HPAC SOW (1).pdf

PDF 251 KB Posted

Attached to
Amended High Pressure Air Compressor Rental
Solicitation number
N4215826QC004
Issued by

About this file

This is a Statement of Work (SOW) for the rental of three self-contained high-pressure (HP) compressed air systems to be delivered to Norfolk Naval Shipyard (NNSY) in support of the Ford Project at Pier 5A, Portsmouth, Virginia. Job Order 3878J99208 S03.

The compressed air systems must deliver a minimum of 92 Standard Cubic Feet per Minute (SCFM) at 5,000 psig and be certified for breathing air quality per OPNAVINST 5100.23 and OSHA regulations. Air quality specifications include oxygen levels of 19.5 to 23.5%, carbon dioxide not exceeding 1,000 ppm, carbon monoxide not exceeding 10 ppm, hydrocarbons not exceeding 0.005 milligrams/liter, supply temperature of 115°F maximum, dew point of -70°F at atmospheric pressure, oil content not exceeding 0.1 ppm by weight, and particulates not exceeding 5 microns nominal and 18 microns absolute. Each system must be electrically powered (460-Volt, 3-phase, 60Hz, 100 Amps maximum), self-contained, capable of 24-hour/day operation, and include a compressor, air dryer, closed-loop cooling system, filtration/purification system, after-cooler with automatic water drain, air receiver, electronic hygrometer, and CO monitor that alarms at 10 ppm. All equipment must be housed in a single portable, forklift and crane-transportable container not exceeding 8 feet wide by 20 feet long by 10 feet high, with weather-resistant components meeting NEMA Type 4 standards for outdoor use in salt water environments.

The contractor must deliver and retrieve the systems at no additional cost, provide on-site startup training lasting no more than one workday, supply all replacement cartridges/filters and consumables (oil, antifreeze) at no extra cost throughout the rental period, provide 24/7 on-call repair service with 24-hour response time and 72-hour equipment replacement guarantee, and submit engineering documentation and quality evidence demonstrating compliance with all specifications at least two months prior to the start of performance. The contractor is responsible for loss or damage from the time equipment leaves the government site until returned. The Period of Performance includes options to extend the contract for up to two six-month periods in one-month increments, with prorated charges based on actual NNSY usage only. The government reserves the right to return equipment at any time with 24-hour notice. All contractor personnel must comply with OSHA requirements, Hazardous Energy Control procedures, DBIDS badging requirements, and portable electronic device policies as specified in the SOW. Appendix A details required electrical and mechanical interface connectors for NNSY Shop 99 hookup, including specific cable types and camlock connectors based on amperage requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

(H. P. Air Compressor Rental)

1. Scope:

1.1 Title: Ships Service High Pressure (HP) Air

1.2 Job Order: 3878J99208 S03

1.3 THREE (3) each Self-contained compressed air system used to supply high-pressure air for ship service applications including breathing air. The compressed air system will include a compressor, air dryer, closed loop cooling system and other components required to meet the specifications below.

1.4 Location of work:

1.4.1 NORFOLK NAVAL SHIPYARD (NNSY) Inside NNSY waterfront CIA area in support of the Ford Project at Pier 5A. (location subject to change within NNSY or externally to Naval Station Norfolk (NSN)).

2. Reference:

2.1 OPNAVINST 5100.23G

2.2 Federal Specification RR-C-271D

3. General Specifications:

3.1 COMPRESSED AIR SUPPLY PARAMETERS:

3.1.1 The compressed air system shall supply a Free Air Delivery (FAD) of at least 92 SCFM of air at a pressure of 5,000 psig. The compressed air supplied by the compressed air system shall be certified for breathing air quality per paragraph 15008 of OPNAVINST 5100.23, latest rev, or the applicable OSHA regulations for compressed breathing air supply. The air quality specifications for breathing air and ship service are as follows:

a. Oxygen: 19.5 to 23.5%

b. Carbon Dioxide (by volume): 1000 ppm maximum

c. Carbon Monoxide (by volume): 10 ppm maximum

d. Hydrocarbons (condensed): 0.005 milligrams/liter maximum

e. Supply temperature: 115oF maximum

f. Water content: Not to exceed a dew point of (-70oF) at atmospheric pressure (18 ppm by volume).

g. Compressed air oil content shall not exceed 0.1 ppm by weight.

h. Dirt/particulate: Not to exceed 5 microns nominal and 18 microns absolute.

3.1.2 The compressed air system shall have controls which start and stop the compressor when pressure set points are met at the compressor discharge. The set points shall be adjustable by the customer. The set points shall have a range of adjustability between 3000 and 5000 psi.

3.2 EQUIPMENT REQUIREMENTS:

3.2.1 The compressed air system shall be electrically powered, suitable for a 460-Volt, 3-phase, 60HZ, and 100 Amps max power supply. The compressed air system shall be self-contained so that the system is capable of producing breathable quality, compressed air WITHOUT any additional utilities such as a water supply.

3.2.2 The compressors must be capable of running 24 hours/day, 7 days/week.

3.2.3 The compressed air system shall be self-regulating with fully automatic controls, alarms, and indicators so that the compressor package requires monitoring no more than once every 24 hours by compressor operators after start-up.

3.2.4 The compressed air system shall include the following accessory equipment and any other equipment necessary to meet the requirements of this specification:

a. A filtration/purification system as required allowing the output compressed air to be certified for breathing air supply, per section

3.1.1 above.

b. Air filter, for the purpose of oil removal, shall be installed between the compressor and dryer. This requirement also applies to oil-less compressors.

c. An air dryer system to ensure the output compressed air meets the required water content specification per 3.1.1.f. The dryer is to be a heatless, twin tower design of regenerative nature utilizing hygroscopic desiccant with automatic condensate purges. One tower shall provide dry air while the other is in regeneration mode.

d. An air-cooled after-cooler with an automatic water drain trap to remove condensed moisture from the compressed air. The after-cooler shall cool the compressed air to within 15oF of ambient temperature at a continuous load of either 92 SCFM FAD at 5,000 psig or the rated capacity of the compressor at 5000 psig, whichever is higher.

d. An air receiver to minimize cycling.

e. An electronic hygrometer that provides real-time outlet dew point temperature for easy moisture content monitoring shall be included.

3.2.5 Each compressed air system will have a CO Monitor installed to alarm and secure the compressor upon a high CO reading of 10 PPM.

3.2.6 Unit will be in continuous use outdoors, and will be directly exposed to everyday weather and salt water air. All exposed components must be weather resistant.

All components must meet or exceed NEMA Type 4 for outdoor use.

3.2.7 After the contractor receives the contract and at least two months prior to the start of the Period of Performance, the contractor shall perform a successful test of the final compressed air system set up and provide a digital copy of all engineering data and Objective Quality Evidence to NNSY Technical POCs that shows the compressed air system setup meets all requirements of this Statement of Work.

3.3 CONSTRUCTION

3.3.1 The compressed air system shall be wholly contained in one container or skid.

The containers shall be constructed to be portable, capable of being both transported by forklift and crane.

3.3.2 If containers are utilized they shall have louvers to prevent water intrusion during rain while system is in operation.

3.3.3 The installed compressed air system, including the compressor and all accessory equipment, shall together occupy a volume with dimensions which do not exceed 8’-0” wide by 20 ’-0” long by 10’-0” high.

3.3.4 The compressed air system shall comply with the applicable OSHA regulations.

3.3.5 The compressed air system shall comply with the applicable ASME Boiler and

Pressure Vessel Code.

3.3.6 The compressor condensate discharge shall be equipped with a flexible hose at least twelve (12) feet in length to permit users the option of directing condensate into a user-supplied containment drum.

3.3.7 The compressed air system shall include drip pans or trays to capture and contain fluid leaks.

3.3.8 Relief valves shall have intact wire seals on their adjustment caps and shall bear tags indicating the set point, testing activity and test date.

3.3.9 Pressure gauges shall be in calibration to manufacturer standards and shall bear labels showing calibration which will not expire during the contract period.

3.3.10 Power cable end fittings will be lugged and color coded to indicate proper phasing. See Appendix A of this section – “Interface Requirements for Rental Equipment Hook-up to NNSY Temporary Service” for proper electrical connections required.

3.3.11 The outlet from the compressed air system shall have a cut-out valve for isolation purposes and the end fitting of the compressed air outlet will be ½” male 6000# CPV Union End fitting. See Appendix A of this section– “Interface Requirements for Rental Equipment Hook-up to NNSY Temporary Service” for proper mechanical connections required.

3.3.12 Discharge piping will have a 90o fitting in order to eliminate the kick hazard.

3.3.13 Inlet air filter will be Polymer in lieu of paper filters.

3.3.14 The equipment shall be outfitted with suitable attachments for overhead lifting.

3.3.15 Each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength.

3.3.16 Each lifting attachment shall be designed to accept a standard anchor shackle

(Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment.

3.3.17 Design of the lifting attachments shall be such that the shackles are not side loaded.

3.3.18 Each lifting attachment shall be conspicuously marked in a contrasting color “Lift Here”. Letters shall have a minimum height of 1”.

3.3.19 The equipment shall be marked in a prominent location with the gross weight.

Marking shall be upper case letters of a contrasting color, with a minimum height of 1”. Marking shall include the units (i.e. “pounds”, “long tons”, etc.).

3.3.20 The equipment shall be provided with a lifting sketch / rigging diagram.

3.3.21 The lifting sketch shall detail any specific requirements and / or configurations that must be met prior to lifting (i.e. “engage swing lock”, “Tilt mast back fully”, “Rotate lifting basket over side”, “Utilize 10’ minimum length slings”, “Spreader beam required”, etc.).

3.4 MARKINGS:

3.4.1 The compressed air system shall have the (1) air capacity, (2) maximum supply pressure and (3) the electric motor horsepower and RPM rating stamped on a metal plate attached to the equipment. Each major component of the system, including, but not limited to the compressor, electric motor, air dryer, and the purification system shall have the manufacturer's name and the manufacturer's serial number stamped on a metal plate attached to the component. No metal stamping is permitted on any surface subjected to high stresses in service, except as permitted by the applicable portions of the ASME Boiler and Pressure Vessel Code.

4. Period of Performance:

4.1 SEE SCHEDULE (Allow for change of date. Start time may change due to ship’s schedule.) Contract shall include the option to extend the contract for up to two (2) each six (6) month periods in one (1) month increments. Rental extensions may terminate the rental of one or more units based on use by NNSY. This charge will be prorated.

5. Contractor Requirements:

5.1 Contractor shall supply POC’s information (name and phone number) on the equipment.

5.2 Deliver and retrieve the compressed air system at Norfolk Naval Shipyard, Portsmouth Virginia, inside the CIA area at no additional charge to the government. Exact location to be determined at delivery by the Temporary Service Zone Manager (TSZM).

5.3 Upon arrival to NNSY for compressed air system delivery, contractor shall contact TSZM for information regarding placement of the compressed air system at NNSY job site.

5.4 If necessary, after delivery, connect any accessory equipment to the compressed air system. Ensure the compressed air system is set up and ready for NNSY to connect shipboard when required.

5.5 Provide start up training for compressed air system on-site at location of work.

Contractor shall coordinate with the Temporary Service Zone Manager and the Technical POC to determine a time when the project is ready for the compressed air system to be started. Training shall include how to operate the system and the basic monitoring/visual checks that are required on a daily basis. Training shall require no more than one instructor and shall last no longer than one workday.

5.6 During start up training, Contractor shall operate the compressed air system and supply air meeting the specified dew point and oil content for at least one continuous hour. Government sampling and laboratory testing shall validate the dew point and oil content (note: it will take a few days for the results to be received). Air and fluid leaks and all mechanical failures shall be corrected by the contractor at this time prior to acceptance by NNSY.

5.7 Contractor shall supply a written procedure for any cartridge/filter change-outs (if necessary) specifying the number of hours and how to accomplish the same and shall deliver the compressor with sufficient cartridges/filters to permit one complete cartridge/filter change-out.

5.8 Replacement cartridges/filters shall be supplied by the contractor throughout the rental period at no extra cost. These cartridges/filters will be replaced by the customer.

5.9 Contractors provide compressor oil, antifreeze, and/or any other consumables that are required for proper operation of the compressed air system/accessory equipment throughout the rental period at no extra cost. Contractor provides extra consumables to NNSY at the start up training.

5.10 Provide engineering drawings or sketches showing the general arrangement of the compressed air system. These drawings and sketches shall show the flow path through the compressed air system and all auxiliary equipment that are part of the compressed air system.

5.11 Provide a Standard Operating Procedure for the whole compressed air system (including the compressor, air dryer, after-cooler, air purification system, and all auxiliary equipment) in order for NNSY to be able operate the system properly.

5.12 Provide the separate commercial operating instruction manuals for the air compressor and all other major components of the compressed air system.

5.13 Provide 24 hour a day, seven-day a week on-call repair service during the rental period at no additional charge. The contractor will be responsible for initiating repairs on-site, at location of work, within 24 hours of verbal or written notification that the equipment has malfunctioned at no additional charge. The contractor will replace the malfunctioning unit or component if the compressed air system cannot be returned to service within 72 hours of being notified of the original malfunction at no additional charge. Provide all parts requiring repair or replacement under circumstances of normal equipment wear and tear at no additional charge.

5.14 When the equipment is required to be removed to the contractor's facility for repair or replacement, the contractor shall be responsible for loss or damage from the time it leaves the government site until it is returned to the government site.

5.15 Contractor personnel shall notify the Temporary Service Zone Manager (TSZM) for authorization prior to any work or maintenance on rental unit.

5.16 Lost items by Government personnel and equipment damaged beyond normal wear and tear, Contractor must submit a claim separate from rental. This is to be submitted no later than 60 days past the end of the rental period.

5.17 The Government reserves the right to return the unit at any time prior to the expiration of the rental period. The contractor agrees to prorate costs for the time the compressed air system in use by NNSY only. The Government agrees to give the contractor twenty-four (24) hours-notice for the return of the compressed air system if the return is prior to the expiration of rental period.

5.18 Contractor to provide options to allow NNSY to extend rental of compressed air system on a monthly basis. The Government reserves the right to extend the rental period on a monthly basis if necessary. The Government reserves the right to return the unit at any time prior to the expiration of the extension rental period.

The contractor agrees to prorate costs for the time the compressed air system in use by NNSY only.

5.19 Contractor to contact NNSY 10 business days prior to the end of rental period to confirm pickup date.

5.20 Preparation For Delivery:

5.20.1 The compressed air system must be preserved and packaged per the manufacturer's commercial practice. Packing shall be in a manner that will ensure acceptance by a common carrier and safe delivery at the destination. The shipping container and method of packing must comply with the Uniform Freight Classification Rules or other carrier regulation as applicable to the mode of transportation.

6. Government Responsibility:

6.1 Provide operators for equipment.

6.1.1 Perform basic monitoring/visual checks.

6.1.2 Replace any air filters/cartridges (supplied by the contractor)

6.1.3 Equipment movements.

6.1.4 Provide point of contact for delivery, escort and notification to contractor for rental pickup. (TSZM)

7. Points Of Contact:

7.1 Technical POC:

TBD

8. Safety Requirements:

8.1 "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements OSHE OSHECM Chapter Hazardous Energy Control (HEC) requirements or safety requirements for site specific location of the contract.

a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA’s Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer’s Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

b. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY’s public access web site:

http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

c. Names and contact information for NNSY LOTCs and/or the Building Monitor will be provided by NNSY TPOC and/or Contracting Officer Representative set forth elsewhere in this award document.

Defense Biometric Identification System and NAVSEA Badging (REQUIRED FOR ALL

CONTRACTS)

All contractors, with the exception of permanent party (or “seated” contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.

Procedure for receiving a DBIDS card:

a. Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY Sponsor/Contracting Officer’s Representative (COR).

b. The sponsor will complete the CVS spreadsheet utilizing the information on the completed SECNAV5512 forms and forward all documents to Commander Navy region Mid-Atlantic (CNRMA) for vetting.

c. CNRMA will add the contractor to the “179-Day List” which is utilized by the Pass and ID office to create the DBIDS card.

d. Once on the 179-Day List, the contractor may go to Pass and ID to have their DBIDS card generated.

e. Green NAVSEA access badges can be generated at this point with contractors providing proof of U.S. Citizenship (Birth Certificate/ US Passport).

Portable Electronic Devices (PEDs) (REQUIRED FOR ALL CONTRACTS)

A PED is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and/or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).

a. NAVSEA 04 Ser 04/281 IMPLEMENTATION PLAN FOR ALLOWING CAMERA-PORTABLE

ELECTRONIC DEVICES WITHIN THE CONTROLLED INDSUTRIAL AREA

b. NAVSEAINST 2200.1A PORTABLE ELECTRONIC DEVICES POLICY

c. SECPROMAN Vol 1 5510.36 Rev E

In accordance with ref (a), personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all

Security Islands. Camera enabled PEDs will remain unauthorized within Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas.

All PEDs, camera enabled or not, are still prohibited within NWAs and Open Storage Areas.

The allowance of camera enabled PEDs inside of the CIA and Security Islands does not negate existing photography policies. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA. Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the Code 1120 Security Director.

Submarine SPECIFIC PEDs Instructions: In accordance with COMSUBLANT/ COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.

Access to Classified Information or Spaces

All contractors executing this contract are required to have a minimum security clearance of ___________ (Completed by SME).

All contractors requiring access to classified information, or those spaces containing un-sanitized classified information, shall possess a final security clearance.

In addition to completing the steps above, if the contractor in accordance with the requirements of the contract, the contracting company’s Facility Security Officer is required to submit a visit request in the Defense Information System for Security (DISS) to Security Management Office (SMO) Code 001816.

The SMO Code(s) of the ship or command the contractor is visiting are not to be utilized.

After receiving a DBIDS card, their visit request, security clearance and access permissions (verified in DISS) are reviewed to ensure they meet the minimum security requirements set forth in the contract. Once verified, the contractor will receive the appropriate NAVSEA access badge.

RESTRICTED DATA SPECIFIC

All contractors requiring a red NAVSEA badge and access to Restricted Data (RD) shall have a final security clearance.

Red NAVSEA badge personnel may require access to Nuclear Areas, Nuclear Information, Nuclear equipment, Naval Nuclear Propulsion Information (NNPI), RD, and Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems.

A red NAVSEA badge is necessary for the execution of nuclear and some non-nuclear work;

inclusive of the propulsion plant and secondary spaces as well as those systems which support the propulsion plants which may not be located in the propulsion plant when any of those spaces can’t be sanitized.

Access to RD and the issuance of red NAVSEA badges will be issued in accordance with

NAVSEA M-5510.2.

CONTROLLED UNCLASSIFIED INFORMATION ACCESS

The DoD will provide information to contractors and will identify all information which is Controlled Unclassified Information (CUI) via the contracting vehicle, in whole or part, and will mark such documents, material, or media in accordance with this issuance.

When CUI is generated by non-DoD entities protective measures and dissemination controls, including those directed by relevant law, regulation, or government-wide policy, will be articulated in the contract, grant, or other legal agreement, as appropriate. DoD contracts must require contractors to monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. DoD contracts require contractors to report the potential classification of aggregated or compiled CUI to a DoD representative.

Contractors, pursuant to mandatory DoD contract provisions, will submit unclassified DoD information for review and approval for release in accordance with the standard DoD Component processes and DoDI 5230.09.

All CUI records must follow the approved mandatory disposition authorities whenever the DoD provides CUI to, or CUI is generated by, non-DoD entities in accordance with Section 1220- 1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., and this issuance.

SEATED CONTRACTOR SPECIFIC

All contractors who receive CACs and are granted access to Navy or NNSY information technology systems and are stationed at NNSY as their permanent work location are considered to be “seated” contractors.

All seated contractors will be required to report to BLDG 1502, 2nd floor to the Personnel Security Office (Code 1127) for check-in. Code 1127 will own the seated contractor in the system of record and will be responsible for the maintenance for the contractor’s security profile.

All seated contractors will be required to attend, at a minimum, the security education portion of NNSY New Employee Orientation.

The security education portion will contain, but is not limited to, Antiterrorism Level 1, Combatting Trafficking in Persons, Active Shooter training, Information Security, Personnel Security, and Operations Security Awareness training.

Further, all seated contractors will be required to complete all annual computer based security refresher training, which is tracked and verified by the training coordinator for the code to which the contractor is assigned.

APPENDIX “A”

Interface Requirements

For Rental Equipment Hook-up To NNSY Temporary Service

NOTE: All Rental Equipment received by NNSY must be supplied with proper interface connectors shown below to allow hook-up by NNSY Shop 99. There may be specific equipment that will require NNSY Shop 99 evaluation to determine proper cabling and connectors.

Mechanical Service: Shall have ½ inch male 6000# CPV Union End outlet connection interface.

110-120 VAC Service: Material Manufactured by Duraline 20 Amp or less- 3 foot tail of 12/3 cable w/3MT20 crowsfoot plug Over 20 Amp and up to 50 Amp : 3 foot tail of 6/3 cable w/3MT50 crowsfoot plug

440 VAC Service: Material Manufactured by Duraline 20 Amp or less- 3 foot tail of 12/4 cable w/ 4MT20 crowsfoot plug Over 20 Amp and up to 50 Amp- 3 foot tail of 6/4 cable w/ 4MT50 crowsfoot plug Above can also be used on 220VAC Any service over 50 Amp requires box cable

440 VAC 50-100 Amp Service: Material manufactured by Crouse Hinds 50- 100 Amps 3-5 foot length of 2/4 cable w/male camlock twist connectors:

Part Numbers:

Brass -A200036-2 Black Sleeve- A200706-7 White Sleeve- A200706-12 Red Sleeve-A200706-9

Over 100 and up to 225 Amps: 3- 5 foot length of 3 conductor 3/0 cable with camlock connectors:

Part Numbers:

Brass - A200038-2 Black Sleeve- A2000706-13 White Sleeve-A2000706-18 Red Sleeve- A2000706-15

Over 225 and up to 400 Amps: 5-15 length of 500 MCM cable w/camlock connectors:

Part Numbers:

Brass- A20028-2 Black Sleeve-A200056- White Sleeve-A200056-6 Red Sleeve- A200056-3

a. Oxygen: 19.5 to 23.5%
b. Carbon Dioxide (by volume): 1000 ppm maximum
c. Carbon Monoxide (by volume): 10 ppm maximum
d. Hydrocarbons (condensed): 0.005 milligrams/liter maximum
e. Supply temperature: 115oF maximum
f. Water content: Not to exceed a dew point of (-70oF) at atmospheric pressure (18 ppm by volume).
g. Compressed air oil content shall not exceed 0.1 ppm by weight.
h. Dirt/particulate: Not to exceed 5 microns nominal and 18 microns absolute.
3.1.2 The compressed air system shall have controls which start and stop the compressor when pressure set points are met at the compressor discharge. The set points shall be adjustable by the customer. The set points shall have a range of adjustabil...
3.2.1 The compressed air system shall be electrically powered, suitable for a 460-Volt, 3-phase, 60HZ, and 100 Amps max power supply. The compressed air system shall be self-contained so that the system is capable of producing breathable quality, com...
3.2.2 The compressors must be capable of running 24 hours/day, 7 days/week.
3.2.3 The compressed air system shall be self-regulating with fully automatic controls, alarms, and indicators so that the compressor package requires monitoring no more than once every 24 hours by compressor operators after start-up.
3.2.4 The compressed air system shall include the following accessory equipment and any other equipment necessary to meet the requirements of this specification:
a. A filtration/purification system as required allowing the output compressed air to be certified for breathing air supply, per section 3.1.1 above.
b. Air filter, for the purpose of oil removal, shall be installed between the compressor and dryer. This requirement also applies to oil-less compressors.
c. An air dryer system to ensure the output compressed air meets the required water content specification per 3.1.1.f. The dryer is to be a heatless, twin tower design of regenerative nature utilizing hygroscopic desiccant with automatic condensate p...
d. An air-cooled after-cooler with an automatic water drain trap to remove condensed moisture from the compressed air. The after-cooler shall cool the compressed air to within 15oF of ambient temperature at a continuous load of either 92 SCFM FAD a...
d. An air receiver to minimize cycling.
e. An electronic hygrometer that provides real-time outlet dew point temperature for easy moisture content monitoring shall be included.
3.3.1 The compressed air system shall be wholly contained in one container or skid. The containers shall be constructed to be portable, capable of being both transported by forklift and crane.
3.3.2 If containers are utilized they shall have louvers to prevent water intrusion during rain while system is in operation.
3.3.3 The installed compressed air system, including the compressor and all accessory equipment, shall together occupy a volume with dimensions which do not exceed 8’-0” wide by 20 ’-0” long by 10’-0” high.
3.3.4 The compressed air system shall comply with the applicable OSHA regulations.
3.3.5 The compressed air system shall comply with the applicable ASME Boiler and Pressure Vessel Code.
3.3.6 The compressor condensate discharge shall be equipped with a flexible hose at least twelve (12) feet in length to permit users the option of directing condensate into a user-supplied containment drum.
3.3.7 The compressed air system shall include drip pans or trays to capture and contain fluid leaks.
3.3.10 Power cable end fittings will be lugged and color coded to indicate proper phasing. See Appendix A of this section – “Interface Requirements for Rental Equipment Hook-up to NNSY Temporary Service” for proper electrical connections required.
3.3.11 The outlet from the compressed air system shall have a cut-out valve for isolation purposes and the end fitting of the compressed air outlet will be ½” male 6000# CPV Union End fitting. See Appendix A of this section– “Interface Requirements fo...
3.3.12 Discharge piping will have a 90o fitting in order to eliminate the kick hazard.
3.3.13 Inlet air filter will be Polymer in lieu of paper filters.
3.4.1 The compressed air system shall have the (1) air capacity, (2) maximum supply pressure and (3) the electric motor horsepower and RPM rating stamped on a metal plate attached to the equipment. Each major component of the system, including, but n...
5.1 Contractor shall supply POC’s information (name and phone number) on the equipment.
5.2 Deliver and retrieve the compressed air system at Norfolk Naval Shipyard, Portsmouth Virginia, inside the CIA area at no additional charge to the government. Exact location to be determined at delivery by the Temporary Service Zone Manager (TSZM).
5.4 If necessary, after delivery, connect any accessory equipment to the compressed air system. Ensure the compressed air system is set up and ready for NNSY to connect shipboard when required.
5.5 Provide start up training for compressed air system on-site at location of work. Contractor shall coordinate with the Temporary Service Zone Manager and the Technical POC to determine a time when the project is ready for the compressed air system...
5.6 During start up training, Contractor shall operate the compressed air system and supply air meeting the specified dew point and oil content for at least one continuous hour. Government sampling and laboratory testing shall validate the dew point ...
5.7 Contractor shall supply a written procedure for any cartridge/filter change-outs (if necessary) specifying the number of hours and how to accomplish the same and shall deliver the compressor with sufficient cartridges/filters to permit one complet...
5.8 Replacement cartridges/filters shall be supplied by the contractor throughout the rental period at no extra cost. These cartridges/filters will be replaced by the customer.
5.9 Contractors provide compressor oil, antifreeze, and/or any other consumables that are required for proper operation of the compressed air system/accessory equipment throughout the rental period at no extra cost. Contractor provides extra consumabl...
5.10 Provide engineering drawings or sketches showing the general arrangement of the compressed air system. These drawings and sketches shall show the flow path through the compressed air system and all auxiliary equipment that are part of the compre...
5.11 Provide a Standard Operating Procedure for the whole compressed air system (including the compressor, air dryer, after-cooler, air purification system, and all auxiliary equipment) in order for NNSY to be able operate the system properly.
5.12 Provide the separate commercial operating instruction manuals for the air compressor and all other major components of the compressed air system.
5.20 Preparation For Delivery:
5.20.1 The compressed air system must be preserved and packaged per the manufacturer's commercial practice. Packing shall be in a manner that will ensure acceptance by a common carrier and safe delivery at the destination. The shipping container and m...
APPENDIX “A”
Interface Requirements
440 VAC 50-100 Amp Service: Material manufactured by Crouse Hinds

File details come from the government source that posted it. Updated .