Heart_Butte_60__Conceptual_Option_for_Jet_Grouting_Block_10_3_2024_2.pdf

PDF 1 MB Posted

Attached to
DK-AO Heart Butte Safety of Dams Modification
Solicitation number
DOIRFBO240024
Issued by

About this file

This document is a conceptual plan for the excavation beneath the conduit as part of the Heart Butte Safety of Dams Modification project. The plan outlines the use of jet grout cutoff walls adjacent to and below the conduit, along with partial excavation of a vertical filter trench to allow access to an untreated foundation window below the conduit. Backfilling of the excavation beneath the conduit with concrete is also specified. The document includes plan and section views detailing the proposed approach.

This conceptual plan is part of the 60% design documents for the DK-AO Heart Butte Safety of Dams Modification project, which has an estimated value between $35,000,000 and $55,000,000. The Department of the Interior, Bureau of Reclamation is the federal agency managing this pre-solicitation opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20.0'

N

,9

E. 639,500 N

,4

E. 639,500 N

,4

E. 639,900

14+49.50

10+00

11+00

12+00

13+00

14+00

2.0:1

30.0'

5.0'

4.5'

12+00

13+00

5.0'

2.0:1

2000 5.0'

5.0'5.0'

20.0'

8.0'

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

X

X

X

X

X

GEOTECHNICAL ENGINEER

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

PL

O

TT

ED

B Y

CA

D

F

IL

EN

AM

E

D

AT

E

AN

D T

IM

E

PL

O

TT

ED

CA

D

S

YS

TE

M

D

C

B

A

D

C

B

A

BU

RE

AU

O

F

RE

CL

AM

AT

IO

N U.

S.

D

EP

AR

TM

EN

T O

F

TH

E

IN

TE

RI

O R

PI

CK

-S

LO

AN

M

IS

SO

UR

I

BA

SI

N

PR

O G

RA

M

HE

AR

T D

IV

IS

IO

N

HE

AR

T

BU

TT

E

D

AM

SA

FE

TY

O

F D

AM

S

M O

D

IF

IC

AT

IO

N

EXCAVATION BENEATH

CONDUIT OPTION -

ALTERNATIVE CUTOFF

WALL

PLAN

DENVER, CO

203-D-#####

2024-09-10

1Au to

CA

D

R el

. 2 4.

2s

HE

AR

T

BU

TT

E_

_A

LT

-C O

NC

EP

T_ G

RO

UT

-W

AL

L-

PL

AN

.D

W G

SE

PT

EM

BE

R

, 2

3:

JW

EE

M S

0 60'30'

PLAN

Foundation treatment below conduit (notes 1 and 4)

Fo r

In te rn al

U se

O nl y D ra ft

No t F or D is tr ib ut io nJet grout cutoff wall

Jet grout cutoff wall

Vertical filter trench excavation limits

Hydraulic piezometer vault

LEGEND

Jet Grout Cutoff Wall

Foundation Treatment Below Conduit

Filter Sand

Soil Reinforcement Zone

Roadway

Wire Fence

0 10' 20'

PLAN

Jet grout cutoff walls (note 1)

Jet grout cutoff wall

NOTES

1. Install jet grout cutoff walls adjacent to and below the conduit using angled drilling as shown on Section A.

2. Excavate a portion of the vertical filter trench as shown to allow horizontal excavation through jet grout cutoff wall and into the untreated foundation window. Verify bottom of untreated foundation window below conduit by drilling confirmation borings into the foundation from within the conduit.

3. Support excavation using slide rail trench system, or similar.

4. Backfill excavation beneath conduit with concrete after removing untreated foundation window.

Conduit joint segment

Soil reinforcement zone (contractor designed)

Spillway stilling basin excavation shown on sheet 203-D-60012

Excavation left of spillway shown on 203-D-60008

El. 2000

~El. 1985

Partial excavation of vertical filter trench (notes 2 and 3)

Foundation treatment below conduit (notes 1 and 4)

Approximate extents of existing conduit

A

A

A

A

AutoCAD SHX Text Heart River

EL

EV

A

TI

O N

STATION

EXCAVATION BENEATH CONDUIT OPTION PROFILE

0+00 1+00 1+10

Jet grout cutoff wall

Angled jet grout zone beneath conduit (note 1)

Untreated foundation window (note 2)

Existing exterior concrete conduit

Existing ground surface

Excavation surface

Partial filter trench excavation for removal of untreated foundation window below conduit

2.0:1

Excavation surface

Tb (sandstone)

Tb (shale)

~El. 1985.0 (note 2)

El. 2000.0

El. 1977.0

El. 2025.0

El. 2022.0

EL

EV

A

TI

O N

STATION

EXCAVATION BENEATH CONDUIT OPTION PROFILE

0+00 1+00 1+10

Jet grout cutoff wall

Angled jet grout zone beneath conduit (note 1)

Concrete block (note 4)

Existing exterior concrete conduit

Existing ground surface

Excavation surface

Partial filter trench excavation for removal of untreated foundation window below conduit

2.0:1

Excavation surface

Tb (sandstone)

Tb (shale)

~El. 1985.0 (note 2)

El. 2000.0

El. 1977.0

El. 2022.0

El. 2025.0

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER -

X

X

X

X

X

GEOTECHNICAL ENGINEER

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

PL

O

TT

ED

B Y

CA

D

F

IL

EN

AM

E

D

AT

E

AN

D T

IM

E

PL

O

TT

ED

CA

D

S

YS

TE

M

D

C

B

A

D

C

B

A

BU

RE

AU

O

F

RE

CL

AM

AT

IO

N U.

S.

D

EP

AR

TM

EN

T O

F

TH

E

IN

TE

RI

O R

PI

CK

-S

LO

AN

M

IS

SO

UR

I

BA

SI

N

PR

O G

RA

M

HE

AR

T D

IV

IS

IO

N

HE

AR

T

BU

TT

E

D

AM

SA

FE

TY

O

F D

AM

S

M O

D

IF

IC

AT

IO

N

EXCAVATION BENEATH

CONDUIT OPTION -

ALTERNATIVE CUTOFF

WALL

SECTIONS

DENVER, CO

203-D-#####

2024-09-10

1Au to

CA

D

R el

. 2 4.

2s

HE

AR

T

BU

TT

E_

_A

LT

-C O

NC

EP

T_ G

RO

UT

-W

AL

L-

PL

AN

.D

W G

SE

PT

EM

BE

R

, 2

3:

JW

EE

M S

Fo r

In te rn al

U se

O nl y D ra ft

No t F or D is tr ib ut io n

LEGEND

Jet Grout Cutoff Wall

Concrete Block

NOTES

1. Jet grout zone beneath the conduit assumes angled jet grouting up to 30 degrees from vertical from both sides of the conduit.

2. Excavate a portion of the vertical filter trench as shown to allow horizontal excavation through jet grout cutoff wall and into the untreated foundation window. Verify bottom of untreated foundation window below conduit by drilling confirmation borings into the foundation from within the conduit.

3. Support excavation using slide rail trench system, or similar.

4. Backfill excavation beneath conduit with concrete after removing untreated foundation window.

5. Temporary support of the conduit will depend on Contractor's means and methods for excavation. Government will determine temporary support after Contractor submits plan for excavation beneath the conduit.

6. After completion of Alternative Cutoff Wall, build vertical filter trench to full depth at elevation 1977.

0 10' 20'

ANGLED JET GROUTING AND EXCAVATION SECTION

A 0 10' 20'

FINISHED CONCRETE BLOCK SECTION

A

Sheets and Views
Excavation Plan

File details come from the government source that posted it. Updated .