Amendment 0002

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 1

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

P0002 2019 JUN 21

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

COMMANDER, NAVY INSTALLATIONS COMMAND

NAF ACQUISITIONS BRANCH N945

716 SICARD ST. SE BLDG 111 STE 1000

WASHINGTON, DC 20374

POC: CONTRACTING OFFICER, 202-433-9158

CHRISTOPHER.SAUNDERS@NAVY.MIL

SAME AS BLOCK 6

8. NAME AND ADDRESS OF CONTRACTOR No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.

HDQMWR-19-R-0032

9B. DATED (SEE ITEM 11)

2019 JUN 18

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers JULY 12, 2019 is extended, is not ext-.ended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO

BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF

OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATAT (If Required)

NONAPPROPRIATED FUNDS $

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF CNIC 7043.1.

X

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

CNICINST 7043.1, NAF PROCUREMENT POLICY

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 (ONE) copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This purpose of this Amendment is to extend the due date to July 12, 2019, revise Section C and provide answers to RFP questions. As a result, this solicitation is modified as follows:

1. The proposal due date is hereby extended to July 12, 2019

2. Section C is hereby revised: See schedule below.

3. Amendment 0001 shall be removed and replaced as an Amendment for this solicitation

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

CHRISTOPHER SAUNDERS

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY 19 MARCH 2019

(Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

HDQMWR-19-R-0003

SECTION C

SPECIFICATIONS/DESCRIPTIONS

C.1 OBJECTIVE:

The objective of this Request for Proposal (RFP) is to consolidate the purchasing of fitness equipment for the Navy Fitness Centers and Deployed Forces Support warehouses located in both CONUS and OCONUS. OCONUS locations may include, but are not limited to Korea, Japan, Europe, Diego Garcia, Singapore, Guam and Bahrain. These locations will include, but are not limited to, seventy-four (74) worldwide installations, thirteen (13) worldwide ports, and 250 ships.

NAFI will have a flexible and cost effective means to obtain fitness equipment quickly and efficiently by issuing a Delivery Order specific to its needs. The procurement is designed to provide NAFI with a wide variety of contractor(s) with expertise in the fitness industry and worldwide logistical support.

C.2 GENERAL REQUIREMENTS:

C.2.1 The Contractor shall provide the specified number of pieces of fitness equipment as set forth in each Delivery Order. The Contractor shall be used for shipping, a delivery location will be provided on each delivery order(s). CONUS shipments shall be received within 90 days.

Equipment going to OCONUS locations must include the shipping company, POC, and order number within 90 days, or delivered to the point of debarkation within 90 days.

C.2.2 All equipment shall be designed for heavy commercial use.

C.2.3 All equipment supplied shall be standard new equipment that is free from flaws and defects. NAFI will reject any surplus seconds, factory rejects, close-outs, or distressed cardio equipment. Shipments of defective or shop worn cardio equipment will be returned at the Contractor’s expense, and the contract will be subject to termination for default.

C.2.4 The Contractor shall ensure that stated performance capabilities of the equipment are certified and warranted. All equipment provided under this contract shall come with all standard manufacture technical and maintenance manuals. All manuals shall be in English, and shall be written for the specific cardio equipment provided.

C.2.5 The Contractor shall have a permanent business as a manufacturer or authorized distributor that carries stock and a reasonable inventory of cardio equipment for commercial use.

C.3 SIGNIFICANT CHANGES IN TECHNOLOGY OR ENVIRONMENT:

In the event that the Contractor replaces an item of equipment in its inventory with a new version or model, and offers such item as a substitute for the version or model originally identified in the contract, the Contracting Officer may elect to treat this as an accommodation shipment and accept the item(s) for the same price as originally listed in the order. Should the Contractor offer an item that incorporates a significant change in technology beyond that already existing in the version or model originally identified in the contract, the Contractor may either offer this as an accommodation at the same price as the item being replaced, or submit a proposal for an alternative price. If the Contracting Officer elects not to accept the accommodation shipment or proposal for an alternative price, the Contractor shall offer to the Navy, on a priority basis, any remaining items of the version or model originally listed in the contract, in new and unused condition, still in inventory, at the original contract price. Under this ID/IQ contract, the Contracting Officer at all times reserves the right to obtain its requirements from any other source if in the best interests of the Navy.

The Contractor is placed on notice that the equipment in this contract will be shipped to and operated in a variety of environments throughout the Navy, both CONUS and OCONUS, and both on shore installations and shipboard. Any averment that the equipment has been subject to a significant change in environment will be examined in light of the fact that the environments routinely encountered by the Navy throughout the world can be harsh and extreme.

The Contracting Officer reserves the right to cancel an order under the contract, or the entire contract, if items are non-conforming to the requirements of the contract; if there is any significant detrimental impact to the U.S. Navy operations due to the function or delivery of the items; or if the items otherwise fail to meet the needs of the Navy (e.g., new model is not PRT approved) and the Contractor cannot resolve the problems or deficiencies in a timely manner.

C.4 Fast Attack Submarine (SSN) Treadmill:

a. BIOMECHANICAL AND ERGONOMIC ACCURACY

1. Belt/running surface designed to absorb shock at the point of impact without changing the Biomechanics of running (eliminates the harmful shock of connective tissue).

2. Laterally stable surface that provides a firm surface for push off.

3. Stability of speed/incline. Machine does not walk or move from side to side during operation.

4. Safety (kill) switch within normal (arm swing) reach while operating.

5. Controls are located so that programming can take place without changing the biomechanics of running.

6. On-the-fly-programming, with at least seven (7) user programs and the ability to customize at least four (4) program

7. Heart rate monitoring system: sensors located on fixed hand rails and/or equipped for heart rate telemetry reading.

b. STRUCTURAL DURABILITY

1. Fully operation capable with at least maximum user weight of 350 lbs.

2. Belt/deck can be flipped to double normal life expectancy, or alternate technologies provided to extend life expectancy.

3. Belt support system designed for self-centering and noise reduction.

4. Speed sensor (s) and flywheel machining ensure sensor readings are not affected by dust/dirt.

5. Frame coating process included rust resistant undercoat and cosmetic topcoat.

c. OPERATION REQUIREMENTS

1. FCC Class A, Regulatory Compliance, Approved for Heavy Commercial Use.

2. Power requirement available in 120V, requires no more than one dedicated 20-amp circuit when operating at full capacity.

3. Motor, minimum, 3HP AC, minimum speed range, 0.5-12 mph

4. Incline motor must be disabled.

5. Display Readout: Shall display at a minimum: elevation, speed, distance, Heart

Rate, Calories and Average Pace

6. Ability to preset parameters (limit exercise/pause time).

7. Running Surface: Minimum surface area 60” X 20”.

8. Overall size and weight of treadmill will not exceed 80”L X 29.5”W X 60”H and

300 pounds.

9. Deck Step Height shall not exceed 7.5”.

10. Must be able to be disassembled and placed in compartment designated for treadmills on board Fast Attack Submarines (29.5in diameter circle). US Navy reserves the right to determine if product meets this requirement. Video submission of compliance required.

C.5. BIKE (FAN FRONT):

a. BIOMECHANICAL AND ERGONOMIC ACCURACY.

1. Stroke length: Minimum of five height/seat adjustments to allow for adaptation to the natural motion of the user.

2. Ergonomically handlebars, controls within normal reach while operating. Controls are located so that reprogramming can take place without changing the biomechanics of pedaling.

3. Distribution of effort (primary energy expense) can fluctuate at the users convenience while pedaling.

4. Seat is fixed at an angle that provides optimal gluteal, quad and hamstring involvement.

5. Motion allows for the user's foot to remain in full contact with the foot pedal through the pedaling motion.

b. STRUCTURAL DURABILITY.

1. Fully operation capable with maximum user weight of at least 350 lbs.

2. Transport wheels for easy mobility.

3. Frame coating process includes rust resistant undercoat and cosmetic topcoat.

c. OPERATION REQUIREMENTS (REGULATORY COMPLIANCE, APPROVED FOR

HEAVY COMMERCIAL USE).

1. Power: Self-powered

2. Auto start option (brings power to console when user begins pedaling) at the push of a single button.

3. Display Readout: shall display at a minimum elapsed time, total calories burned, calories burned per hour, watts, METs, workout profile, resistance level, speed, and distance covered.

4. Ability to preset parameters (limit exercise/pause time).

5. The bikes shall not exceed 200 lbs.

6. On-the-fly-programming with more than five programs.

7. Heart rate monitoring system: Sensors located on fixed handles and/or equipped for heart rate telemetry reading.

8. The bike will have more than 20 fan and wind resistance settings.

C.6. VERTICAL JUMP AND SPEED TRAINING SYSTEM:

1. System provides multi-point leg and arm loading on-platform training

2. System provides off-platform attachments for speed training

3. System is available in a minimum of two sizes in a platform option

4. System is available in a minimum of two sizes in a mobile system

5. Platform variation must provide a minimum of 20 feet of off-platform speed training

6. System must include a minimum of waist harness belt, hip flexor set, ankle strap set and palm strap set

7. System allows for multiple band attachment, providing various resistance

C.7 REGENERATION KIT:

Kit contents

1. Items must come in a durable carrying case with NOFFS branding

2. Material will be nylon construction

3. Bag will keep items organized with compartments

4. Item has drawstring cinch design

5. Dimensions 18” x 14”

6. Items 1-4 (2a or 2b) are required with the option for installations to add items 5-6.

1a. Small Massage Ball

• Ball that is between 2.5 inches in height

• Designed to improve foot and ankle mobility

• Designed to relieve tightness in muscles and restore movement.

• Easily cleaned, reducing the spread of germs.

• Ball can be used on hard surface

2a. Massage “Barrel” Roller

• Roller constructed of foam or greater material that prevents the spread of germs

• The massage roller has a three-dimensional surface to promote flow of blood and oxygen

• Core maybe hollow or solid with the ability to support up to 500lbs

• Approximately 13 inches in length

• Is 5.5 inches in diameter

• No more than two pounds in weight

• Designed for self-message that assist in the relieving tight muscles, knots and kinks

2b. Foam Roller - Universal

• Roller constructed of foam or greater material that prevents the spread of germs

• Ergonomic shape

• Universal roller to target muscle tension from head to toe

• Core maybe hollow or solid with the ability to support up to 300lbs

• No more than three pounds in weight

• Peanut shape with a texture that stimulates circulation and increases mobility

• Designed for self-message that assist in the relieving tight muscles, knots and kinks

3. Peanut Roller

• Roller constructed of foam or greater material that prevents the spread of germs

• Roller is no more than 3 inches in height and 10 inches in length

• Roller is peanut shaped

• Roller is between no more than 2 pounds

• Ergonomic and spine friendly design which cradles the spine

• Roller is designed to relieve pain, improve flexibility and mobility

4. Stretching Strap

• Strap designed to increase flexibility in the body with a multiple loops to accommodate a variety of users

• Strap is designed for static stretching

• Strap is made of a durable nylon material or better

• Strap is 75.5 inches and 1 inch wide

• Strap will weigh one pounds

Additional Optional Items

5. Massage Roller

• Roller must be adjustable for tripper point release

• Roller has interchangeable balls/massage tools

• Designed for head-to-toe massage and stretching to increase muscle flexibility

• Constructed of a durable nylon strap with handles

• Roller weighs 1.5 pounds

6. Medium Massage Ball

• Massage tool that is 5 inches and weighs less than 6lbs

• Designed to relieve tightness in muscles and restore movement

• Easily cleaned, reducing the spread of germs

• Ball can be used on hard surface

C.8 SUSPENSION MOUNTING EQUIPMENT:

a. Group Training Frame (Floor)

1. Anchoring system designed to support medium to large group training sessions.

2. Available in two different anchoring heights

3. Available in a minimum of five lengths

4. Anchoring system must be made for indoor/outdoor use

5. Anchoring system must include accessories for easy transport

6. Anchoring system can be utilizing for accessory exercises (i.e. pull-ups, dips) and equipment (i.e. heavy bag, battle ropes)

b. Group Training Frame (Wall)

1. Anchoring system designed to support individual, medium to large group training sessions

2. Available in multiple configurations based on facility space

3. Construction is durable, commercial grade steel

4. System must include all required installation tools

c. Group Integrate Training and Storage

1. Anchoring system designed to support individual, medium to large group training sessions

2. Available in multiple configurations based on facility space

3. Construction is durable, commercial grade steel

4. System must include all required installation tools

C.9 STAIR MACHINE:

a. BIOMECHANICAL AND ERGONOMIC ACCURACY

1. Stair machine must be designed for an integrated motion allowing the arms and legs to work simultaneously or allow the legs to work independently while climbing steps.

2. Must have a standard stair stepping pattern that mimics climbing steps

b. STRUCTURAL DURABILITY AND SPECIFICATIONS

1. Height of machine must be no greater than 90 inches.

2. Weight must be no more than 500 lbs.

3. Base size must be approximately 60” X 35”

4. Structure must be steel, double welded.

5. Must have a digital display model, to include time and intensity. Offeror should submit base unit with possible display upgrades

6. Must have side hand rails.

7. Must wheels for easy mobility and positioning.

8. Machine max user weight must be greater than 350 lbs.

9. Step height shall not be greater than 10 in

c. OPERATION REQUIREMENTS

1. Must be able to be powered by a100-240 volts, 50/60 HZ, 3 Amps

2. Module Display must contain a minimum of 20 resistance/speed levels

3. Must have Heart Rate Monitoring and Display.

C.10 TRAINING BOX AND LOCKERS (Single Source):

a. Training Box

1. Training box must come in a minimum of three sizes; medium, heavy and customizable (all customizable options should be included in proposal)

2. Training box must be designed to support functional fitness for a minimum of 8 people

3. Training box must include a minimum of two squat stations and pull-up bars

4. Training box and its contents must allow for customized equipment and quantities to fit deployed environment

5. Box must include a minimum of 20 pieces of equipment which includes; bumper plates, safety squat arms, dip bar, kettlebells, battle rope, foam roller, Olympic bar, sandbag, stretching bands and trigger point recovery tools

6. Locker must be suitable for indoor or outdoor use

7. Training box must be made of commercial steel and coated to prevent rust and damage from extreme weather

8. Training locker must be able to be broken down and fit on military vehicles and ships

9. Set up and break down time cannot exceed 30 minutes

10. Training box height should be between 8 and 9 feet with multiple fixed heights preferred

11. Training box must be stable, with mechanisms in place to prevent the box from tipping over while in use

12. Training box must include all anchors to maximize stabilization of the unit

13. Overall weight when emptied does not exceed 400 pounds

14. When disassembled must fit through a standard Navy watertight door (26” W x

54”H) if being ordered for a fleet unit

b. Tactical Locker

1. Training locker must come in a minimum of three sizes with various weight options;

8 ft, 10ft and 20ft and customizable (All customizable options should be included in proposal)

2. Locker must be water and weather resistant

3. Training locker must be designed to support functional fitness for a minimum of 40 people

4. Training must include a minimum of three squat stations and pull-up bars

5. Training locker and its contents must allow for customized equipment and quantities to fit deployed environment

6. Box must include a minimum of 50 pieces of equipment which includes; bumper plates, safety squat arms, dip bar, kettlebells, battle rope, foam roller, Olympic bar, sandbag, stretching bands and trigger point recovery tools

7. Locker must be suitable for indoor, outdoor and aboard ships

8. Training locker must be made of commercial steel and coated to prevent rust and damage from extreme weather

9. Set up and break down time cannot exceed 120 minutes

10. Training box must be stable, with mechanisms in place to prevent the locker from tipping over while in use or during destructive weather

11. Training box must include all anchors to maximize stabilization of the unit

12. Locker includes offline access to mobile application for deployed for training reinforcement for deployed commands

13. Locker must allow for customized graphics options

C.11 CONTRACTOR SUPPORT:

The Contractor shall provide the comprehensive support capability indicated below for all equipment purchased under this contract, for the entire equipment life cycle. Support required is as follows:

a. PROGRAM MANAGEMENT: The Contractor shall establish a management structure that ensures the overall quality of all equipment and compliance with delivery schedules.

A designated program manager shall be identified to serve as the principal representative of the Contractor throughout the term of the contract. The individual shall coordinate with the Contracting Officer and/or Contracting Officer’s Representative (COR) on any issues related to the successful performance of the contract. This includes, but is not limited to, coordinating training schedules and logistical activities, and conducting regular meetings and reviews with the Contracting Officer and/or COR. U.S. Navy reserves the right to delegate to other employees/field personnel logistical, training class management, etc.

b. EMERGENCY REPAIRS: The Contractor shall provide on-site emergency repair service at fitness centers and Deployed Forces Offices. The Contractor shall fix or schedule a course of action within 48 hours of notification.

c. INVENTORY OF PARTS:

1. Shore: The contractor shall provide logistical support for parts covered and not covered under warranty. The Contractor shall provide new, quality parts and ensure 100% customer satisfaction through a parts warranty.

2. Fleet: The Contractor shall provide logistical support for parts covered and not covered under warranty. The Contractor shall provide new, quality parts and ensure 100% customer satisfaction through a parts warranty. An inventory of basic, commonly used parts shall be provided to Deployed Forces Support Offices. At the time of purchase a replacement parts inventory to be pre-staged at the DFS warehouse(s) across the Navy will be negotiated with each vendor by the Primary Contracting Officers Representative (COR), or the Alternate COR.

3. Assembly: The Contractor shall assemble and install all equipment purchased under this contract at shore fitness facilities as required. CONUS equipment (shore) shall be installed at delivery, or within 24 hours of delivery or notification of receipt. For OCONUS equipment, the Contractor has seven (7) days to install or have a plan of action to install equipment at OCONUS sites.

d. INSTALLATION, PRODUCT AND SERVICE TRAINING REQUIREMENTS FOR

SHORE FITNESS FACILITIES:

1. Shore Fitness Facilities: The Contractor shall provide installation of equipment and product and service training at the time of equipment delivery as needed.

2. Product and service training shall cover the proper use and sanitation of all fitness equipment. Service training shall include proper preventative maintenance and minor repairs. Additionally, the Contractor(s) shall conduct a review of all replacement and failed equipment parts, and provide instructions on how to obtain additional replacement parts.

3. The Contractor shall provide a copy of Standard Operating Procedures, in English, for preventative maintenance to Fitness Center Managers and Deployed Forces Offices.

e. SHIPPING AND DELIVERY:

1. Equipment going to CONUS locations shall be received within 90 calendar days.

Equipment going to OCONUS locations must be delivered to the specified point of debarkation within 90 days and delivery to shipping address within 120 days.

Contractor is responsible for the equipment until the requirement reaches its destination

2. The Contractor shall be familiar with packaging and shipping procedures to

OCONUS locations. OCONUS locations shall be shipped using best commercial practices via ocean freight. All OCONUS shipping arrangements shall be made by the Contractor unless another freight transporter is being used and is indicated on the Delivery Order. The Contractor shall complete all custom forms and documentation for OCONUS shipments they are transporting.

3. Delivery Orders will indicate the final destination Point of Contact (POC), telephone numbers, fax numbers, e-mail addresses, and equipment and quantities being shipped.

For CONUS orders the Contractor shall contact the final destination POC by telephone or e-mail a minimum of 72 hours prior to delivery. For OCONUS orders, the Contractor shall notify the destination POC and/or COR within 72 hours when the shipment was picked up or delivered to port.

C.12 PROBLEM RESOLUTION:

a. ORDER AND INVOICE DISCREPANCIES:

1. The Contractor shall resolve all order and invoice discrepancies (e.g. shortages, damaged equipment, etc) within five (5) business days from notification.

2. If the discrepancies cannot be resolved within five (5) business days, the Contractor shall take all the steps the Contracting Officer deems necessary or appropriate to resolve the discrepancies.

b. DEFECTIVE EQUIPMENT:

1. The Contractor shall repair all fitness equipment found to be defective because of quality problems within five (5) business days after notification by the Contracting Officer or COR.

2. If the equipment cannot be fixed at the facility the Contractor shall be responsible for picking up the defective equipment within five (5) business days after notification by the Contracting Officer or COR, with no additional charge for transportation. Equipment shall be returned or replaced within 30 calendar days at CONUS locations, or within 45 calendar days for OCONUS locations, with no additional charge for transportation.

C.13 WARRANTY:

1. All fitness equipment furnished under this contract shall be covered by the most favorable commercial warranties offered by the Contractor.

2. The warranty shall encompass comprehensive worldwide support to OCONUS Naval locations including Korea, Japan, Europe, Diego Garcia, Singapore, Guam, and Bahrain.

C.14 REPORTING:

1. The Contractor shall maintain an inventory control system to track all shipped equipment.

2. The Contractor shall provide the COR with a bi-weekly shipping report/status report.

At a minimum, the bi-weekly status report shall indicate the locations the equipment is being shipped to, the estimated delivery/arrival date of the equipment, the equipment being shipped to include individual quantities, and the company used to transport the equipment with tracking information.

C.15 PERFORMANCE CRITERIA

Operational Hours. The normal duty schedule is between the hours of 0800 - 1700. The duty schedule is subject to change based on government requirements.

C.15.1 Federal Holidays - The U.S. Government recognizes the following Legal Holidays established by Federal Statute:

• New Year’s Day – January 1

• Martin Luther King Jr. Day – Third Monday in January

• President’s Day – Third Monday in February

• Memorial Day – Last Monday in May

• Independence Day – July 4

• Labor Day – First Monday in September

• Columbus Day – Second Monday in October

• Veteran’s Day – November 11

• Thanksgiving Day – Fourth Thursday in November

• Christmas Day – December 25

C.15.2 When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday is observed as a legal holiday. The list of holidays relates to Government duty days and is not intended to supplement or otherwise alter the provisions of any Wage Determination or Collective Bargaining Agreement regarding applicable paid holidays.

C.15.3 In addition to the days designated as holidays, the Government observes the following days:

• Any other day designated by Federal Statute

• Any other day designated by Executive Order

• Any other day designated by a Presidential Proclamation

C.15.4 It is understood and agreed between the Government and the contractor that observance of such days by Government personnel shall not be a reason for an additional period of performance or entitlement of compensation except as set forth within the task order. In the event the contractor’s personnel work during a holiday or other day observed by the Government employees (see above holiday listing), the contractor may reimburse them; however, no form of holiday or other premium compensation will be reimbursed by the Government, either as a direct or indirect cost, other than their normal compensation for the time worked.

C.15.5 When the Department of Defense grants excused absence to its employees, the contractor agrees to continue sufficient personnel to perform critical tasks already in operation or scheduled, and the contractor shall be guided by the instructions issued by the Contracting Officer or the Contracting Officer’s Representative (COR).

C.15.6 If Government personnel are furloughed, the contractor shall contact the Contracting Officer or the COR to receive direction. It is the Government’s decision as to whether contract support will be affected as a result of Government shutdown and/or furloughed Government employees.

C.15.7 Nothing in this section abrogates the rights and responsibilities of the parties relating to any “stop work” clause or provision included in other sections of the contract.

C.15.8 Overtime is not authorized under this contract.

C.16 GOVERNMENT/NAFI FURNISHED EQUIPMENT: NOT USED

C.17 EDUCATION AND EXPERIENCE: NOT USED

C.18 KEY PERSONNEL : NOT USED

C.19 SECURITY. The contractor shall comply with all applicable Department of Defense (DoD) security regulations and procedures during the performance of this contract. The contractor shall not disclose and must safeguard sensitive information, computer systems and data, privacy act data, and Government and contracted personnel work products that are obtained or generated in the performance of this contract.

C.19.1 The contractor is responsible for safeguarding information of a sensitive nature.

Failure to safeguard any privileged information which may involve the contractor or the contractor's personnel or to which they may have access may subject the contractor and/or the contractor's employees to criminal liability under Title 18, section 793 and 7908 of the United States Code.

C.19.2 Clearances. All contractor employees supporting this project require a minimum of a National Agency Check and Inquiries (NACI) clearance.

C.20 CONFIDENTIALITY. This project and all materials provided to the Contractor by the Government and results, conclusions and recommendations obtained thereof shall be considered confidential in nature and treated with the same level of care that the Contractor treats its own confidential business information. The information shall not be disclosed, copied, modified, used (except in the completion of this project) or otherwise disseminated to any other person or entity at any time to include, but not limited to inclusion in any database external to the Government without the Government’s express consent.

C.21 INTELLECTUAL PROPERTY RIGHTS. No data provided to, or developed by, the contractor shall be used for any purpose other than this contract and subsequent task orders. All information (data files and hard copy) become the property of the government and the contractor shall return them to the designated program manager and or COR, at the completion of the task.

C.22 PRIVACY ACT. Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code, Section 552a and applicable agency rules and regulations. Any information reported, summarized, or otherwise considered procurement sensitive that comes about through the work performed will not be distributed or discussed outside the framework of the Data Layer Optimization Project. All programs and materials developed at government expense during the course of this contract are the property of the government. Contractor personnel shall be required to obtain and maintain security badges and adhere to the security requirements of the installation. The Government will retain rights to all intellectual property produced in the course of performing the tasks in this PWS.

(End of Section C)

2019 JUN 21
P0002
2019 JUN 18
NONAPPROPRIATED FUNDS $
X
CNICINST 7043.1, NAF PROCUREMENT POLICY
CHRISTOPHER SAUNDERS
19 MARCH 2019