Attached are the responses to the RFI Submissions.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Submissions for HQ0034-18-R-0149; Pentagon Memorial Lighting Repair

Q#1 RFP Page RFP Section/ Paragraph

Question Answer

0001 8

2.1.1/N 2.1.1, K states that all junction boxes are preferred to be NEMA 4X wall mounted above ground unless installed in-ground. Is the junction box for the concrete duct bank that is to be installed in the memorial space to be installed above ground (2.1.1, N)?

The offeror needs to select the location during design development. The offeror needs to meet the requirement of para 2.1.1.K.

0002 8

2.1.1/K

Contractor assumes that for replacing the main conduit trunk line located along the Perimeter Bench/Agewall that the new junction boxes are to be installed above ground and wall mounted per 2.1.1, K, please confirm.

Yes, all junction boxes shall be installed per para 2.1.1.K.

0003 8

2.1.1/M Provide an assumed length or end location for pricing purposes for the four (4) new dedicated 20A circuits that are to be installed (2.1.1, M).

Please refer to para 2.1.1.N.

0004 Attachment A/18- Technical Requirement As-Built Drawings

N/A Are the maintenance outlets and receptacles located throughout the memorial space to be replaced?

Yes

0005 9

2.1.3/A

Is the tie-in point for the new Lighting Control System to connect to the Pentagon Building Automation System located in the ECC?

Yes

0006 8 2.1.1/G

Please define the requirements for air pressure testing the conduits.

The offeror needs to develop a plan for testing. Government will review and approve the plan.

0007 5 1.2 1.2 states that all conduit must be replaced. Does this include existing conduits that are embedded in concrete in the age wall?

No. Existing concrete walls are not to be disturbed.