Street_Sweeping_QASP_5-16-18.pdf
PDF 412 KB Posted
- Attached to
- Street Sweeping Program Federal contract opportunity
- Solicitation number
- HQ003418R0213
- Issued by
- DOD Washington Headquarters Service
About this file
Quality Assurance Surveillance Plan (QASP)
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBINED_SYNOPSIS_-_Street_Sweeping_-_REVISED_7-25-2018.pdf | ||
| AMENDMENT_I_-_Street_Sweeping.pdf | ||
| Attachment_A_-_Price_Schedule_REVISED.xlsx | XLSX spreadsheet | |
| COMBINED_SYNOPSIS_-_Street_Sweeping_FINAL.PDF | ||
| Pentagon_Map_with_Zones_4-17-18.pdf | ||
| Attachment_A_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pentagon Street Sweeping Program
Quality Assurance Surveillance Plan
Contract Number HQ0034-18-P-XXXX
1. Purpose
This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to ensure that systematic quality assurance methods are used in the administration of this contract. The intent is to ensure that the Contractor performs in accordance with the performance standards/acceptable quality levels contained in the
Performance Work Statement (PWS); that the Government receives the quality of services called for in the contract; and, that the Government only pays for the acceptable level of services received. The QASP is a living document and subject to periodic changes at any time.
2. Scope
It is important to understand the responsibilities of the parties and distinguish between the
Quality Control Plan (QCP) and the QASP. The Contractor is responsible for managing and developing a QCP to meet the quality standards established in the PWS. The QASP is put in place to provide Government surveillance and oversight of the Contractor’s efforts in meeting the performance standards required by the contract. The QASP is not part of the contract nor is it intended to duplicate the Contractor’s QCP. The Government may provide the Contractor with an informational copy of the QASP to support the Contractor’s efforts in developing and maintaining a robust quality control program that will interrelate with the QASP.
The QASP or any other Government resources are “not” to be used in lieu of the Contractor’s quality control program. It is the Contractor’s full and complete responsibility to monitor its own street sweeping activities and make corrections before the Government identifies nonperformance as deficiencies as outlined in this QASP.
3. Roles and Responsibilities
The following personnel will implement all surveillance activities:
Contracting Officer (KO) - The KO ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract, and safeguards the interests of the
United States in the contractual relationship. It is the KO that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The KO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and assures proper Government surveillance of the Contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract price, terms, or conditions shall be referred to the KO for action.
Project Manager (PM) - The Contractor’s PM provides detailed technical oversight of the
Contractor’s performance and reports progress, issues, and other key project information to the
COR in a timely and complete fashion to support the COR’s administration activities. The PM is the primary technical and managerial interface between the Contractor, KO, and the COR.
Quality Control Inspector/Safety Inspector (QCI/SI) – The Contractor’s QCI/SI performs inspections of all work performed in compliance with the Contractor’s Government-approved
QCP. It is the Contractor’s full and complete responsibility to monitor its own custodial activities and make corrections before the Government identifies nonperformance as deficiencies as outlined in this QASP.
4. Methods of QA Surveillance
The methods of surveillance listed below shall be used in the administration of this QASP. The specific surveillance method for each performance standard and acceptable quality level is listed in the Surveillance Activity Summary Form (ATTACHMENT A).
COR Review - Indicates that the COR will be responsible for monitoring the Contractor’s performance in meeting a specific performance standard/acceptable quality level.
In the case of a written deliverable, COR Review will consist of 100% inspection of the specific deliverable and supporting documentation.
In the case of day-to-day support activities, COR Review will consist of periodic surveillance or random monitoring.
Customer Feedback - Customer feedback may be obtained either from the results of formal
Government customer satisfaction surveys or from customer complaints. Customer complaints will be documented in writing (ATTACHMENT B) describing the nature of the complaint. The
COR will assess the validity of the complaint and retain it in a documentation file. An unscheduled inspection will take place following the customer’s complaint and the COR will assess the worksite to determine if the services provided by the contractor were made unsatisfactorily. If service is incomplete, the COR will contact the contractor for remediation within the allocated time in the Response to Customer Complaints section of this QASP.
The results of all monitoring activity shall be documented on the Surveillance Activity Summary
Form (ATTACHMENT A). Copies of the form shall be submitted to the KO as requested, at the conclusion of contract performance, and whenever contractor performance fails to meet acceptable quality levels.
5. Periodic Surveillance
The Government’s Quality Assurance (QA) program includes regular inspections, however due to sheer size of the Pentagon Reservation, it is not possible to visit every location on a reoccurring inspection. The Government will conduct periodic surveillance activities to monitor the Contractor’s performance during periods of street sweeping. The Government will inspect swept areas. Deficiencies identified during this time frame will be considered a QA “Failure”.
6. Response to Customer Complaints
The COR will report all valid complaints to the Contractor in writing. The Contractor shall respond to these validated complaints after receipt of notice and provide resolution to the problem within 24 hours. The Contractor shall submit written documentation of service follow-up and response time to the COR within 24 hours of service completion. The Contractor will be given one opportunity to correct any deficiencies within the allotted time frame as stated above.
Should the Contractor fail to correct per contract requirements within 24 hours after the COR’s written request, the Government reserves the right to have the complaint resolved by other means and charge the Contractor for any excess costs.
7. Documentation
The COR or designee will, in addition to providing documentation to the KO, maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, surveillance checklists, and any actions related to the Government’s performance of the quality assurance surveillance function. All such records will be retained for the life of the contract and forwarded to the KO upon completion.
8. Maintenance
The Contractor shall maintain all equipment used in the performance of this contract. All
Contractor supplied equipment shall be in good physical and mechanical condition, without fuel, hydraulic, or other leaks. All equipment shall be in good working order to retain and not spill material collected during sweeping.
9. Acceptable Quality Level (AQL)
The AQL for this project is 95% due to the need to prevent pollutants from entering local waterways and adhere to the maximum loads of pollutants that can be discharged under the
Small Municipal Separate Storm Sewer System (MS4) permit.
10. Contractor Performance
Performance Evaluation
The Government will document performance within the Contractor’s annual Contractor
Performance Assessment Reporting System (CPARS) report. Government acceptance of services permits the Contractor to invoice for the service fee. In evaluating the quality of
Contractor’s performance, the following CPARS performance ratings may be used:
Performance
Rating Criteria
Exceptional
Performance meets contractual requirements and exceeds many to the
Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance meets contractual requirements and exceeds some to the
Government’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
Marginal
Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the
Contractor has not yet identified corrective actions. The Contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the Contractor’s corrective actions appear or were ineffective.
Unacceptable Performance
Unacceptable Contractor performance can be identified by customer complaints or upon scheduled or unscheduled surveillance evaluations. When unacceptable performance occurs, the
COR will inform the Contractor. This will normally be in writing unless circumstances necessitate verbal communication (e.g., safety concerns). The COR will document the discussion and place it in the COR file and provide a copy to the KO.
When the COR determines formal written communication is required, the COR will prepare a
Corrective Action Report (CAR) (ATTACHMENT C). The CAR is forwarded to the KO for dissemination to the Contractor.
The Contractor shall acknowledge receipt of the CAR in writing. The CAR will specify if the
Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CAR will also state how long after receipt the Contractor has to present this corrective action plan to the KO and COR. The
Government may withhold payment for services until corrective action is taken. The
Government shall review the Contractor's corrective action plan to determine acceptability.
Upon Government acceptance of the corrected services the Contractor will be permitted to invoice for the service fee. The CAR is in addition to, and does not replace, the CPARS report.
Any CAR may become a part of the supporting documentation for contract payment deductions, CPARS, or other actions deemed necessary by the KO.
ATTACHMENT A
SURVEILLANCE ACTIVITY SUMMARY FORM
Required
Service
Performance
Standard
Acceptable
Quality Level
(AQL)
Surveillance
Methods
Monitoring
Performed by
(Date(s))
Compliance with
Performance
Standard/AQL
(Yes/No)
Street Sweeping
All accessible exterior hard surface areas are free of accumulated and loose sand, grit, litter, trash, leaves, and other organic matter.
95%
Periodic surveillance.
Street Sweeping During the course of one month, all exterior hard surfaces have been swept.
Sweeping is performed by vacuum-assisted and/or regenerative air street sweeper.
The Contractor has cleaned up after each instance of sweeping.
Respond to validated complaints after receipt of notice and provide resolution to the problem within 24 hours.
95%
Validated customer complaints.
Submit written documentation of service follow-up and response time to the COR within
24 hours of service completion.
Correct any deficiencies with one opportunity within the allotted time frame as stated above.
Should the Contractor fail to correct per contract requirements within 24 hours after the COR’s written request, the Government reserves the right to have the complaint resolved by other means and charge the Contractor for any excess costs.
ATTACHMENT B
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION BUILDING
NUMBER
INDIVIDUAL PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
ATTACHMENT C
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER
NUMBER
2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND
DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES
THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH
ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF
DEFICIENCY BOX WAS CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE
CONCUR NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED
COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR
REASON FOR NON-CONCURRENCE OF COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
16. CONTRACTOR REPRESENTATIVE REMARKS
File details come from the government source that posted it.