PDF 18 MB Posted
- Attached to
- DK-AO Heart Butte Safety of Dams Modification
- Solicitation number
- DOIRFBO240024
About this file
This document appears to be a set of 60% design drawings for the Heart Butte Safety of Dams Modification project, which is a pre-solicitation notification from the Department of the Interior Bureau of Reclamation. The estimated magnitude of this effort is between $35,000,000 and $55,000,000. The attachments include the 60% conceptual option for jet grouting block, the 60% design drawings, and a list of questions for contractors at the upcoming Heart Butte Dam Industry Day event. Interested parties are instructed to contact the Contracting Officer, Mitchell Frost, at mfrost@usbr.gov for any questions or comments regarding this notification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00 21
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
LOCATION AND VICINITY
MAP
DENVER, CO
203-D-60002
2024-09-05
1Au to
CA
D
R el
. 2 4.
2s
HE
AR
T
BU
TT
E_
_L O
CA
TI
O N&
VI
CI
NI
TY
.D W
G
SE
PT
EM
BE
R 5, 9:
JW
EE
M S
0 400'200'
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
Rivers and Creeks
State Highway
Interstate Highway
U.S. Highway
City
Capital City
Williston
Dickinson
Mandan Bismarck Jamestown Valley City
Minot
Devils Lake
Grafton
Grand Forks
Fargo West Fargo
Wahpeton
Elgin Carson
Mott
Glen Ullin
HebronRichardton
New Salem
Flasher
N or th D ak ot a
M in ne so taN or th D ak ot a
M on ta na
North Dakota South Dakota
Heart Butte Dam
Lake Tschida
Heart Butte Dam
Roads
P
P P
P P
P P
P
P
P
E
E
0+
2+
4+
6+
8+
.5
0+00
2+00
4+00
6+00
8+00
10+00
12+00
14+00
16+00
18+00
20+00
21+21.80
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
EXISTING CONDITIONS
PLAN
DENVER, CO
203-D-60003
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_E
XI
ST
IN
G C
O
ND
IT
IO
NS
.D
W G
SE
PT
EM
BE
R
, 2
8:
JW
EE
M S
Heart River and Reservoir
Road - paved Road - gravel/dirt Fence - 7 ft.
Fence - 8 ft.
Fence - woven Fence - wire
Riprap area
Survey control point Benchmark
LEGEND
Power - overhead E Power - buried P Phone - buried
Spillway Inlet
Hoist House
ND Highway 49
Bullhead Lane
ND Highway 49
Reclamation Maintenance Shop
Overhead Transmission Lines
Utility pole Guy wire & anchor
Spillway crest El. 2,064.60
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
PLAN
0 300'150'
Sidewalk
Guardrail
Guardrail
Hydraulic Piezometer Vault
Culvert
Culvert
Culvert
Culvert
Dam ℄
Spillway and Outlet Works ℄
NOTES
1. Survey control points and benchmarks are shown for reference. For additional information, see sheet 203-600-60003.
2. ND Highway 49 Easement is approximate and shown for reference.
3. Existing toe drain location is approximate and shown for reference.
4. Coordinates are local project and units are U.S. survey feet (USSF).
5. Horizontal Reference Frame is North Dakota State Plane, South Zone, NAD83 (2011), (Epoch 2010). Projection: North Dakota South Zone NAD83 (3302 ND S). Projection Type: Lambert Two.
6. Vertical Reference Frame is Heart Butte Dam Local based on Pt. No. 101, El. 2,121.542-USSF. Local Ellipsoid: GRS 1980. Geoid Model: GEOID12B.
NAVD88 Elevation: 2,123.109-USSF. Vertical reference frame shift:
NAVD88 equals Heart Butte Local Vertical Reference Frame plus 1.567-feet (GEOID12B).
7. Basis of Bearings is Grid North, North Dakota South Zone, State Plane Coordinate System (3302 ND S), NAD 83.
8. Project Coordinates used in this drawing are local and the units are U.S.
Survey Feet (one U.S. Survey Foot = 12/39.37 meters). To transform the Local Project Ground Plane Coordinates to North Dakota South Zone State Plane Coordinates (NDSSPC) in meters, add 300,000 feet to the Northings and add 1,000,000 feet to the Eastings; divide the resulting coordinates by the Ground Scale Factor of 1.000153 then multiply by 12/39.37 for NDSPCS in meters.
ND Highway 49 Easement Boundary (Note 2)
Easement Boundary
Weir 1
Weir 2 Weir 3
Weir 4
Toe Drain (Note 3)
Existing toe drain
N41393.37 E639520.53 El.2121.542
BM VERT1
N43173.14
E639310.81 El.2167.57
REF MARK
N AXIS OF DAM
N41054.19 E639420.84 El.2126.89
REF MARK
S AXIS 0+00
N43081.05
E639174.44 El.2169.85
BM VERT2
N41445.57 E639518.37 El.2119.78
BM REF1
N41049.05
E639320.95 El.2126.40
BM 100
N41383.40 E639833.64 El.2130.56
NO. 5 REBAR W/ YPC
N42892.47 E639576.33 El.2128.55
NO. 5 REBAR W/ YPC
N41381.47
E639143.98 El.2118.69
REF MARK
N41496.13
E639200.44 El.2095.37
REF MARK
N41633.17 E639659.53 El.2025.00
BM USBR
P
P P
P P
P P
P
P
P
E
E
2027.97
BM 380.5RT
902070
2140 2130
SURVEY CONTROL POINT TABLE - LOCAL PROJECT GROUND COORDINATES
REFERENCED TO NAD 83 (2011)(EPOCH:2010.0000) AND GEOID12B
POINT
NO.
POINT NAME
BM VERT1
CP N AXIS OF DAM
CP S AXIS 0+00
BM VERT2
BM REF1
BM 100
BM 380.5RT
BM HB-S3
CP NO5 REBAR YPC
CP NO5 REBAR YPC
CP NAIL IN CONCRETE POST
CP NAIL IN CONCRETE POST
LOCAL PROJECT
NORTHING (USSF)
41,393.37
43,173.14
41,054.19
43,081.05
41,445.57
41,049.05
42,024.13
42,147.83
41,383.40
42,892.47
41,381.47
41,496.13
LOCAL PROJECT
EASTING (USSF)
639,520.53
639,310.81
639,420.84
639,174.44
639,518.37
639,320.95
639,751.43
640,549.40
639,833.64
639,576.33
639,143.98
639,200.44
LOCAL PROJECT
ELEVATION (USSF)
2,121.542
2,167.57
2,126.89
2,169.85
2,119.78
2,126.40
2,027.97
2,026.20
2,130.56
2,128.55
2,118.69
2,095.37
LATITUDE (NORTH)
N46°35'42.46518"
N46°35'59.9945"
N46°35'39.1016"
N46°35'59.06324"
N46°35'42.9800"
N46°35'39.0344"
N46°35'48.7280"
N46°35'50.0797"
N46°35'42.4183"
N46°35'57.2684"
N46°35'42.2858"
N46°35'43.4266"
LONGITUDE (WEST)
W101°48'34.88783"
W101°48'38.3153"
W101°48'36.2339"
W101°48'40.24570"
W101°48'34.9312"
W101°48'37.6627"
W101°48'31.7326"
W101°48'20.3379"
W101°48'30.4028"
W101°48'34.4467"
W101°48'40.2757"
W101°48'39.4947"
NDSPCS NORTHING
(METERS)
104,040.988
104,583.380
103,937.623
104,555.315
104,056.897
103,936.056
104,233.217
104,270.914
104,037.950
104,497.846
104,037.363
104,072.305
NDSPCS EASTING
(METERS)
499,650.409
499,586.496
499,620.030
499,544.939
499,649.752
499,589.589
499,720.779
499,963.963
499,745.833
499,667.416
499,535.655
499,552.863
53 BM USBR HEADWALL 2021 41,633.17 639,659.53 2,025.00 N46°35'44.8546" W101°48'32.9551" 104,114.068 499,692.770
PRIMARY SURVEY CONTROL
SECONDARY SURVEY CONTROL DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
Robertson, Ronald A
Walsh, Christie S
Hardes, Charles
Robertson, Ronald A
Skinner, Norris D (Dave) Technical Services Supervisor
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
TO
PO
G
RA
PH
Y
AN
D
S
UR
VE
Y
CO
NT
RO
L
TOPOGRAPHY AND
SURVEY CONTROL
BILLINGS, MT
203-600-60003
2021-07-26
1Au to
CA
D
R el
. 2 3.
1s
3-
0-
3-
RD
-1 .D
W G
JU
NE
2, 5:
CW
AL
SH
0 300'150'
E
P
-1
0-
R ob er ts on
R on al d
A
O R
IG
IN
A L
S U
R
FA
C E
R
EV
IS
ED
R el ea se d
N41393.37 E639520.53 El.2121.542
BM VERT1
N43173.14
E639310.81 El.2167.57
REF MARK
N AXIS OF DAM
N41054.19
E639420.84 El.2126.89
REF MARK
S AXIS 0+00
N43081.05
E639174.44 El.2169.85
BM VERT2
N41445.57
E639518.37 El.2119.78
BM REF1
N41049.05
E639320.95 El.2126.40
BM 100
N42147.83 E640549.40 El.2026.20
BM HB-S3
N41383.40 E639833.64 El.2130.56
NO. 5 REBAR W/ YPC
N42892.47
E639576.33 El.2128.55
NO. 5 REBAR W/ YPC
N41381.47
E639143.98 El.2118.69
REF MARK
N41496.13
E639200.44 El.2095.37
REF MARK
N. 44,000
E.
,0
Haul route from Borrow area
N41633.17
E639659.53 El.2025.00
BM USBR
N. 44,000
E.
,0
N. 41,500
E.
,0
Borrow area, stockpile and waste area
Stockpile, staging, and Contractor use area, see note 4
Main access road
TP-18-03
TP-18-02TP-18-01
TP-23-11
TP-23-12
TP-23-13
TP-23-14
TP-23-15
Stockpile, staging, and Contractor use areas, see note 4
Existing trees to be protected (typ)
Stockpile, staging, and Contractor use area, see note 4
N42024.13
E639751.43 El.2027.97
BM 380.5RT
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
CONTRACTOR USE AND
BORROW AREAS
PLAN
DENVER, CO
203-D-60004
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_C O
NT
RA
CT
O
R-
US
E&
BO
RR
O
W .D
W G
SE
PT
EM
BE
R 5, 9:
JW
EE
M S
0 500'250'
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
State Highway
Heart Butte Dam
PLAN
NOTES
1. Contour interval at 10 feet.
2. Property and easement boundaries are approximate and shown for reference.
3. Survey control points and benchmarks are shown for reference. For additional information, see sheet 203-600-60003.
4. Approximate location of contractor use area and stockpile area, as approved by COR.
Borrow, stockpile, or waste area
Stockpile, staging, or Contractor use area
Survey control point
Benchmark
Property and Easement Boundaries
U.S. Government
N D
H w y
U .S
. G ov er nm en t
N D
H w y
U .S
G ov er nm en t
U.S. Government Swift, Virgil & Margaret Skjoldal, David & Tina
Skjoldal, David & Tina
Skjoldal, David & Tina
U.S. Government
U.S. Government
U.S. Government
Road - paved
Road - gravel/dirt
Borrow area test pit
1.
2%
5+00 6+00
7+00 8+00
9+00
1.
5:
1.
5:
1.5:1
4.
0:
4.0:1
4.0:1
4.
0:
4.0:1 H or iz on ta l
2.
5:
2.
5:
8.0'
1.
5:
1.
5:
1.
5:
1.
5:
1.5:1
1.5:1
Tr an si tio n sl op e
.5
4.
0:
4.0:1
1.
5:
1.
5:
12.
5:
Tr an si tio n sl op e
10+00
11+00
12+00
13+00
14+00
14+49.50
1.
5:
1.
5:
1.5:1
2.
5:
2.
5:
1.5:1
1.5:1
Tr an si tio n sl op e
.5
60.0'
45°
5.0'
10.0'
1.
5:
1.
5:
12.
5:
Tr an si tio n sl op e
12+00
13+00
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
EXCAVATION
PLAN
DENVER, CO
203-D-60008
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_E
XC
AV
AT
IO
N.
D W
G
SE
PT
EM
BE
R
, 2
9:
JW
EE
M S
ND Highway 49
0 60'30'
PLAN
A 60009
A 60009
Vertical filter trench excavation limits
(note 6)
B 60010
B 60010
C 60010
C 60010
El. 2002
El. 2002
D 60011
D 60011
E 60011
E 60011
El. 2004
Exposed existing conduit (see sheet 203-D-60019)
0 20' 40'10'
PLAN
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
Exposed existing conduit
El. 2002
Exposed jet grout cutoff wall
Exposed jet grout cutoff wall (see sheet 203-D-60019)
NOTES
1. Buried utilities not shown, see drawing 203-D-60003.
2. All dimensions and elevations to be verified in the field.
3. Existing toe drain location is approximate and shown for reference.
4. Existing toe drain daylights into excavation at approximately El. 2012 near the location shown.
Remove toe drain segment within excavation area and connect existing pipe to drainage system as shown on sheet 203-D-60017.
5. Remove fishing platform and ramp and reconstruct as shown on sheet 203-D-600##.
6. Filter trench shoring to be Contractor designed.
7. The Contractor shall maintain all excavations in the dry. See specifications.
8. The final excavation surface to be determined in the field by the COR.
El. 2010
Hydraulic piezometer vault
Hydraulic piezometer vault
LEGEND
Existing Conduit
Jet Grout Cutoff Wall
Heart River
Roadway
Existing Toe Drain
Spillway and Outlet Works Conduit
El. 1995
1.5:1
1.5:1
El. 2025
El. 2010
El. 2025
Toe drain (note 3)
Approximate location where existing toe drain daylights to excavation (note 4)
Approximate location where existing toe drain daylights to excavation (note 4)
Spillway stilling basin excavation shown on sheet 203-D-60012
Fishing platform (note 5)
Spillway and Outlet Works ℄
Spillway and Outlet Works ℄
El. 1977
El. 2002.6
EL
EV
A
TI
O N
STATION
ALIGNMENT - HBD SPILLWAY AND OUTLET WORKS PROFILE
9+50 10+00 11+00 12+00 13+00
Top of headwall Sta. 12+49.50 El. 2024.74
Invert Sta. 12+49.50 El. 2002.74
Existing ground
Excavation surface 1.5:1Existing conduit, cut off collars not shown
Sta. 12+47.50 El. 2020.00
Sta. 11+95.80 El. 2020.00
Spillway chute
Zone 1
Zone 2
Tb (sandstone)
Tb (shale)
El. 2062.9
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
EXCAVATION
PROFILE
DENVER, CO
203-D-60009
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_E
XC
AV
AT
IO
N.
D W
G
SE
PT
EM
BE
R
, 2
9:
JW
EE
M S
0 20' 40'10'
PROFILE
60008
A
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. The Contractor shall maintain all excavations in the dry. See specifications.
2. The final excavation surface to be determined in the field by the COR.
A
TI
O N
STATION
0+00 1+00 2+00 2+70
El. 2057.1
El. 2002.0
El. 1977.0
El. 2002.0
El. 2010.0
Existing ground
Excavation surface
1.5:1
Vertical filter trench excavation surface, excavation shoring not shown (note 2)
2.5:1
14.0'
Zone 2
Qal Qal
Fill
Tb (sandstone)
Tb (shale)
Tb (sandstone)
El. 2010.0
15.0' 1.5:1
EL
EV
A
TI
O N
STATION
0+00 1+00 1+50
Existing spillway chute wall El. 2017.0
El. 1977.0
El. 2002.0
El. 2030.1
Existing ground
Excavation surface 1.5:1
Vertical filter trench excavation surface, excavation shoring not shown
10.0'
Zone 2
Qal
Tb (shale)
Tb (sandstone)
Tb (sandstone)
El. 2001.0 9.0'
3.0' thick existing concrete footing
1.5:1
15.0'
El. 2010.0
2.5:1
Qal
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
EXCAVATION
SECTIONS (1 OF 2)
DENVER, CO
203-D-60010
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_E
XC
AV
AT
IO
N.
D W
G
SE
PT
EM
BE
R
, 2
9:
JW
EE
M S
0 10' 20'
SECTION
60008
B
0 10' 20'
SECTION
60008
C
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. Spillway chute wall and footing dimensions and elevations approximate.
2. Filter trench shoring to be Contractor designed.
3. The Contractor shall maintain all excavations in the dry. See specifications.
4. The final excavation surface to be determined in the
A
TI
O N
STATION
SECTION F PROFILE
0+00 1+00 2+00 2+75
El. 2022.1
El. 2004.0 El. 2002.0
Excavation surface 4:1
1.2%
Tb (sandstone)
Qal
Qal
8.0' El. 1995.0
1.5 :11.5:1
4:1
El. 2010.0
15.0' El. 2002.6
EL
EV
A
TI
O N
STATION
0+00 1+00 2+00 2+70
Excavation surface 4:1
El. 2022.0
El. 2003.5 El. 2003.5
El. 2010.0
4:1
Existing spillway chute wall El. 2017.0
Tb (sandstone)
Qal Fill
El. 1988.1
3.0' thick existing concrete footing
4.5'
4:1 El. 2010.0
15.0'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
EXCAVATION
SECTIONS (2 OF 2)
DENVER, CO
203-D-60011
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_E
XC
AV
AT
IO
N.
D W
G
SE
PT
EM
BE
R
, 2
1:
JW
EE
M S
0 10' 20'
SECTION
60008
D
0 10' 20'
SECTION
60008
E
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. Spillway chute wall and footing dimensions and elevations approximate.
2. The Contractor shall maintain all excavations in the dry. See specifications.
3. The final excavation surface to be determined in the
10.0'
1.
5:
1.5:1
1.5:11.5:1
1.5 :1
6.0'1.
5:
14+49.50
14+00
1.5:1
N
,4
E. 639,750
N
,5
E. 639,850
N
,4
E. 639,850
2005 20
1995 2000 20
10 2015
Existing ground surface
El. 1990.01.5:1
El. 2009.9
Jet grout cutoff wall, El. 2020.0
El. 1977.0
Excavation surface
1.5:1
Excavation surface
44.6'
Soil reinforcement (contractor designed)
6.0'
EL
EV
A
TI
O N
STATION
0+00 1+00 1+85.01
El. 1983.5 El. 1983.5
Tb (sandstone)
Tb (shale)
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
SPILLWAY STILLING BASIN
EXCAVATION
PLAN AND SECTION
DENVER, CO
203-D-60012
2024-09-05
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_S
TI
LL
IN
G -B
AS
IN
-E
XC
AV
AT
IO
N.
D W
G
SE
PT
EM
BE
R
, 2
1:
JW
EE
M S
0 20' 40'10'
PLAN
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
Jet grout cutoff wall (see sheet 203-D-60019)
F 60012
F 60012
LEGEND
Jet Grout Cutoff Wall
Soil Reinforcement Zone
Wire Fence
NOTES
1. Remove fishing platform and ramp and reconstruct as shown on 203-D-600##.
2. The Contractor shall maintain all excavations in the dry. See specifications.
3. The final excavation surface to be determined in the field by the COR.
Soil reinforcement zone (contractor designed)
0 10' 20'
SECTION
60012
F
El. 1983.5
Excavation left of spillway shown on 203-D-60008
Fishing platform (note 1)
Spillway and Outlet Works ℄
AutoCAD SHX Text Heart River
N
,9
E. 639,500
N
,4
E. 639,500
N
,4
E. 639,900
20.0'
10+00
11+00
12+00
13+00
14+00
14+49.50
1.
0%
2.25:1
2.5:1
2.2:1 5.
0:
.0
:1
4.
0%
2.
5:
4.0:1
4.0:1
2.
5:
.0
23.0'
104°
13+00
4.
0%
2.
5:
135°
5.0' 20.0'
10.0'
.0
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED SEEPAGE BERM
GENERAL
PLAN
DENVER, CO
203-D-60013
2024-09-09
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_F
IN
IS
HE
D .D
W G
SE
PT
EM
BE
R
, 2
3:
JW
EE
M S
0 60'30'
PLAN
A 60014
A 60014
B 60014
B 60014
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
D 60015
D 60015
C 60015
C 60015
El. 2010.0
℄ Access road, El. 2010.0
E 60016
E 60016
El. 2035.0
El. 2033.5
LEGEND
MSE Wall
Wire Fence
Gate
Heart River
Roadway
Spillway and Outlet Works Conduit
Hydraulic piezometer vault
F 60016
F 60016
NOTES
1. Drainage feature (i.e., riprap channel, filter drain) will be included in design to direct overland flows from left groin around seepage berm and into Heart River.
2. Gate installed to restrict public vehicle access.
3. Inspection wells and drain pipes not shown (see
203-D-60017 and 203-D-60018).
El. 2035.0
MSE wall, El. 2036.0
MSE wall, El. 2036.0
MSE wall, El. 2036.0
MSE wall, El. 2036.0
0 20' 40'10'
PLAN
MSE wall, begin slope down to El. 2010.0
(5.0:1)
El. 2033.5
El. 2017.0
El. 2024.0
Left groin drainage (note 1)
Parking area
Gate (note 2)
Spillway and Outlet Works ℄
Spillway and Outlet Works ℄
MSE wall, begin slope down to El. 2010.0
(5.0:1)
El. 2015.0
El. 2010.0
A
TI
O N
STATION
0+00 1+00 2+00 3+00 4+00 4+30
3.0' 20.0'
2.0' El. 2035.0 El. 2033.5El. 2031.0
Access road, El. 2010.0
Limit of excavation
Filter sand
Compacted backfill
12-inch dia. perforated HDPE drain pipe, see drawing 203-D-60017
8.0' El. 1995.0
1.0%
5.0:1
15.0' El. 2010.0
Filter sand
1.5 :11.5:1
Tb (sandstone)
Qal Qal
0.5' thick gravel surfacing
Riprap
Riprap bedding
Rockfill
6.5'
EL
EV
A
TI
O N
STATION
SECTION G PROFILE
0+00 1+00 2+00 2+79.66
3.0'
2.0' El. 2027.5
El. 2012.6 (varies)
El. 2027.5
MSE wall, El. 2028.5 (varies)
Existing spillway chute wall El. 2017.0
El. 2010.0
Limit of excavation
Filter sand
Compacted backfill
12-inch dia. perforated HDPE drain pipe, see drawing 203-D-60017
3.0' thick existing concrete footing
4.5' El. 1988.1
6.0'
15.0'El. 2010.0
Tb (sandstone)
Qal Qal
Tb (shale)
Fill
Rockfill
0.5' thick gravel surfacing
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED SEEPAGE BERM
GENERAL
SECTIONS (1 OF 3)
DENVER, CO
203-D-60014
2024-09-09
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_F
IN
IS
HE
D .D
W G
SE
PT
EM
BE
R
, 2
2:
JW
EE
M S
0 20' 40'10'
SECTION
60013
A
0 20' 40'10'
SECTION
60013
B
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
LEGEND
Filter Sand
Compacted Backfill
Rockfill
Riprap
Riprap Bedding
Reinforced Backfill Zone
NOTES
1. Spillway chute wall and footing dimensions and elevations approximate.
A
TI
O N
STATION
0+00 1+00 2+00 2+70
4.0'5.0'
El. 2057.1
El. 2034.5
MSE wall, El. 2036.0
El. 2012.5
El. 1977.0
El. 2010.0
1.0%
Limit of excavation Compacted backfill
1.5:1
1.5:1
3.0'
15.0'
El. 2040.0
El. 2035.0
2.0' min
2.5:1
Tb (sandstone)
Tb (shale)
Fill
Zone 2
Qal
Tb (sandstone)
Tb (shale)
4.0%
2.5:1
Drain gravel Filter sand
3.0'El. 2010.0
1.5'
Limit of spillway stilling basin excavation (see sheet 203-D-60012)
Filter sand
Riprap
Riprap bedding
2.5:1 El. 2017.0 El. 2015.0
10.0%
Limit of excavation
0.5' thick gravel surfacing
EL
EV
A
TI
O N
STATION
0+00 1+00 1+55
4.0'
5.0'
1.5'
3.0'
3.0'
El. 2035.0 El. 2034.2 MSE wall, El. 2034.5
Existing spillway chute wall, El. 2017.0
El. 2031.0
El. 1977.0
El. 2010.0
Limit of excavation
Filter sand
Compacted backfill
Drain gravel
12-inch dia. perforated HDPE drain pipe
1.5:1
Horizontal
El. 2001.0
9.0'
1.5:1
15.0'
3.0'
Tb (sandstone)
Tb (shale)
Qal
Zone 2
2.5:1
El. 2012.5
3.0' thick existing concrete footing
Compacted backfill
0.5' thick gravel surfacing
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED SEEPAGE BERM
GENERAL
SECTIONS (2 OF 3)
DENVER, CO
203-D-60015
2024-09-09
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_F
IN
IS
HE
D .D
W G
SE
PT
EM
BE
R
, 2
5:
JW
EE
M S
0 10' 20'
SECTION
60013
C
0 10' 20'
SECTION
60013
D
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
LEGEND
Filter Sand
Drain Gravel
Riprap
Riprap Bedding
Compacted Backfill
Reinforced Backfill Zone
NOTES
1. Spillway chute wall and footing dimensions and elevations approximate.
A
TI
O N
STATION
0+00 0+50
Existing spillway chute wall, El. 2017.0
MSE wall, El. 2034.5
12-inch dia. perforated HDPE drain pipe (El. 2007.5)
El. 2034.0
El. 2012.5
4.0' 5.0' 3.0'
Limit of excavation 3.0' thick existing concrete footing
9.0'
El. 2001.0
Tb (sandstone)
1.5'
Drain gravel Compacted backfill
0.5' thick gravel surfacing
Filter sand
EL
EV
A
TI
O N
STATION
0+00 1+00 1+60
MSE wall, El. 2036.0El. 2034.51.0%
Limit of excavation
Jet grout cutoff wall (see sheet 203-D-60019)
El. 1977.0
Compacted backfill
El. 2035.0
El. 2032.0
1.5:1
El. 2067.8
2.25:1
Tb (shale)
Existing conduit (beyond)
Tb (sandstone)
Zone 2
1.9:1
El. 2022.0
El. 2024.0
12-inch dia. perforated HDPE drain pipe
Sand filter and gravel drain envelope (see sheet 203-D-60023)
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED SEEPAGE BERM
GENERAL
SECTIONS (3 OF 3)
DENVER, CO
203-D-60016
2024-09-09
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_F
IN
IS
HE
D .D
W G
SE
PT
EM
BE
R
, 2
3:
JW
EE
M S
0 5' 10'
SECTION
60013
E
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
LEGEND
Filter Sand
Drain Gravel
Compacted Backfill
Jet Grout Cutoff Wall
Reinforced Backfill Zone
NOTES
1. Spillway chute wall and footing dimensions and elevations approximate.
SECTION
60013
F 0 10' 20'
N
,9
E. 639,500
N
,4
E. 639,500
N
,4
E. 639,900
4.0:1
4.0:1
1.
2%
4.0:1
4.0:1 4.
0:
2.
5:
1.
5:
1.5:1
38.0'
41.2'
38.0'
41.2'
38.0'
38.0'
35.0'
12-inch dia. perforated HDPE drain pipe (pipe invert El. 2012.0), see Note 1.
Add pipe clean out to end of pipe (detail 5 sheet 203-D-60018).
12-inch dia. perforated HDPE drain pipe (pipe invert El. 2007.5).
Add pipe clean out to end of pipe (detail 5 sheet 203-D-60018).
12-inch dia. perforated HDPE drain pipe (pipe invert El. 2010.0), see Note 1.
Add pipe clean out to end of pipe (detail 5 sheet 203-D-60018).
Pipe invert El. 2007.0
.5
4.0:1
2.
5:
4.0:1
1.
5:
1.
5:
1.
5:
2020 20 30 2040
1.
5:
4.
0:
H or iz on ta l
Connect 12-inch dia. solid HDPE pipe to existing 12-inch concrete toe drain outfall pipe (El. 2012.0)
Existing 12-inch concrete open joint toe drain (below excavation)
1.
5:
1.
5:
Tr an si tio n sl op e
2.
5:
Pipe invert El. 2005.0
12-inch dia. perforated HDPE drain pipe (pipe invert El. 2010.0), see Note 1.
Add pipe clean out to end of pipe (detail 5 sheet 203-D-60018).
Pipe invert El. 2003.0
Pipe invert El. 2007.0
10+00
11+00
12+00
13+00
14+00
14+49.50
12-inch dia. perforated HDPE drain pipe (see sheet 203-D-60020)
22.5° pipe bend
10.0'
10.0'
Fl ow
Flow
45°
Pipe tee
12-inch dia. perforated HDPE drain pipe
12-inch dia. perforated HDPE drain pipe
Compacted backfill
Filter sand
1:
1:1
1:1 1:
El. varies, see drawing 203-D-60008
Excavation surface
2.0'
5.5'
5.5'
3.0'3.0'
1.5'
12-inch dia. perforated HDPE drain pipe
1.5' 1.5'
1.0'
1.0'
Drain gravel
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
DRAIN PIPE SYSTEM
PLAN AND DETAILS
DENVER, CO
203-D-60017
2024-09-10
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_D
RA
IN
S
YS
TE
M .D
W G
SE
PT
EM
BE
R
, 2
2:
JW
EE
M S
0 60'30'
PLAN
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. Drain pipe invert elevation to follow excavation surface plus 1.5-feet, see drawing 203-D-60008. For typical drain pipe section, see Detail 1.
0 4'2'
DETAIL - TYPICAL DRAIN PIPE SECTION
0 10'5'
DETAIL - TYPICAL PIPE CONNECTION
El. 2002
El. 2002
El. 2004
Exposed existing conduit
Exposed jet grout cutoff wall
El. 2010
Vertical filter trench excavation limits
LEGEND
Existing Conduit
Jet Grout
Filter Sand
Drain Gravel
Compacted Backfill
Heart River
Roadway
Wire Fence
Drain Pipe
Drain Pipe (Existing)
Drain pipe not shown, (see 203-D-60020)
El. 2010
1.5:1
1.5:1
El. 1995
El. 2025
Hydraulic piezometer vault
60018
60018
60018
5' -0 se e no te
12-inch V-notch weir plate (see Detail 6)
12-inch non-perforated HDPE pipe
12-inch non-perforated HDPE pipe
Fl ow
℄ Weir Box (location varies, see sheet 203-D-60017)
℄ Pipe
Sediment collection weir box
Cover and lock not shown
12-inch flap gate
Sealant not shown (see notes 3 and 4)
6-in stilling well (typ) built into fiberglass
H-Flume
1.0-foot fiberglass H-flume with built in 3.0 foot approach and 12-inch stub connection to inlet (note 2)
8-foot I.D. reinforced precast concrete
Fiberglass staff gage (typ) (note 1)
Sediment catch basin for sediment transport monitoring
Edge of concrete slab
12-foot by 12-foot reinforced cast-in-place base slab (see sheet 203-D-600##)
12-inch non-perforated
HDPE pipe
2'-6"x3'-0" Floor access hatch (above) (see specifications)
℄ Inspection Well N 41,774.98 E 639,890.36
Fl ow
Fl ow
℄ Pipe and slab
Fl ow
5'-0" see note 1
18-inch non-perforated
HDPE pipe
1.0'
2.0'
0.5' 18-inch standard galvanized steel pipe.
Block with wood shims to center around pipe.
Backfill annulus with filter sand.
Cover for 18-inch standard galvanized steel pipe
(see sheet 203-D-600##)
12-inch non-perforated HDPE pipe
Pipe elbows as needed (note 6)
Finished ground
El. Varies
Cleanout daylight (see sheet 203-D-600##)
End HDPE pipe
Compacted backfill
Filter sand
Drain gravel
Perforated pipe (note 7)
End filter sand and drain gravel one foot above perforated pipe
1' -0
1' -6
Flow
El. 2003.5
El. 2003.0
El. 2011.0
8-foot I.D. reinforced precast concrete
6"
Ladder and landing platform not shown (see sheet 203-D-600##)
Hatch cover not shown
Reinforced precast concrete cover, joints not shown
12-foot by 12-foot reinforced cast-in-place base slab (see sheet 203-D-600##)
Sealant not shown (see notes 3 and 4)
Flow
El. 2000.5
5'-0" see note 5
Start 12-inch perforated HDPE pipe
Sealant not shown (see notes 3 and 4)
Extend filter sand and drain gravel 2 feet beyond perforated pipe
Controlled Low Strength Material
(CLSM)
CLSM
El. 2010.0
1' -6
Stub connection to inlet
1.0-foot fiberglass H-flume (note 2)
1'-6"
4' -0
Riser section (typ)
Filter sand
Drain gravel
Install 18-inch flap gate on end of 18-inch non-perforated HDPE pipe
6" 2'-0" 6"
1' -0
2' -6
3"
6"
3" 3" 10"10"
3'-0"
45°
90°
8" Ø hole for 8" Ø adhesive anchor with 3 12" min.
embedment (typ., 12 REQD.)
4" stainless steel plate
℄ of weir box
3"
INSPECTION WELL
60017
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
INSPECTION WELL AND
OUTFALL
DETAILS AND SECTION
DENVER, CO
203-D-60018
2024-09-10
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_D
RA
IN
S
YS
TE
M .D
W G
SE
PT
EM
BE
R
, 2
3:
JW
EE
M S
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. Fiberglass staff gage built flush into inside of flume from manufacturer.
2. Flumes to be set in concrete or set on concrete slab and anchored in place.
3. Sealants, joints, and waterstops not shown, see sheet 203-D-60###.
4. Connection of inspection well to inlet and outlet pipes shall be completed in accordance with ASTM C923.
5. Extend non-perforated pipe 5.0 feet beyond limits of weir box.
6. Maximum toe drain pipe bend shall not exceed 22.5 degrees and a minimum of 5 feet long straight section will be placed between each bend when multiple bends are required.
7. Refer to sheet 203-D-600## for location and elevation of cleanouts.
0 4'2'0 4'2'
A 60018
0 4'2'
LEGEND
Filter Sand
Drain Gravel
Compacted Backfill
V-NOTCH WEIR PLATE DETAIL
0 4'2'
TYPICAL WEIR BOX
60017
4 TYPICAL CLEANOUT DETAIL
60017
NOT TO SCALE
A
SECTION
A
20.0'
N
,9
E. 639,500 N
,4
E. 639,500 N
,4
E. 639,900
14+49.50
10+00
11+00
12+00
13+00
14+00
30.0'
5.0'
5.0'
47.2'
5.0'
42.0'
5.0'
5.0'
4.5'
12+00
13+00
7.0'
38.2'
20.0'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
CUTOFF WALL AND
CONDUIT REPAIR
PLAN
DENVER, CO
203-D-60019
2024-09-10
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_G
RO
UT
-W
AL
L&
CO
ND
UI
T-
RE
PA
IR
.D
W G
SE
PT
EM
BE
R
, 2
5:
JW
EE
M S
0 60'30'
PLAN
Jet grout block beneath existing concrete conduit
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io nJet grout cutoff wall
Jet grout cutoff wall Vertical filter trench excavation limits
Hydraulic piezometer vault
LEGEND
Jet Grout Cutoff Wall
Jet Grout Block
Conduit Repair Zone
Filter Sand
Soil Reinforcement Zone
Roadway
Wire Fence
0 10' 20'
PLAN
Jet grout block beneath existing concrete conduit
Jet grout cutoff wall
NOTES
1. Refer to sheet 203-D-60036 for concrete conduit demolition and repair information.
Conduit joint segment
Limits of conduit repair (note 1)
Soil reinforcement zone (contractor designed)
Spillway stilling basin excavation shown on sheet 203-D-60012
Excavation left of spillway shown on 203-D-60008
20.0'
,9
E. 639,500 N
,4
E. 639,500 N
,4
E. 639,900
5.0'
14+49.50
10+00
11+00
12+00
13+00
14+00
210020
20302030
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED CUTOFF WALL
PLAN
DENVER, CO
203-D-60020
2024-09-11
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_G
RO
UT
W
AL
L_
FI
NI
SH
ED
.D W
G
SE
PT
EM
BE
R
, 2
1:
JW
EE
M S
0 60'30'
PLAN
Jet grout block beneath existing concrete conduit
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
E 60023
E 60023
F 60023
Jet grout cutoff wall
Jet grout cutoff wall
12-inch dia. perforated HDPE drain pipe (see sheet 203-D-60023)
F 60023
G 60023
G 60023
Vertical filter trench excavation limits
Hydraulic piezometer vault
LEGEND
Jet Grout Cutoff Wall
Jet Grout Block
Filter Sand
MSE Wall
Soil Reinforcement Zone
Roadway
Wire Fence
Jet grout cutoff wall
12-inch dia. solid HDPE drain pipe (see sheet 203-D-60018)
Soil reinforcement zone (contractor designed)
A 60021
A 60021
B 60021
B 60021
C 60022
C 60022
Finished seepage berm shown on sheet 203-D-60013
D 60022
D 60022
Mechanically stabilized earth wall shown on sheet 203-D-60013
12-inch dia. perforated HDPE drain pipe.
Add pipe clean out to end of pipe.
NOTES
1. Clean out and inspection locations along drain pipes not shown.
60018
A
TI
O N
STATION
SECTION J (2) PROFILE
0+00 0+85
Excavation surface
CLSM work platform, to be removed after jet grouting is completed
Jet grout block beneath existing conduit
Jet grout cutoff wall
Jet grout cutoff wall
Existing ground surface
Existing exterior concrete conduit
Compacted backfill
Finished grade
30.0'
Filter sand
1:
Tb (sandstone)
Tb (shale)
5.0'5.0'
3.0'
El. 1977.0
El. 2000.0
El. 2018.0
El. 2022.0El. 2020.0 (note 1)
El. 2032.0
Dental concreteDrain gravel
12-inch dia.
perforated HDPE drain pipe
12-inch dia.
perforated HDPE drain pipe
EL
EV
A
TI
O N
STATION
0+00 0+95
Tb (sandstone)
Tb (shale)
Excavation surface
Existing ground surface
Jet grout cutoff wall
30.0'
Dental concrete
20.0'
3.0'
Drain gravel
Jet grout cutoff wall
1:
Existing exterior concrete conduit
Finished grade Compacted backfill
El. 1977.0 El. 1977.0
El. 2002.0 (note 1)
El. 2022.0El. 2024.0
El. 2018.0
Filter sand
Note 2
El. 2012.5
12-inch dia.
perforated HDPE drain pipe (El. 2007.5)
12-inch dia.
perforated HDPE drain pipe
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED CUTOFF WALL
SECTIONS (1 OF 3)
DENVER, CO
203-D-60021
2024-09-11
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_G
RO
UT
W
AL
L_
FI
NI
SH
ED
.D W
G
SE
PT
EM
BE
R
, 2
1:
JW
EE
M S
0 10' 20'
SECTION
60020
A
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
LEGEND
Jet Grout Cutoff Wall
Jet Grout Block
Filter Sand
Drain Gravel
Dental Concrete
Compacted Backfill
NOTES
1. Top elevation of jet grout cutoff wall varies along left side of conduit. See section D on sheet 203-D-60022.
2. Prepare interface between jet grout cutoff wall and vertical filter trench according to specifications.
0 10' 20'
SECTION
60020
B
A
TI
O N
STATION
ALIGNMENT - HBD SPILLWAY AND OUTLET WORKS PROFILE
10+50 11+00 12+00 12+80
Excavation surface
Existing conduit, cut off collars not shown
Spillway chute
Zone 1
Zone 2
Tb (sandstone)
Tb (shale)
1.5:1
2.25:1
Existing ground
Compacted backfill
Filter sand
Jet grout cutoff walls (projected and beyond) Jet grout block beneath existing conduit
El. 2035.0El. 2034.5 MSE wall, El. 2036.0
El. 2024.0
El. 2022.0
El. 2040.0
Compacted backfill
EL
EV
A
TI
O N
STATION
SECTION J (1) PROFILE
0+00 1+00 1+40
1.5:1
2.5:1
4.0%
1.5:1
5.0'
4.0'
1.5'
Drain gravel
Left jet grout cutoff wall (projected)
12-inch dia. perforated HDPE drain pipe.
Add pipe clean out to end of pipe.
Limit of excavation
2.25:1
Tb (sandstone)
Tb (shale)
Zone 2
1.0%
El. 2058.6
El. 2040.0
El. 2012.5
El. 2034.5 MSE wall, El. 2036.0
El. 2002.0
El. 1977.0
El. 2020.0
El. 2035.0
El. 2024.0
Note 1
Compacted backfill
El. 2010.0
Install perforated end cap on drain pipe
Filter sand
Left jet grout cutoff wall
El. 2017.0
0.5' thick gravel surfacing
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED CUTOFF WALL
SECTIONS (2 OF 3)
DENVER, CO
203-D-60022
2024-09-11
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_G
RO
UT
W
AL
L_
FI
NI
SH
ED
.D W
G
SE
PT
EM
BE
R
, 2
3:
JW
EE
M S
0 20' 40'10'
SECTION
60020
C
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
LEGEND
Jet Grout Cutoff Wall
Jet Grout Block
Filter Sand
Drain Gravel
Compacted Backfill
Reinforced Backfill Zone
0 10' 20'
SECTION
60020
D
NOTES
1. Top elevation of left jet grout cutoff wall is stepped to generally follow limit of excavation.
A
TI
O N
STATION
0+00 1+00 1+20
El. 2017.5
10.0'
Excavation surface Riprap
Filter sand 1.5:1
1.5:1
3.0'
2.0'
1.5'
1.5:1
Riprap bedding
Existing ground surface
Tb (sandstone)
Tb (shale)
Fill
Fill
Compacted backfill
EL
EV
A
TI
O N
STATION
0+00 0+65
Existing spillway chute wall, El. 2017.0
Jet grout cutoff wall, El. 2020.0
El. 1977.0
5.0'
Varies
13.0'
3.0' thick existing concrete footing
El. 1990.0
Soil reinforcement (contractor designed)
Tb (sandstone)
Tb (shale)
Fill
EL
EV
A
TI
O N
STATION
0+00 1+00 1+70
El. 1983.5
El. 1990.0
El. 2010.0
Jet grout cutoff wall, El. 2020.0
El. 1983.5
El. 1977.0
Excavation surface
Riprap
Riprap bedding
Filter sand
Riprap
Filter sand
1.5:1
Riprap bedding
3.0' min.
1.5'
2.0'
3.0' min.
1.5:1
2.0'
1.5'
Existing ground surface
Existing ground surface
Soil reinforcement (contractor designed)
5.0'
Tb (sandstone)
Tb (shale)
Compacted backfill
0.5' thick gravel surfacing
Compacted backfill
Excavation surface
Filter sand Drain gravel
Compacted backfill
12-inch dia. perforated HDPE drain pipe
Jet grout cutoff wall, El. 2020
1.0' min.
1.0'
1.0'
1.0'
1.0'
1.0'
1.0'
1.0' 1.0'
0.
5:
Finished ground, see Note 1
0 2' 4'
DETAIL
0 10' 20'
SECTION
60020
G
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
X
X
X
X
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
FINISHED CUTOFF WALL
SECTIONS AND DETAIL (3
OF 3)
DENVER, CO
203-D-60023
2024-09-11
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_G
RO
UT
W
AL
L_
FI
NI
SH
ED
.D W
G
SE
PT
EM
BE
R
, 2
3:
JW
EE
M S
0 10' 20'
SECTION
60020
E
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
0 10' 20'
SECTION
60020
F
NOTES
1. Backfill to match existing ground surface.
2. Spillway chute wall and footing dimensions and elevations approximate.
LEGEND
Filter Sand
Compacted Backfill
Drain Gravel
Riprap Bedding
Riprap
Jet Grout Cutoff Wall
Soil Reinforcement Zone
1.
5:
1.
5:
1.5:1
2.
5:
4.
0:
4.0:1
4.0:1
1.5:1
1.5:1
N
,9
E. 639,500
N
,5
E. 639,500
N
,5
E. 639,900
OW-6
OW-5
OW-3
OW-7
OW-4
OW-8
OW-2
OW-1
OW-9
1.
5:
1.
5:
1.5:1
2.
5:
12+00
13+00
OW-5
OW-3
OW-4
OW-1
OW-9
Vari es
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Nicole Bogenschuetz
Nicole Bogenschuetz
Kevin Cashman
Ted Howard
Justin Hall
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
DEWATERING
PLAN
DENVER, CO
203-D-60030
2024-09-25
1 OF 4Au to
CA
D
R el
. 2
0s
T
BU
TT
E_
_D
EW
AT
ER
IN
G
.D W
G
SE
PT
EM
BE
R
, 2
5:
NB
O
G
EN
SC
HU
ET
Z
ND Highway 49
0 60'30'
PLAN
Vertical filter trench excavation limits
B 60031
B 60031
A 60031
A 60031
Dewatering platform, El. 2002
0 20' 40'10'
PLAN Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
El. 2002
Jet grout block
Jet grout block
Dewatering bench, El. 2010
NOTES
1. All slopes are Horizontal:Vertical.
2. All dimensions are in feet, unless otherwise shown.
3. For survey information see (60003).
4. Dewatering and observation wells are approximate and shall be relocated as approved by COR.
5. Refer to specifications for installation requirements of dewatering and observation wells.
6. Approved, Contractor-designed unwatering system not shown.
7. Access to existing observation wells and piezometers shall be made available, as approved by COR.
8. Phase 1 includes dewatering to support the installation of the jet grout block below the conduit. Phase 2 includes dewatering to support the installation of the toe and blanket drains. Five wells within Phase 1 will be operated as part of Phase 2.
9. The installation of the cofferdam and unwatering of the stilling basin must occur prior to operating the Phase 1 dewatering system.
10. This plan is for clarity of the dewatering system and should not be used to construct any other aspect of the project.
LEGEND
Jet Grout Cutoff Wall
Jet Grout Block
Vertical Filter Trench
Heart River
Roadway
Observation Well
Dewatering Well - Phase 2
Dewatering Well - Phase 1
Spillway stilling basin excavation not shown, see (60012)
Limit of excavation, see (60008)
Dewatering bench, El. 2010
Dewatering bench, El. 2010
Limit of excavation, see (60008)
Cofferdam not shown and will be contractor designed
Existing conduit
Jet grout cutoff wall
Existing stilling basin
Filter blanket key not shown, see (60008)
Hydraulic piezometer vault
Hydraulic piezometer vault
Va ri es
Va ri es
14.4%
2.
5:
1.
5:
1.
5:
Heart River
A
TI
O N
STATION
0+00 1+00 2+00 2+30
El. 2002
Existing ground
Excavation surface
Vertical filter trench excavation surface, excavation shoring not shown
2.5:1
14.0'
Zone 2
Qal Qal
Fill
Tb (sandstone)
Tb (shale)
Tb (sandstone)
Dewatering bench, El. 2010
Deep well, see Detail 1 (60032)
Deep well, projected 4 feet
Deep well, projected 2 feet
El. 2002
El. 2010
El. 1977
1.5:1
1.5:1
Observation well
Observation well, see Detail 2 (60032), projected 5 feet
EL
EV
A
TI
O N
STATION
0+00 1+00 1+10
Existing ground
1.5:1
Vertical filter trench excavation surface, excavation shoring not shown
10.0'
Zone 2
Qal
Tb (shale)
Tb (sandstone)
Qal Tb (sandstone)
Dewatering bench, El. 2010
Deep well, projected 9 feet
Deep well, projected 5 feet
Deep well, projected 7 feet
Excavation surface
Existing spillway chute wall El. 2017
El. 2002
El. 1977
1.5:1
El. 20019.0'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Nicole Bogenschuetz
Nicole Bogenschuetz
Kevin Cashman
Ted Howard
Justin Hall
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
DEWATERING
SECTIONS
DENVER, CO
203-D-60031
2024-09-25
2 OF 4Au to
CA
D
R el
. 2
T
BU
TT
E_
_D
EW
AT
ER
IN
G
.D W
G
SE
PT
EM
BE
R
, 2
5:
NB
O
G
EN
SC
HU
ET
Z
0 10' 20'
SECTION
60030
B
0 10' 20'
SECTION
60030
A
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
NOTES
1. For survey information, see (60003).
2. Cross section is for illustrative purposes only. Do not use for construction of any other feature beyond the dewatering system.
3. All wells shown are projected. Some wells were not projected for clarity.
4. Depths estimated, conditions may vary in the field. Changes acceptable as approved by COR.
5. Drill depths target ten feet into shale bedrock.
.0
' m in
Backfill with filter pack
Min. 2" annular space
6" Diameter
1.0' min.
10" min
Pipe cap
3.0' min
Bentonite pellets Depth to vary
Ground surface
V ar ie s
2.0' min.
V ar ie s
2.
0' m in
Ground surface
Depth to vary
Bentonite pellets
Backfill with filter pack
Min. 2" annular space
2" diameter
Pipe cap
.0
' m in
1.5' min
1.0' min.
6" min
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
Nicole Bogenschuetz
Nicole Bogenschuetz
Kevin Cashman
Ted Howard
Justin Hall
GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
DEWATERING
DETAILS AND TABLES
DENVER, CO
203-D-60032
2024-09-25
3 OF 4Au to
CA
D
R el
. 2
T
BU
TT
E_
_D
EW
AT
ER
IN
G
.D W
G
SE
PT
EM
BE
R
, 2
4:
NB
O
G
EN
SC
HU
ET
Z
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
DETAIL - DEEP WELL
1 NOT TO SCALE
DETAIL - OBSERVATION WELL
2 NOT TO SCALE
NOTES
1. For survey information, see (60003).
2. Depths estimated, conditions may vary in the field. Changes acceptable as approved by COR.
3. Deep well drill depths target ten feet into shale bedrock.
4. Phase 1 includes dewatering to support the installation of the jet grout block below the conduit. Phase 2 includes dewatering to support the installation of the toe and blanket drains. Five wells within Phase 1 will be operated as part of Phase 2.
Downstream face of headwall
Upstream face of headwall
Concrete conduit transition section
Existing concrete conduit
Jet grout cutoff walls
Jet grout cutoff walls, see Note 3
STA. 12+49.50
STA. 11+95.30
STA. 12+20.00STA. 12+15.50
CL. Heart Butte Outlet Works Conduit
Limits of repair area
STA. 12+12.30
2.00'
Existing concrete to be removed and replaced
STA. 12+49.50
Extents of hydrodemolition and concrete repair
Jet grout columns
CL. Jet grout drilled holes, STA.
12+03.80
Concrete conduit transition section
Extents of hydrodemolition and concrete repair
Extents of hydrodemolition and concrete repair
Extents of hydrodemolition and concrete repair
2" Sawcut
2" Sawcut
STA. 11+95.30
STA. 12+12.30
Conduit floor El. 2002.74
Existing concrete to remain
Longitudinal saw cut
Existing concrete to be removed and replaced
El. 2016.74
5'-0" Vertical min. above outside drill edge
Extents of hydrodemolition and concrete repair
Existing concrete to remain CL. Conduit
Jet grout columns
Existing concrete to be removed and replaced
R7.00'
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
MACGUIRE MALLORY
X
X
X X
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
CO
RR
EC
TI
VE
A
CT
IO
N
ST
UD
Y
CONCRETE CONDUIT
DEMOLITION AND REPAIR
PLAN, DETAIL, AND
PROFILE
DENVER, CO
203-D-60036 1 OF 2Au to
CA
D R el . 2
CO
ND
UI
T
JE
T
G
RO
UT
IN
G D
ES
IG
N
CO
NC
RE
TE
R
EP
AI
R
AR
EA
.D
W G
AP
RI
L
, 2
7:
M M
AL
LO
RY
SECTION
B
SECTION ALONG CENTERLINE OF CONCRETE CONDUIT
B
PLAN
0 5' 10'
0 5' 10'
0 5' 10'
GENERAL NOTES
1. All dimensions to be verified in field.
2. Hydro demolition to leave in place existing reinforcement for evaluation by field staff.
3. For jet grouting repair, see drawing XX-D-XXXX
4. Drilling platform to be placed and removed by contractor.
5. Temporary bracing to be designed, placed, and removed by contractor.
6. All concrete demolished should be replaced in kind after reinforcement repairs complete using 4,500psi.
B
B
AA
STA. 12+12.30
Extents of hydrodemolition and concrete repair
Conduit transition section
Extents of hydrodemolition and concrete repair
Existing splice location for outer hoop
18 of R8G8 @ 12"
STA. 11+95.30
Extents of hydrodemolition and concrete repair
Conduit floor
17'-0" R6N3, see Section B 203-D-60038
1'-0" (Typ.)
STA. 12+12.30STA. 11+95.30
4"
Extents of hydrodemolition and concrete repair
Conduit floor
Existing concrete to remain in place
R7.00' 0.25'
R8F28 (Possibly Square)
R10M7
R8G8 (Square)
Transition point from 10 to 8
Existing concrete to be removed
Existing concrete to remain in place
R7'-0"
1'-0" Typ.
1'-0" Typ.
4"
#9 (632-9) @ 12" O.C.
Middle of Splice from 10 to 8
R6N3 @ 12"
Concrete to be removed
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -
X
MACGUIRE MALLORY
X
X
X X
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
CO
RR
EC
TI
VE
A
CT
IO
N
ST
UD
Y
REINFORCEMENT
PROFILE AND SECTIONS
DENVER, CO
203-D-60037 2 OF 2Au to
CA
D R el . 2
CO
ND
UI
T
JE
T
G
RO
UT
IN
G D
ES
IG
N
CO
NC
RE
TE
R
EP
AI
R
AR
EA
.D
W G
AP
RI
L
, 2
7:
M M
AL
LO
RY
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
PROFILE - LONGITUDINAL REINFORCEMENT ONLY
PROFILE - TRANSVERSE (HOOP) REINFORCEMENT ONLY
0 3' 6'
0 3' 6'
NOTES
1. See 203-D-60036 for general notes.
2. Existing reinforcement to remain in place must be verified by field staff for quality.
3. Damaged reinforcement requiring replacement will be identified by the government. See DWG 40-D-60004 for splice length detailing.
REFERENCE DRAWINGS
203-D-43___________________EXISTING PLAN AND PROFILE
203-D-78___________________EXISTING REINFORCEMENT
SECTION - LONGITUDINAL REINFORCEMENT ONLY
D 0 3' 6'
SECTION - LONGITUDINAL REINFORCEMENT ONLY
C 0 3' 6'
C
C
D
D
3+
4+
5+
6+
7+
8+
9+
10+
11+
12+
13+
14+
15+
16+
17+
6+00
7+00
8+00
9+00
10+00
11+00
12+00
13+00
14+00
14+49.50
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
CONDUIT BACKFILL
GROUTING
PLAN
DENVER, CO
203-D-60045
2024-04-03
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_V O
ID
-F
IL
LI
NG
.D
W G
SE
PT
EM
BE
R
, 2
9:
JW
EE
M S
Heart River and Reservoir
LEGEND
Spillway inlet
Dam crest, El. 2124
Spillway crest El. 2,064.60
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
PLAN - CONDUIT BACKFILL GROUTING
0 100'50'
Finish backfill grouting at about conduit Station 6+60
Outlet works conduit centerline
Existing hoist house
Void grouting row (57 rows)Existing outlet works conduit (projected)
Start backfill grouting at about conduit Station 12+20
Conduit portal
Stilling basin
Stilling basin/conduit transition
A 60046
A 60046
B 60046
B 60046
NOTES
1. All dimensions are in feet, unless otherwise shown.
2. Backfill grouting rows are spaced at 10 ft and extend from about conduit Station 12+20 to about conduit Station 6+60.
3. Backfill grouting will begin at the downstream row and move upstream.
4. Pre-packed well screen drainage ports are spaced at about 30 ft along the length of the conduit.
Pre-packed well screen drainage port (detail 2 sheet 60045)
Void Grouting Row
Pre-packed Well Screen Drainage Port
AutoCAD SHX Text Lake Tschida
AutoCAD SHX Text River
Heart
25°
5.1'
Zone 1
Tb (sandstone)
25°
5.1'
Zone 1
Tb (sandstone)
Qal
1.0' - 2.0'
Tb (sandstone)
Tb (sandstone)
1.5' max
1.0'
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER -GEOTECHNICAL ENGINEER
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
PL
O
TT
ED
B Y
CA
D
F
IL
EN
AM
E
D
AT
E
AN
D T
IM
E
PL
O
TT
ED
CA
D
S
YS
TE
M
D
C
B
A
D
C
B
A
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N U.
S.
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
RI
O R
Managing
LAR M TA IOCE N
W in theWa estter
PI
CK
-S
LO
AN
M
IS
SO
UR
I
BA
SI
N
PR
O G
RA
M
HE
AR
T D
IV
IS
IO
N
HE
AR
T
BU
TT
E
D
AM
SA
FE
TY
O
F D
AM
S
M O
D
IF
IC
AT
IO
N
CONDUIT BACKFILL
GROUTING
SECTIONS AND DETAILS
DENVER, CO
203-D-60046
2024-04-03
1Au to
CA
D
R el
. 2
T
BU
TT
E_
_V O
ID
-F
IL
LI
NG
.D
W G
SE
PT
EM
BE
R
, 2
9:
JW
EE
M S
Fo r
In te rn al
U se
O nl y D ra ft
No t F or D is tr ib ut io n
Outlet works conduit
Grout hole (typ.), see Note 4
Grout hole (typ.), see Note 4
Outlet works conduit
NOTES
1. All dimensions are in feet, unless otherwise shown.
2. Drilling below conduit into foundation material and/or voids will not begin until dewatering has drawn the water down to the bottom elevation of the conduit (about El. 2000 or lower).
3. Holes through conduit will be cored with electric core drill. Hole drilled into foundation material/voids will be drilled with a 7/8-inch diameter bit.
4. Each grout row contains three grout holes. In each row, vertical grout holes at invert shall be grouted first, followed by the outer two holes which are 25° from vertical.
5. Ensure mechanical squeeze packer is fully contained within the drill hole.
6. Attach grout manifold to 2-inch full diameter ball valve.
7. After grouting at port is completed, close ball valve until grout has set. When grout has set, move ball valve, grout pipe, and mechanical packer to an upstream grout hole. Temporarily plug grouted holes with a sewer plug, then dry pack all grout holes with Portland cement and sand when grouting is completed.
8. All backfill grouting operations will be directed in the field by the Government on-site representative.
9. Drill 2-inch hole and install mechanical squeeze packer and ball valve prior to drilling 7/8-inch hole through remaining width of conduit. Upon removing 7/8-inch drill bit, immediately close ball valve. The ball valve shall not be opened until well screen is installed. See specifications for additional requirements.
GEOLOGIC UNITS LEGEND
Zone 1 - Embankment Material
Qal - Quaternary Alluvium
Tb (sandstone) - Bullion Creek Formation Sandstone
0 3' 6'
SECTION - CONDUIT BACKFILL GROUTING ROW
60045
A
0 1' 2'0 3' 6'
SECTION - CONDUIT BACKFILL GROUTING ROW
60045
B
LEGEND
Steel grout pipe
Drill hole into foundation
Approximate geologic contact
2-inch ball valve (fittings not shown), see Note 6 and Note 7
4-inch diameter hole drilled through conduit, see Note 3
Mechanical squeeze packer, see Note 5
2-inch diameter grout pipe
7/8-inch diameter hole drilled below conduit, see Note 2 and Note 3
DETAIL - TYPICAL GROUT PORT
DETAIL - GROUT MANIFOLD
3 NOT TO SCALE0 1' 2'
DETAIL - PRE-PACKED WELL SCREEN DRAINAGE PORT
1-inch ball valve (fittings not shown)
2-inch diameter hole drilled through conduit, see Note 3 1-inch…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .