12 JUL 2012

TECHNICAL ADDENDUM NO. 1

New Commissary & Navy Exchange NSA Annapolis, Maryland

Incorporate the following items in the Contract Documents.

TO THE SPECIFICATIONS:

1. Section 01750 – FIRE PREVENTION, SAFETY, AND SECURITY: Revise paragraph 1.6.1 to read as follows:

Regulatory Requirements: In addition to the detailed requirements included in the provisions of this Contract, comply with the most recent edition of USACE EM 385‐1‐1, Health and Safety Requirements Manual, and the following: OSHA 29 CFR 1910, 1926, and 1960, 30 CFR 56, DODI 6055.1, DODI 6055.3, AR 40‐5, AR385‐10, and FAR Clause 52.236‐13. Where the requirements of these specifications, applicable laws, criteria, regulations, and referenced documents vary, the most stringent requirements govern.

2. Section 15430 – PLUMBING SPECIALTIES: Delete paragraph 1.16.1.a “Shall conform to Federal Specification GG‐M‐2802, Style B, and replace with “provide Elster American Meter Model S‐ Sonic or approved equal. Replace paragraph 2.15.1.a. “Rockwell Equimeter” with “Sensus”, and replace paragraph 2.16.1.b. “American Meter” with “Elster American Meter”.

3. Section 16055 – OVERCURRENT PROTECTIVE DEVICE COORDIANTION: Revise paragraph 1.3.4 to read as follows: “1.3.4. Other Action Submittals – These submittals are to be submitted prior to initial setting of overcurrent devices and prior to energizing each building’s service or the Commissary and Navy Exchange.

Submit all required information to the Contracting Officer for review and approval prior to setting and energizing. The installing electrical contractor shall be required to use and implement this information for initial setting and final settings.”

TO THE DRAWINGS:

4. Sheet C7.1 –

See attached supplementary drawing SD‐C7.1 identifying revised location of electrical power for Store Hours sign.

Detail #2 revised to change the wording of Note #2 from Communications Raceway to Underground Raceway.

5. Sheet A8.1.1 – Detail “E” Lavatory Counter Section: Change steel tube support size from 1‐1/2” x 1‐1/2” to read 2” x 3” with 2” x 3” floor mounted support posts at each end and concealed within GWB partition.

6. Sheet P0.0 –

Change 4CKFD shown on plumbing equipment schedule to 4CKT.

Delete 4CKFD – 2‐ Compartment sink with Disposal.

Change description for 4S02‐D to replace ½ HP motor with ¾ HP motor.

Change model number for Roof Overflow Drain OD‐1 from ZURN Z100‐DR‐89.

7. Sheet P0.2 ‐ Add Sheet Keyed note #13 to the overflow and roof drains shown in rooms #57 and #55.

nicholka Typewritten Text

HDEC03-12-R-0006 AMEND 01

ATTACHMENT 03

8. Sheet P1.3 –

Delete Sheet Keyed notes #4 and #5 shown on the exterior of the building in the area of from rooms 100 and 900.

Delete the 4” sizing information shown in the area of room 101.

9. Sheet P1.5 ‐ Move roof vent locations shown with note #13 on west wall to be installed behind the dashed soffit line so that the roof vent piping is not visible from the sales area.

10. Sheet P1.6 –

See attached supplementary drawing SD‐P1.6 adding FD‐6 floor drains in rooms 67 and 59/61/62.

See attached supplementary drawing SD‐P1.6 that graphically indicates location of 4CKT sink in room 34.

See attached supplementary drawing SD‐P1.6 that changes waste pipe routing to 3FD‐2 located outside room 68.

11. Sheet P2.1 ‐ Change the installed location of frost proof sill cock shown in room 500 to moved to the south so that the piping can be concealed in the south wall of room 500.

12. Sheet P2.2 ‐ Change the installed location of frost proof sill cock shown in room 500 to moved to the south so that the piping can be concealed in the south wall of room 500. This is a carryover revision from drawing P2.1.

13. Sheet P2.3 –

Delete Sheet Keyed note #6 in the following locations: shown on the building exterior near rooms 100 and 900.

Delete the ½” and ¾” water line sizing shown near rooms 600 and 900.

14. Sheet P2.5 –

See attached supplementary drawing SD‐P2.5 deleting gas piping to 1B15 Oven in room 73/74.

See attached supplementary drawing SD‐P2.5revising installed location of the gas piping for 1B12B oven in room 73/74.

15. Sheet P2.6 ‐ See attached supplementary drawing SD‐P2.6 adding Key note #18 to the water meter in room 31C.

16. Sheet P3.2 – See attached supplementary drawing SD‐P3.2 revising detail to clarify that connection to misting system is located in room 44A.

17. Sheet FA1.1 – Relocate fire alarm manual pull station on west side of aluminum and glass entrance doors, to GWB partition on west side of aluminum and glass storefront framing. Location may change depending on Bank interior finish requirements.

18. Sheet FA1.2 – Remove cross hatch pattern in Beer Cooler (RM. 106).

19. Sheet FA1.3 –

Relocate fire alarm manual pull station on west side of automatic sliding entrance doors at Entry Vestibule (RM. 100) to GWB partition immediately adjacent to automatic sliding entrance doors.

Relocate Remote Annunciator Panel (ANN) and Local Operating Console (LOC) to west side of automatic sliding entrance doors at Entry Vestibule (RM. 100) adjacent to manual pull station.

Relocate fire alarm manual pull station on east side of automatic sliding entrance doors at Entry Vestibule (RM. 100) to west face of 18‐inch square GWB enclosure located approximately 8 feet to the north.

20. Sheet FA1.6 –

Add manual pull station and Mass Notification LED Text Sign at exit door 37D.

Add exterior weatherproof Fire Alarm / Mass Notification speaker at exterior trash platform.

21. Sheet FS1.2 –

Add Sheet Keynote 7 for sprinkler coverage at exterior trash platform.

Add Sheet Keynote 5 for sprinkler coverage at Bakery Chill Storage (RM. 75).

Sheet Keynote 3 – Revise note to add “Piping (and all associated hangers, braces, etc.) shall be concealed behind face of soffit.

Replace detail 2/FS1.2 with attached supplementary drawing SD‐FS1.2.A that revises location of sprinkler system risers from west wall of room to east wall of room.

22. Sheet FS2.1 – Replace detail 7/FS2.1 with attached supplementary detail SD‐FS2.1A, clarifying required insulation around dry pendant sprinkler heads.

23. Sheet R3.1 – UNIT COOLER SCHEDULE: Change room temperature at UCI‐6 from +6 degrees to read ‐6 degrees.

24. Sheet E1.1 ‐ Contractor shall hang emergency exit signs in room 500 from the canopy structure. Two locations shown.

25. Sheet E1.4 – Delete sheet keyed note #1 from the drawing.

26. Sheet E2.3 ‐ Replace Sheet Keyed note #12 in room 101 with Sheet keyed note #13.

27. Sheet E2.5 –

See attached supplementary drawing SD‐E2.5 adding GFI type electrical receptacle for EWC located on the east wall of room 81. Provide power to this receptacle from L2AL‐31.

See attached supplementary drawing SD‐E2.5 revising detail reference for room 31A.

28. Sheet E2.7 –

Revise Sheet Keyed note #7 to add a reference to detail 1 on sheet E2.7.

Revise drawing reference on detail #1 from E2.3 to E2.7.

29. Sheet E7.7 – See attached supplementary drawing SD‐E7.7 adding circuit for EWC located in room 81.

END OF TECHNICAL ADDENDUM NO. 1

Itasca, Illinois 60143-3146 300 Park Boulevard, Suite 250 Bochenek Jenkins Olsen Snoble The Jenkins Group

Itasca, Illinois 60143-3146 300 Park Boulevard, Suite 250 Bochenek Jenkins Olsen Snoble The Jenkins Group

PANEL 'L2AL'

0 RECPT 5 HEAT

1 LTG 6 A/C

2 EQUIP 7 KITCH

3 MTR 8 ELEV

4 COMP 9 125%

CKT AMPS POLE CIRCUIT DESCRIPTION LOAD TYPE PH TYPE LOAD CIRCUIT DESCRIPTION POLE AMPS CKT

1 20 1 STORE ADMIN/DIRECTOR RECEPT 1080 0 A 2 750 CHECKSTAND 1 1 20 2

3 20 1 TRAINING AREA RECEPT 540 0 B 2 750 CHECKSTAND 2 1 20 4

5 20 1 TV RECEPT 600 2 C 2 750 CHECKSTAND 3 1 20 6

7 20 1 SECRETARY/GROCERY/CAO MGER RECEPT 720 0 A 2 750 CHECKSTAND 4 1 20 8

9 20 1 PROJECTOR 600 2 B 2 900 VENDING MACHINE 1 20 10

11 20 1 TRAINING ROOM RECEPT 900 0 C 2 900 VENDING MACHINE 1 20 12

13 20 1 CORRIDOR/ OUTSIDE RECEPT 540 0 A 2 900 VENDING MACHINE 1 20 14

15 20 1 VENDING MACHINE 600 2 B 2 900 VENDING MACHINE 1 20 16

17 20 1 BREAKROOM RECEPT 900 0 C 0 920 CASH COUNT RECEPT/ DOOR BUZZ TRANS 1 20 18

19 20 1 REFRIGERATOR 1000 2 A 2 1920 ICE MAKER 1 20 20

21 20 1 COFFEE MAKER 1000 2 B 0 720 VENDORS ROOM RECEPT 1 20 22

23 20 1 VESTIBULE RECEPT 1260 0 C 0 720 CASHIER OFFICE CONVEN RECEPT 1 20 24

25 20 1 CASH COUNTING ROOM PLUG MOLD 720 0 A 0 900 SALES/VESTIBULE CONVEN RECEPT 1 20 26

27 20 2 BERKO FAN FORCED WALL HEATER 1498 2 B 1 1200 STORE HOURS SIGN 1 20 28

29 1498 2 C SPARE 1 20 30

31 20 1 EWC 576 0 A SPARE 1 20 32

33 20 1 SPARE B SPARE 1 20 34

35 20 1 ADMIN WORKSTATION 360 4 C 4 360 GROCERY/CAO MANAGER COMP RECEPT 1 20 36

37 20 1 ADMIN WORKSTATION 360 4 A 4 180 SECRETARY OFFICE COMP RECEPT 1 20 38

39 20 1 ADMIN WORKSTATION 360 4 B 2 1498 BERKO FAN FORCED WALL HEATER 2 20 40

41 20 1 SPARE C 2 1498 42

PANEL SUB FEED TOTAL TOTAL DEMAND NOTES:

VA FEED THRU CONN VA AMPS

PHASE A 10,396 0 0 10,396 10,413 87

PHASE B 10,565 0 0 10,565 10,583 88

PHASE C 10,665 0 0 10,665 10,683 89

TOTAL 31,626 0 0 31,626 31,678 88 REVISIONS:

CB TYPE :

PROVIDE :

NEMA 1

SURFACE

BOLT-ON

NEUTRAL BUS

GROUND BUS

BUSSING (A):

VOLTAGE :

INTERRUPTING :

LDP2

MLO

208/120V, 3PH, 4W

10 kAIC RMS SYM

LOCATION :

NOTES :

NSA Annapolis

FDWD3304

ELECTRICAL ROOM 31E

LOAD TYPES

PROJECT :

PROJECT # :

FED FROM :

MAINS RATING (A):

ENCLOSURE :

MOUNTING :

Technical Addendum No. 1
SD-C7.1
SD-P1.6
SD-P2.5
SD-P2.6
SD-P3.2
SD-FS1.2.A
SD-FS2.1.A
SD-E2.5
SD-E7.7

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .