BOS_Quality_Assurance_Surveillance_Plan_.doc
DOC document 94 KB Posted
- Attached to
- RRMC Base Operations and Support Services (BOS)
- Solicitation number
- HQ0034-15-R-0006
- Issued by
-
DOD Washington Headquarters Service
About this file
QASP
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HQ0034-15-R-0006_Amendment_0003_Q A.pdf | ||
| ATTACHMENT_J-L1.doc | DOC document | |
| HQ0034-15-R-0006-0002.pdf | ||
| HQ0034-15-R-0006-0001.pdf | ||
| ATTACHMENT_J-L2.doc | DOC document | |
| HQ0034-15-R-0006_Solicitation.doc | DOC document | |
| WD_05-2455_(Rev._-_16)_dated_30_Dec_2014.pdf | ||
| ATTACHMENT_J-L3.doc | DOC document | |
| J-B1_Pricing_Submission_Worksheet.xls | XLS spreadsheet | |
| ATTACHMENT_J-L1.doc | DOC document | |
| VASS_RRMC_Attachment.xls | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
PAGE
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Washington Headquarters Services/Raven Rock Mountain Complex
Base Operations Support (BOS) Services Dated: 1May, 2015
TABLE OF CONTENTS
INTRODUCTION
11.1 Purpose
11.2 Performance Management Approach
11.3 Performance Management Strategy
ROLES AND RESPONSIBILITIES
22.1 The Contracting Officer
22.2 The Contracting Officer’s Representative
2.3 The Quality Assurance Representative
IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
METHODOLOGIES TO MONITOR PERFORMANCE
24.1 Surveillance Techniques
34.2 Customer Feedback
34.3 Acceptable Quality Levels
QUALITY ASSURANCE DOCUMENTATION
35.1 The Performance Management Feedback Loop
35.2 Monitoring Forms
ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
46.1 Determining Performance
46.2 Reporting
46.3 Reviews and Resolution
5ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
6ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS) entitled Base Operation Support (BOS) Services. This plan sets forth the procedures and guidelines Raven Rock Mountain Complex (RRMC) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by RRMC to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
The contracting officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer's Representative (COR) and Quality Assurance Representative (QAR) and the contractor. The CO will designate one full-time COR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The Contracting Officer’s Representative
The Contracting Officer’s Representative (COR) is designated in writing by the CO to act as his or her authorized representative to assist in administering a contract. COR limitations are contained in the written appointment letter. The COR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The COR will have the responsibility for ensuring the QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
2.3 The Quality Assurance Representative
The Quality Assurance Representative (QAR) is designated in writing by the CO to serve as a technical inspector for a particular area of the BOS Contract (Dining Facility, Custodial, Logistics, Roads & Grounds, Transportation, and other Task Orders). QAR limitations are contained in the written appointment letter. The QAR is responsible for technical inspections of the services and ensures proper government surveillance of the contractor’s performance. The QAR is not empowered to make any contractual commitments or to authorize any contractual changes on the government’s behalf. Any changes that the contractor deems may affect contract price, terms, or conditions shall be referred to the CO for action. The QAR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and in Attachment 1, “Performance Requirements Summary.” If the contractor meets the required service or performance level, it will be paid the monthly amount agreed on in the contract. Failure to meet the required service or performance level may result in a deduction from the monthly amount.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
In an effort to minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random monitoring, which shall be performed by the COR designated inspector.
· Periodic Inspection – COR performs the periodic inspection on a monthly basis.
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the CO or COR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COTR/COR. The COTR/COR will accept those customer complaints and investigate using the Quality Assurance Monitoring Form – Customer Complaint Investigation, identified in Attachment 3.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Performance Requirements Summary Table, for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls. For certain critical activities such as those involving Security, the desired performance level. Other levels of performance are keyed to the relative importance of the task to the overall mission performance at RRMC.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed using the performance monitoring techniques shown in Attachment 1.
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the COR, will be reported using the monitoring forms in Attachments 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure that the required results “MET” are being achieved.
5.2.1 The COR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the AQL may result in a deduction from the monthly payment, using the deduction percentages shown in Attachment 1.
6.2 Reporting
6.2.1 At the end of each month, the QAR will prepare a written report for the COR summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This written report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms, will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The COR may require the contractor’s project manager, or a designated alternate, to meet with CO and other government IPT personnel as deemed necessary to discuss performance evaluation. The CO/COR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with COR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
· Issues arising from the performance monitoring processes]
6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The COR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the PCO/ACO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Performance Objective
| Standard |
| Performance Threshold |
Method of Surveillance
PRS # 1
The contractor shall provide Custodial Services per Part 5.2 of the PWS.
The contractor provided Custodial Service Tasks identified in Part 5.2 of the PWS.
| 95% and no more than one customer complaint per report. |
| COR will conduct semi-weekly periodic surveillance and conduct 100% review of customer complaints. |
PRS # 2
The contractor shall provide Full Service Dining Facility Services per Part 5.3 of the PWS.
| The contractor provided Full Service Dining Facility Service Tasks identified in Part 5.3 of the PWS |
| 95% and no more than one customer complaint per report |
| COR will conduct semi-weekly periodic surveillance and conduct 100% review of customer complaints. |
PRS # 3
The contractor shall provide Logistic Services per Part 5.4 of the PWS.
| The contractor provided Logistic Service Tasks identified in Part 5.4 of the PWS |
| 95% and no more than one customer complaint per report |
| COR will conduct semi-weekly periodic surveillance and conduct 100% review of customer complaints. |
PRS # 4
The contractor shall provide Transportation Services per Part 5.5 of the PWS.
| The contractor provided Transportation Service Tasks identified in Part 5.5 of the PWS |
| 95% and no more than one customer complaint per report |
| COR will conduct semi-weekly periodic surveillance and conduct 100% review of customer complaints. |
ATTACHMENT 2: QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD:
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check):
Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________
DATE: _________________
PAGE
i
File details come from the government source that posted it. Updated .