Holiday_Decoration_Services_(Addendum_#2_Revision).pdf
PDF 451 KB Posted
- Attached to
- Holiday Decoration Services
- Solicitation number
- 24-535-IFB
- Issued by
- Orange County, Orlando City, Florida
About this file
This is an Invitation for Bid (IFB) document from the Greater Orlando Aviation Authority for Holiday Decoration Services (24-535-IFB), seeking a qualified contractor to provide comprehensive holiday decoration services for a five-year term. The solicitation covers detailed requirements for decorating airport spaces, including multiple tree installations ranging from 7½' to 52' tall, various wreaths (36" to 60"), wall trees, office trees, centerpieces, displays, and associated set-up and take-down services. The bid was released on April 14, 2024, with a deadline for questions on May 1, 2024, and responses due electronically by May 14, 2024 at 11:00 am.
The pricing structure is extensive, with detailed pricing tables for five consecutive years covering repair, refurbishment, and refresh of holiday decorations, set-up and take-down services, and additional services. The pricing includes unit costs for various decoration items, labor (skilled and unskilled), installation/removal services, equipment rentals, and a contractor percentage mark-up. Bidders must demonstrate at least five years of experience in indoor holiday decorations, ability to handle trees exceeding 40 feet, provide proof of wall tree delivery, be registered in Florida, and meet specific insurance and certification requirements. The contract includes provisions for holiday décor rental, hourly decorating services, and flexible pricing for various holiday decoration needs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 24-535-IFB_Holiday_Decor_Services_Final.pdf | ||
| GENCON_07-27-21.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
24-535-IFB
HOLIDAY DECORATION SERVICES
RELEASE DATE: April 14, 2024
DEADLINE FOR QUESTIONS: May 1, 2024
RESPONSE DEADLINE: May 14, 2024,11:00 am
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://secure.procurenow.com/portal/goaa https://secure.procurenow.com/portal/%7bproject.government.code%7d
TABLE OF CONTENTS
INVITATION FOR BID
Holiday Decoration Services
I. Scope of Work II. Vendor Submissions
III. Pricing Tables
Attachments:
B - 24-535-IFB Holiday Decor Services Final
GREATER ORLANDO AVIATION AUTHORITY
1. Scope of Work
Please see the #Attachments section for technical specifications, and attachments.
1.1. Scope of Work
Please see the link below for all specifications, and attachments:
Attachment https://government-project.s3.us-west-2.amazonaws.com/85732/13aaa675-45d7-4cef-b9d5-73b530f893fe_24-535-IFB_Holiday_Decor_Services_Final.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4ELELNX7S%2F20240412%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20240412T170623Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjECkaCXVzLXdlc3QtMiJIMEYCIQDMlnx2veAEwGQqsnlejJN9zorAJHls7ivJtzshBWYCQAIhAM1icwAJuXZ2ufxUc54rMD2B68FwkzdmQ8%2F7LI78bNNhKoMFCGIQAhoMODkyMzY0Njg3NjcyIgyCvs6qHB2tK6oLZdYq4AQGC2H3K2rHWzSmcMbxVmMjE1aaUkgBVsKYsOI3goScwUyPMGKBfBU4W9%2BlC7vya5bBRy4M1hLa3g70zA34zg4LeVG6fgNQiLaWIQsZD8H739Bou5IvRy5yFHIqYuBvats8d%2B81i3Z2QWEKFTk2tSXK%2B6%2BeKd8De2bmcvfry2u3EEIfvMWTOQiN2L4%2BDkF3%2F17mKqcyJqnVR157LCqaX0lejEBdEMWuDlUEDuphy%2BKKrOStUvBygUSC0%2BJmOGFBSGGpZ5vnWyal2QnywOYOkEcVUJvGZq3K9j0i1XBno65sEhvBdzRnmAdeVrDQE3IUhILhk8Bfy32%2BYg%2BgYNsP6xSYEEikXgXNcF3G6uh0GCLj%2BRtGmG7PRrFybqxulSCvvBZAsmw9bZhjvKQ2ihnaMKW%2B%2BYzQhyr24V0uSjph91G2kC2rzbFqCQJGyi%2BhlV2RaDme4PDjJnNXTFXuxK3nvkzbz1q0YQW%2BWyqERMYMnLnKPgRSjnDG%2Ffg%2FXXUZsg9nemXG5CzN3b2qz7TJ54Bza4n2Yl8PfiKl3NhDCQw3QOrQLmReFDJSDGZl5iuaM%2Fs%2B4AbHgwuW1phdRqRoDe6cE5eG6COZNWS7u5%2FThPYqMM0tKw1nZ20kyTP0AE%2BrLIt6B7ZW1Fhq9dhSk717G478CSK3T2LHV4jwCCYHSQ922e5IFGH34s7uwdLFgfhSZPRejjxlWTtYERn06ywACCgods96Sb9znDXGXb%2FjD1k89Wl6z5SLxGGmh1HavZjNJEiel%2FR2a0VHulPCzZ%2BlAUfYatt5vwW9qZ7feH12YslNprMocDDR0eWwBjqaAaYf8AdkPpWXSQFmTtuVOLnCVFC5wJ9gcZRakYB113R%2BDBUFIvx77sWy0wueSltb2iXRNubQsRK2cp9I%2FExkO7SNaaApauL54qTnYJUd9W%2FxPyWWxTCYFMiMtPG2Tc7Yr8NA5noUGoO325pAxMjyF%2BWwuVZxH2iDl9OKeIADQUeJN3Jlqj9V4%2BjbcxBB%2FD3VWNZywLgIfoQUnvM%3D&X-Amz-Signature=ff285ebbbcefa260e35fba6f0718ddd6406701819238fe90fdd1576405e60a82&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%2224-535-IFB_Holiday_Decor_Services_Final.pdf%22&x-id=GetObject
2. Vendor Submissions
2.1. Respondent Company Name and Contact Information*
Provide the name of Respondent's company (including the name of any parent company), Include: Contact name and complete contact information of individual responsible for account (“Lead Individual”).
Maximum response length: 5000 characters
*Response required
2.2. Type of organization (corporation, sole proprietor, partnership, other)* Maximum response length: 200 characters
*Response required
2.3. Federal employer identification number*
Maximum response length: 200 characters
*Response required
2.4. Pricing Table*
Please confirm that you have completed the Pricing Table in OpenGov and have not included any additional pricing in your response elsewhere.
☐ Please confirm
*Response required
2.5. REVISIONS | ADDENDA | QUESTIONS & ANSWERS * Participant confirms that they have reviewed revisions and all answers to questions published and any addenda up until the bid closing date and have given consideration to all information in preparing the response to this solicitation. This is a confirmation of acknowledgement.*
☐ Please confirm
*Response required
2.6. I certify that I have read, understood and agree to the terms in this solicitation, and that I am authorized to submit this response on behalf of my company.*
☐ Please confirm
*Response required
2.7. Please confirm that your firm has completed and delivered a Wall Tree.
Please include date of delivery.*
*Response required
2.8. Registered with the State of Florida.*
Respondent shall be registered/qualified to do business in the State of Florida.
Upload a copy of such registration/qualification.
*Response required
2.9. Five Years’ Experience*
Respondent must provide proof of having a minimum of five years’ experience related to Indoor Holiday Decorations for events and large facilities of similar scope and size. Please provide dates, description of services, size of event or facilities and contact information that will validate this minimum requirement.
*Response required
2.10. Holiday Trees Exceeding 40 Feet*
Respondent must confirm that they have experience in setting up Holiday trees exceeding 40 feet.
☐ Please confirm
*Response required
2.11. Respondent must provide a list, at minimum, of three (3) entities to include contact information, project name and pictures to affirm its experience in setting up Holiday trees exceeding 40 feet, that were successfully completed. *
*Response required
2.12. Signed Contract.*
Please confirm that the Respondent is willing to sign the Contract set forth in this Solicitation, as amended, within ten (10) days after receipt of the Notice of Intent to Award. The Aviation Authority’s goal is that the terms and conditions stated in the Solicitation Documents will constitute the terms of the final Contract between the Aviation Authority and the successful Respondent, without significant or material change to such terms or conditions.
☐ Please confirm
*Response required
2.13. Proof of Insurability*
The submittal shall contain proof of insurability issued by a company currently authorized to do business in the State of Florida and with an A.M. Best Company rating of at least B+ and a Financial Size Category of "Class VI" or higher according to the most current edition of AM Best Rating for the required insurance(s) listed in the solicitation under Section: Insurance Requirements.
The Respondent’s submittal shall demonstrate ability to meet all portions listed in Section:
Insurance Requirements of this solicitation by providing evidence of one of the following: Certificate of Insurance on Acord form or form acceptable to Aviation Authority, signed affirmation of ability to comply from a licensed insurance agent, or insurance quote.
Please upload proof of insurability.
*Response required
2.14. Respondent’s Certification*
I have carefully examined the Solicitation document located in the e-Procurement Platform and any and all other documents accompanying or made a part of this Solicitation.
I hereby propose to furnish the goods or services specified in this Solicitation at the prices or rates quoted in my submittal. I agree that my submittal will remain firm for a period of up to one-hundred-twenty (120) days in order to allow the Aviation Authority adequate time to evaluate the submittals.
I confirm that all information contained in this Solicitation Response is truthful to the best of my knowledge and belief. I further confirm that I am duly authorized to submit this Solicitation on behalf of the Respondent as its act and deed and that the Respondent is ready, willing and able to perform if awarded the Contract.
I confirm, under oath, that this Solicitation is made without prior understanding, agreement, connection, discussion, or collusion with any other person, firm or corporation submitting a Solicitation for the same product or service. I further certify that no officer, employee or agent of the Aviation Authority or any other Respondent has a financial interest in this Solicitation. I further confirm that I have executed this Respondent's Certification with full knowledge and understanding of the matters therein contained and was duly authorized to do so.
☐ Please confirm
*Response required
2.15. Certification Regarding Prohibition Against Contracting with Scrutinized Companies*
This form shall be completed and signed by the Respondent’s duly authorized representative.
Failure to return the forms with the submittal may cause the Response to be deemed as non-responsive.
Please download the below documents, complete, and upload. Name the uploaded file:
"Scrutinized Companies Form."
• Certification_Regarding_Pro...
*Response required
2.16. E-Verification Certification Form*
This form shall be completed and signed by the Respondent’s duly authorized representative.
Failure to return the forms with the submittal may cause the Response to be deemed as non-responsive.
Please download the below documents, complete, and upload. Name the uploaded file: "E- Verification Certification Form".
• E-Verify_(1).docx
*Response required
2.17. Complete and Sign Conflict of Interest Disclosure Form* Please download the below Conflict of Interest Disclosure Form, complete, and upload. Name the uploaded file: "Conflict of Interest Form".
• Conflict_of_Interest_Disclo...
*Response required
2.18. Current W9*
Provide the Respondents Taxpayer Identification Number and Certification. Go to the following website for instructions and the latest information: www.irs.gov/FormW9
Please upload current signed W9. Name the uploaded file: "Current W9".
*Response required https://procure-now.s3.us-west-2.amazonaws.com/shared-sections/production/1961/872b3a76-9d7a-4018-a560-206573a26a35_Certification_Regarding_Prohibition_Against_Contracting_with_Scrutinized_Companies.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4N2RPQQAZ%2F20240424%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20240424T165159Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEcaCXVzLXdlc3QtMiJHMEUCIQCXFzepiBIhzCSHFIeJeo0xHmltSh3MD%2BY%2B%2B7RRWsATSAIgY4EazQWVH%2FN6txLBQyxhVuwcSVGMEKhL1HLFHq%2FmxwMqjAUIkP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDCRcoh65f7kEnMHj%2BSrgBDlUzG5rc2RD7bWEssjSfaKvd%2BmfiP%2Fme9NYAYd2%2FOa%2Ff6HUCkRDqjCE1ZeQuN4AmRqP%2FJfHUGqde7CNaLZ2iQnaExSvdbef81a%2Fiz366zHQ0mjibUKfb%2FA%2FDR48Nn8zl%2BDuP%2FejXhz9YgGrYGHWcNnRR4tqt959aFhEaHSE%2FhEqoEum0chE6CbDaSiFCXohgcrKhiJq%2FpFJzNW%2FT6pzVZOkl2hl5%2FTGYOnhFyGNtJOes5IcO7ab8wY3Ahw9UnS6R7AeB8pV7jGgYFukn8I%2FgpqbGK1HxGwhxQT1sQh1ybjDxqh86xVvNaVUBE%2BEXvE4yZZG0vMajPhzI2CCU803y14UULXQzHfqiMRPVdJVrMH2J7FmlI7EhvJ0QxKBQA7ZeiMScoSrxRLSDCi4ZZC%2BvVskAJsrP5n6tLsZwnib4axm7IFAIkZZNtjWySAoIhHM98G9G5vodYjWHZs7jFTk53lu%2BTYWFK8WpWV8yQU%2FuVzXwsQMKOTeBQhjnqYh7UmLhe2mvVXyaaIz%2BTl%2BnaW1IKJ42y7lZxZIoG8IO6botoaCD7s0f%2F9aqtZyqEs5u5K%2BMvZv3AChqWgdhEpJlt5pNU9TdZe3lCW57C18RfPkxrsUddDNUBgaiGd7hbQGs6YykwGged2%2FmiWvmFnBRp5KVLPLd9N8JbWTJ1HvOsDs8iSTrJtC9rKbbksohmWeIfMvfWA184qyfeDrez9m2QgRt5FmZVSJqGmKB1dXLH6tAayV2Kwtx%2F%2FoyjK8I1zqUVFrzdm5DMYESUfpZsFZi80352Tk26JTEw%2FLzyeMMbzQJjjnMLG7pLEGOpsBOGfd93SBEaQsbL02YMqZR4Mi4o%2FBsoKLHtsHKK%2FIVluK2tKVkClv0ijEROiKbXRJaeJMIvX3EfwjOr%2BE2hzMrT%2FIIs1lDZs37nAWljJ%2BwYMATx4l4lba9JoeOL6MqhHeYufe809FjQBylDHsdwYvu3w7waaypHbWmHNJk7sCx%2BYsES%2FH3CaBi%2BOepz5dBWxq388z65UdHyFhZGA%3D&X-Amz-Signature=543f8ff29a52e8a39acc4fb62f7ffe98761bc8d716abc846687ac718421ae93f&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Prohibition_Against_Contracting_with_Scrutinized_Companies.docx%22&x-id=GetObject https://procure-now.s3.us-west-2.amazonaws.com/shared-sections/production/1961/4a69f545-9266-40f4-a66d-372439fc0420_E-Verify_%281%29.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4N2RPQQAZ%2F20240424%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20240424T165159Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEcaCXVzLXdlc3QtMiJHMEUCIQCXFzepiBIhzCSHFIeJeo0xHmltSh3MD%2BY%2B%2B7RRWsATSAIgY4EazQWVH%2FN6txLBQyxhVuwcSVGMEKhL1HLFHq%2FmxwMqjAUIkP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDCRcoh65f7kEnMHj%2BSrgBDlUzG5rc2RD7bWEssjSfaKvd%2BmfiP%2Fme9NYAYd2%2FOa%2Ff6HUCkRDqjCE1ZeQuN4AmRqP%2FJfHUGqde7CNaLZ2iQnaExSvdbef81a%2Fiz366zHQ0mjibUKfb%2FA%2FDR48Nn8zl%2BDuP%2FejXhz9YgGrYGHWcNnRR4tqt959aFhEaHSE%2FhEqoEum0chE6CbDaSiFCXohgcrKhiJq%2FpFJzNW%2FT6pzVZOkl2hl5%2FTGYOnhFyGNtJOes5IcO7ab8wY3Ahw9UnS6R7AeB8pV7jGgYFukn8I%2FgpqbGK1HxGwhxQT1sQh1ybjDxqh86xVvNaVUBE%2BEXvE4yZZG0vMajPhzI2CCU803y14UULXQzHfqiMRPVdJVrMH2J7FmlI7EhvJ0QxKBQA7ZeiMScoSrxRLSDCi4ZZC%2BvVskAJsrP5n6tLsZwnib4axm7IFAIkZZNtjWySAoIhHM98G9G5vodYjWHZs7jFTk53lu%2BTYWFK8WpWV8yQU%2FuVzXwsQMKOTeBQhjnqYh7UmLhe2mvVXyaaIz%2BTl%2BnaW1IKJ42y7lZxZIoG8IO6botoaCD7s0f%2F9aqtZyqEs5u5K%2BMvZv3AChqWgdhEpJlt5pNU9TdZe3lCW57C18RfPkxrsUddDNUBgaiGd7hbQGs6YykwGged2%2FmiWvmFnBRp5KVLPLd9N8JbWTJ1HvOsDs8iSTrJtC9rKbbksohmWeIfMvfWA184qyfeDrez9m2QgRt5FmZVSJqGmKB1dXLH6tAayV2Kwtx%2F%2FoyjK8I1zqUVFrzdm5DMYESUfpZsFZi80352Tk26JTEw%2FLzyeMMbzQJjjnMLG7pLEGOpsBOGfd93SBEaQsbL02YMqZR4Mi4o%2FBsoKLHtsHKK%2FIVluK2tKVkClv0ijEROiKbXRJaeJMIvX3EfwjOr%2BE2hzMrT%2FIIs1lDZs37nAWljJ%2BwYMATx4l4lba9JoeOL6MqhHeYufe809FjQBylDHsdwYvu3w7waaypHbWmHNJk7sCx%2BYsES%2FH3CaBi%2BOepz5dBWxq388z65UdHyFhZGA%3D&X-Amz-Signature=d5b5e05bef66336339d7b3d24ba9d00d3e6497ba90aac859ec25403763355106&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22E-Verify_%281%29.docx%22&x-id=GetObject https://procure-now.s3.us-west-2.amazonaws.com/shared-sections/production/1961/be248ebc-ecf1-4173-aae5-c42761f751b8_Conflict_of_Interest_Disclosure_Form.docx?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4N2RPQQAZ%2F20240424%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20240424T165159Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEEcaCXVzLXdlc3QtMiJHMEUCIQCXFzepiBIhzCSHFIeJeo0xHmltSh3MD%2BY%2B%2B7RRWsATSAIgY4EazQWVH%2FN6txLBQyxhVuwcSVGMEKhL1HLFHq%2FmxwMqjAUIkP%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FARACGgw4OTIzNjQ2ODc2NzIiDCRcoh65f7kEnMHj%2BSrgBDlUzG5rc2RD7bWEssjSfaKvd%2BmfiP%2Fme9NYAYd2%2FOa%2Ff6HUCkRDqjCE1ZeQuN4AmRqP%2FJfHUGqde7CNaLZ2iQnaExSvdbef81a%2Fiz366zHQ0mjibUKfb%2FA%2FDR48Nn8zl%2BDuP%2FejXhz9YgGrYGHWcNnRR4tqt959aFhEaHSE%2FhEqoEum0chE6CbDaSiFCXohgcrKhiJq%2FpFJzNW%2FT6pzVZOkl2hl5%2FTGYOnhFyGNtJOes5IcO7ab8wY3Ahw9UnS6R7AeB8pV7jGgYFukn8I%2FgpqbGK1HxGwhxQT1sQh1ybjDxqh86xVvNaVUBE%2BEXvE4yZZG0vMajPhzI2CCU803y14UULXQzHfqiMRPVdJVrMH2J7FmlI7EhvJ0QxKBQA7ZeiMScoSrxRLSDCi4ZZC%2BvVskAJsrP5n6tLsZwnib4axm7IFAIkZZNtjWySAoIhHM98G9G5vodYjWHZs7jFTk53lu%2BTYWFK8WpWV8yQU%2FuVzXwsQMKOTeBQhjnqYh7UmLhe2mvVXyaaIz%2BTl%2BnaW1IKJ42y7lZxZIoG8IO6botoaCD7s0f%2F9aqtZyqEs5u5K%2BMvZv3AChqWgdhEpJlt5pNU9TdZe3lCW57C18RfPkxrsUddDNUBgaiGd7hbQGs6YykwGged2%2FmiWvmFnBRp5KVLPLd9N8JbWTJ1HvOsDs8iSTrJtC9rKbbksohmWeIfMvfWA184qyfeDrez9m2QgRt5FmZVSJqGmKB1dXLH6tAayV2Kwtx%2F%2FoyjK8I1zqUVFrzdm5DMYESUfpZsFZi80352Tk26JTEw%2FLzyeMMbzQJjjnMLG7pLEGOpsBOGfd93SBEaQsbL02YMqZR4Mi4o%2FBsoKLHtsHKK%2FIVluK2tKVkClv0ijEROiKbXRJaeJMIvX3EfwjOr%2BE2hzMrT%2FIIs1lDZs37nAWljJ%2BwYMATx4l4lba9JoeOL6MqhHeYufe809FjQBylDHsdwYvu3w7waaypHbWmHNJk7sCx%2BYsES%2FH3CaBi%2BOepz5dBWxq388z65UdHyFhZGA%3D&X-Amz-Signature=c9536f60ed3ea2312fe4198cd847295ac55d59603e4e666f22844e5a9d09e0a3&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Conflict_of_Interest_Disclosure_Form.docx%22&x-id=GetObject https://www.irs.gov/FormW9
3. Pricing Tables
REPAIR, REFURBISHMENTS AND REFRESH HOLIDAY DECORATIONS - YEAR ONE
Line Item Description Quantity Unit of Measure
Unit Cost Total
1 52’ Tall Tree, w/drum base 1 Each
2 40’ Tall Tree, w/platform and fence 1 Each
3 25’ Tall Tree, w/lighted base 4 Each
4 9 ½’ Tall Tree 1 Each
5 7 ½’ Tall Tree 1 Each
6 60” Decorated Wreaths* 15 Each
7 48” Lighted Wreaths* 40 Each
8 36” Wreaths* 60 Each
9 Wall Trees* 30 Each
10 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
11 Centerpiece 75 Each
12 Escalator Display - TBD 4 Each
13 Garland Displays 15 Each
14 Airplane Display 1 Each
15 Large Light Bulbs Display 1 Each
16 Ornament Photo Op Display 1 Each
TOTAL
SET-UP AND TAKE DOWN OF HOLIDAY DECORATIONS - YEAR ONE
Line Item Description Quantity Unit of Measure
Unit Cost Total
17 52’ Tall Tree, w/drum base 1 Each
18 40’ Tall Tree, w/platform and fence 1 Each
19 25’ Tall Tree, w/lighted base 4 Each
20 9 ½’ Tall Tree 1 Each
21 7 ½’ Tall Tree 1 Each
22 60” Decorated Wreaths* 15 Each
23 48” Lighted Wreaths* 40 Each
24 36” Wreaths* 60 Each
25 Wall Trees* 30 Each
26 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
27 Centerpiece 75 Each
28 Escalator Display - TBD 4 Each
29 Holiday Décor Rental 1 Each
30 Contractors % Mark-Up (enter % using decimal place. Example 10% = .1)
75,000 Each
31 Garland Displays 15 Each
32 Airplane Display 1 Each
33 Ornament Photo Op Display 1 Each
34 Various Holiday Decorations 100 Hourly
35 Decorating Services 100 Hourly
SERVICES - YEAR ONE
Measure
Unit Cost Total
36 Skilled Labor 500 Hourly
37 Unskilled Labor 500 Hourly
38 Install/Removal of Holiday Décor Rentals, Supervisor
68 Hourly
39 Install/Removal of Holiday Décor Rentals, Installers
250 Hourly
40 Equipment Rental, Bucket Lift 2 Monthly
41 Equipment Rental, Scissor Lift 2 Monthly
42 Equipment Rental, Forklift 2 Monthly
REPAIR, REFURBISHMENTS AND REFRESH HOLIDAY DECORATIONS - YEAR TWO
Measure
Unit Cost Total
43 52’ Tall Tree, w/drum base 1 Each
44 40’ Tall Tree, w/platform and fence 1 Each
45 25’ Tall Tree, w/lighted base 4 Each
46 9 ½’ Tall Tree 1 Each
47 7 ½’ Tall Tree 1 Each
48 60” Decorated Wreaths* 15 Each
49 48” Lighted Wreaths* 40 Each
50 36” Wreaths* 60 Each
51 Wall Trees* 30 Each
52 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
Measure
Unit Cost Total
53 Centerpiece 75 Each
54 Escalator Display - TBD 4 Each
55 Garland Displays 15 Each
56 Airplane Display 1 Each
57 Large Light Bulbs Display 1 Each
58 Ornament Photo Op Display 1 Each
SET-UP AND TAKE DOWN OF HOLIDAY DECORATIONS - YEAR TWO
Measure
Unit Cost Total
59 52’ Tall Tree, w/drum base 1 Each
60 40’ Tall Tree, w/platform and fence 1 Each
61 25’ Tall Tree, w/lighted base 4 Each
62 9 ½’ Tall Tree 1 Each
63 7 ½’ Tall Tree 1 Each
64 60” Decorated Wreaths* 15 Each
65 48” Lighted Wreaths* 40 Each
66 36” Wreaths* 60 Each
67 Wall Trees* 30 Each
68 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
69 Centerpiece 75 Each
70 Escalator Display - TBD 4 Each
Measure
Unit Cost Total
71 Holiday Décor Rental 1 Each
72 Contractors % Mark-Up (enter % using decimal place. Example 10% = .1)
75,000 Each
73 Garland Displays 15 Each
74 Airplane Display 1 Each
75 Ornament Photo Op Display 1 Each
76 Various Holiday Decorations 100 Hourly
77 Decorating Services 100 Hourly
SERVICES - YEAR TWO
Measure
Unit Cost Total
78 Skilled Labor 500 Hourly
79 Unskilled Labor 500 Hourly
80 Install/Removal of Holiday Décor Rentals, Supervisor
68 Hourly
81 Install/Removal of Holiday Décor Rentals, Installers
250 Hourly
82 Equipment Rental, Bucket Lift 2 Monthly
83 Equipment Rental, Scissor Lift 2 Monthly
84 Equipment Rental, Forklift 2 Monthly
REPAIR, REFURBISHMENTS AND REFRESH HOLIDAY DECORATIONS - YEAR THREE
Measure
Unit Cost Total
85 52’ Tall Tree, w/drum base 1 Each
86 40’ Tall Tree, w/platform and fence 1 Each
87 25’ Tall Tree, w/lighted base 4 Each
88 9 ½’ Tall Tree 1 Each
89 7 ½’ Tall Tree 1 Each
90 60” Decorated Wreaths* 15 Each
91 48” Lighted Wreaths* 40 Each
92 36” Wreaths* 60 Each
93 Wall Trees* 30 Each
94 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
95 Centerpiece 75 Each
96 Escalator Display - TBD 4 Each
97 Garland Displays 15 Each
98 Airplane Display 1 Each
99 Large Light Bulbs Display 1 Each
100 Ornament Photo Op Display 1 Each
SET-UP AND TAKE DOWN OF HOLIDAY DECORATIONS - YEAR THREE
Measure
Unit Cost Total
101 52’ Tall Tree, w/drum base 1 Each
102 40’ Tall Tree, w/platform and fence 1 Each
Measure
Unit Cost Total
103 25’ Tall Tree, w/lighted base 4 Each
104 9 ½’ Tall Tree 1 Each
105 7 ½’ Tall Tree 1 Each
106 60” Decorated Wreaths* 15 Each
107 48” Lighted Wreaths* 40 Each
108 36” Wreaths* 60 Each
109 Wall Trees* 30 Each
110 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
111 Centerpiece 75 Each
112 Escalator Display - TBD 4 Each
113 Holiday Décor Rental 1 Each
114 Contractors % Mark-Up (enter % using decimal place. Example 10% = .1)
75,000 Each
115 Garland Displays 15 Each
116 Airplane Display 1 Each
117 Ornament Photo Op Display 1 Each
118 Various Holiday Decorations 100 Hourly
119 Decorating Services 100 Hourly
SERVICES - YEAR THREE
Measure
Unit Cost Total
120 Skilled Labor 500 Hourly
121 Unskilled Labor 500 Hourly
122 Install/Removal of Holiday Décor Rentals, Supervisor
68 Hourly
123 Install/Removal of Holiday Décor Rentals, Installers
250 Hourly
124 Equipment Rental, Bucket Lift 2 Monthly
125 Equipment Rental, Scissor Lift 2 Monthly
126 Equipment Rental, Forklift 2 Monthly
REPAIR, REFURBISHMENTS AND REFRESH HOLIDAY DECORATIONS - YEAR FOUR
Measure
Unit Cost Total
127 52’ Tall Tree, w/drum base 1 Each
128 40’ Tall Tree, w/platform and fence 1 Each
129 25’ Tall Tree, w/lighted base 4 Each
130 9 ½’ Tall Tree 1 Each
131 7 ½’ Tall Tree 1 Each
132 60” Decorated Wreaths* 15 Each
133 48” Lighted Wreaths* 40 Each
134 36” Wreaths* 60 Each
135 Wall Trees* 30 Each
136 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
Measure
Unit Cost Total
137 Centerpiece 75 Each
138 Escalator Display - TBD 4 Each
139 Garland Displays 15 Each
140 Airplane Display 1 Each
141 Large Light Bulbs Display 1 Each
142 Ornament Photo Op Display 1 Each
SET-UP AND TAKE DOWN OF HOLIDAY DECORATIONS - YEAR FOUR
Measure
Unit Cost Total
143 52’ Tall Tree, w/drum base 1 Each
144 40’ Tall Tree, w/platform and fence 1 Each
145 25’ Tall Tree, w/lighted base 4 Each
146 9 ½’ Tall Tree 1 Each
147 7 ½’ Tall Tree 1 Each
148 60” Decorated Wreaths* 15 Each
149 48” Lighted Wreaths* 40 Each
150 36” Wreaths* 60 Each
151 Wall Trees* 30 Each
152 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
153 Centerpiece 75 Each
154 Escalator Display - TBD 4 Each
Measure
Unit Cost Total
155 Holiday Décor Rental 1 Each
156 Contractors % Mark-Up (enter % using decimal place. Example 10% = .1)
75,000 Each
157 Garland Displays 15 Each
158 Airplane Display 1 Each
159 Ornament Photo Op Display 1 Each
160 Various Holiday Decorations 100 Hourly
161 Decorating Services 100 Hourly
SERVICES - YEAR FOUR
Measure
Unit Cost Total
162 Skilled Labor 500 Hourly
163 Unskilled Labor 500 Hourly
164 Install/Removal of Holiday Décor Rentals, Supervisor
68 Hourly
165 Install/Removal of Holiday Décor Rentals, Installers
250 Hourly
166 Equipment Rental, Bucket Lift 2 Monthly
167 Equipment Rental, Scissor Lift 2 Monthly
168 Equipment Rental, Forklift 2 Monthly
REPAIR, REFURBISHMENTS AND REFRESH HOLIDAY DECORATIONS - YEAR FIVE
Measure
Unit Cost Total
169 52’ Tall Tree, w/drum base 1 Each
170 40’ Tall Tree, w/platform and fence 1 Each
171 25’ Tall Tree, w/lighted base 4 Each
172 9 ½’ Tall Tree 1 Each
173 7 ½’ Tall Tree 1 Each
174 60” Decorated Wreaths* 15 Each
175 48” Lighted Wreaths* 40 Each
176 36” Wreaths* 60 Each
177 Wall Trees* 30 Each
178 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
179 Centerpiece 75 Each
180 Escalator Display - TBD 4 Each
181 Garland Displays 15 Each
182 Airplane Display 1 Each
183 Large Light Bulbs Display 1 Each
184 Ornament Photo Op Display 1 Each
SET-UP AND TAKE DOWN OF HOLIDAY DECORATIONS - YEAR FIVE
Measure
Unit Cost Total
185 52’ Tall Tree, w/drum base 1 Each
186 40’ Tall Tree, w/platform and fence 1 Each
Measure
Unit Cost Total
187 25’ Tall Tree, w/lighted base 4 Each
188 9 ½’ Tall Tree 1 Each
189 7 ½’ Tall Tree 1 Each
190 60” Decorated Wreaths* 15 Each
191 48” Lighted Wreaths* 40 Each
192 36” Wreaths* 60 Each
193 Wall Trees* 30 Each
194 Decorated Office Trees (range 6 ½” to 9” tall)*
5 Each
195 Centerpiece 75 Each
196 Escalator Display - TBD 4 Each
197 Holiday Décor Rental 1 Each
198 Contractors % Mark-Up (enter % using decimal place. Example 10% = .1)
75,000 Each
199 Garland Displays 15 Each
200 Airplane Display 1 Each
201 Ornament Photo Op Display 1 Each
202 Various Holiday Decorations 100 Hourly
203 Decorating Services 100 Hourly
SERVICES - YEAR FIVE
Measure
Unit Cost Total
204 Skilled Labor 500 Hourly
205 Unskilled Labor 500 Hourly
206 Install/Removal of Holiday Décor Rentals, Supervisor
68 Hourly
207 Install/Removal of Holiday Décor Rentals, Installers
250 Hourly
208 Equipment Rental, Bucket Lift 2 Monthly
209 Equipment Rental, Scissor Lift 2 Monthly
210 Equipment Rental, Forklift 2 Monthly
File details come from the government source that posted it. Updated .