Covenant Against Contingent Fees MAY 2014

52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006

52.203-7 Anti-Kickback Procedures MAY 2014

52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014

52.203-12 Limitation On Payments To Influence Certain Federal Transactions

OCT 2010

52.204-2 Security Requirements AUG 1996

52.204-2 Alt II Security Requirements (Aug 1996) - Alternate II APR 1984

52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

JUL 2013

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment

AUG 2013

52.215-2 Audit and Records--Negotiation OCT 2010

52.219-6 Notice Of Total Small Business Set-Aside NOV 2011

52.219-8 Utilization of Small Business Concerns OCT 2014

52.219-13 Notice of Set-Aside of Orders NOV 2011

52.219-14 Limitations On Subcontracting NOV 2011

52.222-3 Convict Labor JUN 2003

52.222-4 Contract Work Hours and Safety Standards- Overtime Compensation

MAY 2014

52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014

52.222-7 Withholding of Funds MAY 2014

52.222-8 Payrolls and Basic Records MAY 2014

52.222-9 Apprentices and Trainees JUL 2005

52.222-10 Compliance with Copeland Act Requirements FEB 1988

52.222-11 Subcontracts (Labor Standards) MAY 2014

52.222-12 Contract Termination-Debarment MAY 2014

52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988

52.222-15 Certification of Eligibility MAY 2014

52.222-21 Prohibition Of Segregated Facilities APR 2015

52.222-22 Previous Contracts And Compliance Reports FEB 1999

52.222-25 Affirmative Action Compliance APR 1984

52.222-26 Equal Opportunity APR 2015

52.222-27 Affirmative Action Compliance Requirements for Construction

APR 2015

52.222-35 Equal Opportunity for Veterans JUL 2014

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014

52.222-37 Employment Reports on Veterans JUL 2014

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015

52.222-55 Minimum Wages Under Executive Order 13658 DEC 2014

52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997

52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011

52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May 2011) Alternate I

MAY 2011

52.223-5 Alt II Pollution Prevention and Right-to-Know Information (May 2011) Alt II

MAY 2011

52.223-6 Drug-Free Workplace MAY 2001

52.223-11 Ozone-Depleting Substances MAY 2001

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008

52.227-4 Patent Indemnity-Construction Contracts DEC 2007

52.228-2 Additional Bond Security OCT 1997

52.228-5 Insurance - Work On A Government Installation JAN 1997

52.228-11 Pledges Of Assets JAN 2012

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014

52.228-14 Irrevocable Letter of Credit NOV 2014

52.228-15 Performance and Payment Bonds--Construction OCT 2010

52.229-3 Federal, State And Local Taxes FEB 2013

52.232-1 Payments APR 1984

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014

52.232-17 Interest MAY 2014

52.232-23 Assignment Of Claims MAY 2014

52.232-27 Prompt Payment for Construction Contracts MAY 2014

52.233-1 Disputes MAY 2014

52.233-1 Alt I Disputes (May 2014) - Alternate I DEC 1991

52.233-3 Protest After Award AUG 1996

52.236-2 Differing Site Conditions APR 1984

52.236-3 Site Investigation and Conditions Affecting the Work APR 1984

52.236-5 Material and Workmanship APR 1984

52.236-6 Superintendence by the Contractor APR 1984

52.236-7 Permits and Responsibilities NOV 1991

52.236-8 Other Contracts APR 1984

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984

52.236-11 Use and Possession Prior to Completion APR 1984

52.236-12 Cleaning Up APR 1984

52.236-13 Accident Prevention NOV 1991

52.236-14 Availability and Use of Utility Services APR 1984

52.236-15 Schedules for Construction Contracts APR 1984

52.236-16 Quantity Surveys APR 1984

52.236-17 Layout of Work APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997

52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995

52.242-14 Suspension of Work APR 1984

52.242-15 Stop-Work Order AUG 1989

52.243-4 Changes JUN 2007

52.244-6 Subcontracts for Commercial Items APR 2015

52.246-12 Inspection of Construction AUG 1996

52.246-21 Warranty of Construction MAR 1994

52.246-21 Alt I Warranty of Construction (Mar 1994) - Alternate I APR 1984

52.248-3 Value Engineering-Construction OCT 2010

52.249-2 Termination For Convenience Of The Government (Fixed- Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984

52.253-1 Computer Generated Forms JAN 1991

252.201-7000 Contracting Officer's Representative DEC 1991

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013

252.203-7005 Representation Relating to Compensation of Former DoD Officials

NOV 2011

252.204-7003 Control Of Government Personnel Work Product APR 1992

252.204-7005 Oral Attestation of Security Responsibilities NOV 2001

252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Country that is a State Sponsor of Terrorism

DEC 2014

252.223-7004 Drug Free Work Force SEP 1988

252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials

SEP 2014

252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

JUN 2012

252.232-7010 Levies on Contract Payments DEC 2006

252.236-7000 Modification Proposals-Price Breakdown DEC 1991

252.236-7008 Contract Prices-Bidding Schedules DEC 1991

252.243-7001 Pricing Of Contract Modifications DEC 1991

252.243-7002 Requests for Equitable Adjustment DEC 2012

252.247-7023 Transportation of Supplies by Sea APR 2014

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 calendar days.

NOTE: The time stated for completion shall include final cleanup of the premises.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

16.1% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is California, Sacramento County, Sacramento].

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ http://farsite.hill.af.mil/

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

SEE PWS 15-5B7 CH2

Section 00800 - Special Contract Requirements

252.204-7006 Billing Instructions OCT 2005

252.232-7006 Wide Area WorkFlow Payment Instructions MAY 2013

52.232-9002 Wide Area Work Flow (WAWF) Receipt and Acceptance (RA) Submittal Instructions (APRIL

2015) DMEA

(a) As prescribed in Defense Federal Acquisition Regulation Supplement (DFARs) clause 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports (JUN 2012), Contractors must submit payment requests in electronic form. Paper copies will no longer be accepted or processed for payment unless the conditions of DFARS clause 252.232-7003(c) apply. To facilitate this electronic submission, the Defense Microelectronics Activity (DMEA) has implemented the DoD sanctioned Wide Area Workflow-Receipt and Acceptance (WAWF-RA) for contractors to submit electronic payment requests and receiving reports. The IUID Registry is now incorporated into these WAWF capabilities therefore IUID data will be submitted “as part of the Material Inspection and Receiving Report”. All contracts containing the DFARS clause 252.211-7003, Item Unique Identification and Valuation, must enter the IUID data. The contractor shall submit electronic payment requests and receiving reports via WAWF-RA.

To access WAWF, go to https://wawf.eb.mil//

Table 1 - Vendors shall “Send More Email Notifications” in WAWF-RA to:

Government Points of Contact Email address

Contracting Officer Representative (COR)/Project Technician David.Elliott@dmea.osd.mil

Contract Specialist or Contracting Officer Jarrod.washington@dmea.osd.mil

WAWF Administrator Zonel.Laborde@dmea.osd.mil or Anna.Madden@dmea.osd.mil

WAWF MailBox contractingWAWF@dmea.osd.mil

Additional notification Jason.cohick@dmea.osd.mil

(b) Definitions:

Acceptor: Contracting Officer’s Representative/Project Engineer/Program/Project Manager, or other government acceptance official.

Pay Official: Defense Finance and Accounting Service (DFAS) payment - HQ0131

SHIP To/Service Acceptor DoDAAC: - HQ0727

(c) WAWF Contractor Input Information. The contractor shall input the selected Document Type creating electronic payment requests in WAWF:

__X “Combo” for Materials and or Services

____ “2-in-1 Invoice” Services Only

____ “Invoice” for Construction.

____ “Performance-Based Payments (PBP)”

Table 2 - For WAWF Routing Information based on Contract Type

Description SF 26 SF 33 SF 1442 SF 1449 DD 1155

Located In Block /Section

Contract Number

Delivery Order

See Individual Order

See Individual Order

N/A

CAGE Code 7 15a 14 17a 9

Pay DoDAAC 12 HQ0131 25 HQ0131 27 HQ0131 18a HQ0131 15 HQ0131

Inspection/Acceptan ce

Section E or INSPECTION AND ACCEPTANCE

Issue Date 3 5 3 3 3

Issue by DoDAAC 5 HQ0727 7 HQ0727 7 HQ0727 9 HQ0727 6 HQ0727

Admin DoDAAC 6 HQ0727 24 HQ0727 26 HQ0727 16 HQ0727 7 HQ0727

Ship To/Service Acceptor DoDAAC

6 HQ0727 24 HQ0727 26 HQ0727 16 HQ0727 7 HQ0727

Ship to Extension Do Not Fill In

Services or Supplies Based on majority of requirement as determined by monetary value

Final Invoice? Do not change “N” (no) to “Y” (yes) unless this is the last invoice and the contract is ready for closeout

COR/Project Engineer

The point of contact for the ship to address in Section F – Delivery Information

(d) Invoices - Invoice 2-n-1 (Services Only) and Invoice and Receiving Report (Combo) and PBP:

When submitting the final invoice for payment for a contract, select the “Y” selection from the “Final Invoice?”

drop-down box.

Upon successful submission of the invoice, click on the Send More Email Notifications link to send to email addresses listed in Table 1 above.

(e) WAWF Training may be accessed online at http://www.wawftraining.com//. To practice creating documents in WAWF, visit practice site at https://wawftraining.eb.mil//. General DFAS information may be accessed using the DFAS website at http://www.dfas.mil/. Payment status information may be accessed using the myInvoice system at https://myinvoice.csd.disa.mil// or by calling the DFAS Columbus helpdesk at 800-756-4571. (Select Option 2, then Option 2 again) Your contract number and shipment/invoice number will be required to check status of your payment.

(End of Clause)

52.237-9002 Contractor Manpower Reporting Application (CRMA) Instruction

The contractor shall ensure ALL contractor labor hours (including subcontractor labor hours) required for the performance of services provided under this contract are…