HOLLYHOCK (WLB 225B) UPDD PRICING SHEET.xls
XLS spreadsheet 56 KB Posted
- Attached to
- CGC HOLLYHOCK DRYDOCK
- Solicitation number
- 70Z08526QIBCT0036
- Issued by
- Not on record
About this file
This is a pricing sheet for the CGC Hollyhock (WLB 225B) Upkeep and Drydock (UPDD) project submitted under Coast Guard solicitation 70Z08526QIBCT0036. The document is a template designed to capture pricing data for drydock repair and maintenance services for the Hollyhock, a Coast Guard cutter homeported in Honolulu, Hawaii. The pricing sheet is structured to allow contractors to input labor rates, material costs, and other direct charges associated with vessel maintenance and repair work performed at the contractor's facility. This template serves as the primary mechanism for contractors to submit their cost proposals in response to the government's solicitation for drydock services, enabling standardized evaluation and comparison of competing bids for the comprehensive repair and upkeep of the vessel.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00003 Amendment.pdf | ||
| HOLLYHOCK 1449.docx | DOCX document | |
| SF30 A00002 FOR HOLLYHOCK 66.pdf | ||
| SF30 A00001 FOR HOLLYHOCK.pdf 66.pdf | ||
| HOLLYHOCK 1449.docx | DOCX document | |
| HOLLYHOCK DDFY26 SOLICITATION.docx | DOCX document | |
| JA FAR 12.102(a) Wartsila.pdf | ||
| HOLLYHOCK DDFY26 SOLICITATION.docx | DOCX document | |
| HOLLYHOCK DDFY26 SOLICITATION.docx | DOCX document | |
| HOLLYHOCK DDFY26 SOLICITATION.docx | DOCX document | |
| HOLLYHOCK (WLB 225B) UPDD RJS 26R0 SPECIFICATIONS.pdf | ||
| Attach 4 - Request for Clarifications Solicitation HOLLYHOCK.docx | DOCX document | |
| JA FAR 12.102(a) Rolls Royce.pdf | ||
| ATTACHMENT TIMKEN.pdf | ||
| Attach 3 - Past Performance Information Form HOLLYHOCK.docx | DOCX document | |
| ATTACHMENT MILCON.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC HOLLYHOCK (WLB-225B) UNPLANNED DRYDOCK AVAILABILITY FY2026 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | $0.00 | ||
| D-002 | Hull Plating, U/W Body, Inspect | JOB | $0.00 | ||
| D-003 | Controllable Pitch Propellers, Clean and Inspect | JOB | $0.00 | ||
| D-004 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | $0.00 | ||
| D-005 | Drydock | JOB | $0.00 | ||
| D-006 | Temporary Services, Provide - Cutter | JOB | $0.00 | ||
| D-007 | Sea Trial Performance, Support, Provide | JOB | $0.00 | ||
| D-008 | Compartment Insulation, General, Renew | JOB | $0.00 | ||
| D-009 | Piping Insulation, Renew | JOB | $0.00 | ||
| D-010 | Main Reduction Gear, Overhaul | JOB | $0.00 | ||
| D-011 | Independent NACE Inspector (Level 3), Provide | JOB | $0.00 | ||
| D-012 | Tenting, Provide | JOB | $0.00 | ||
| D-013 | Strain Gage Alignment, Checks | JOB | |||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items |
&C(11/6/2025) Draft-1 - Page &P of &N
File details come from the government source that posted it. Updated .