HC1028-16-T-0228__Attachment_1__TR_scenario.docx
DOCX document 26 KB Posted
- Attached to
- DISA HQ Kitchen Equipment Maintenance & Repair
- Solicitation number
- HC1028-16-T-0228
- Issued by
-
Defense Information Systems Agency
About this file
HC1028-16-T-0228_ Attachment 1_ TR scenario
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC102816T0228_QA.pdf | ||
| HC1028-16-T-0228_AMD01.docx | DOCX document | |
| HC1028-16-T-0228__Attachment_A_Kitchen_Equipment.doc | DOC document | |
| HC1028-16-T-0228.docx | DOCX document | |
| HC1028-16-T-0228_Attachment_2__Price_Proposal_Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Work Requirement |X| Statement of Objectives (SOO) / |_| Statement of Work (SOW)
Project: SCENARIO Kitchen Equipment Unscheduled Repairs Location:
Date:
Technical Requirement (TR) Number: xx-xx-xxxx Military Interdepartmental Purchase Request (MIPR) Number:
Suggested Contract CLIN for Work Request: 4 Required Operational Date: xx/xx/xxxx
Government Technical Points of Contact
Primary Point of Contact:
Secondary Point of Contact:
Specific Work Requirements Section: Open Air Screen Cooler is malfunctioning
1. Check power supply; Check compressor functioning, check for leaks.
1. After diagnostic, compressor needs to be replaced
1. Purchase and install new equipment listed below:
0. Compressor
0. Freon
0. Blow torch
1. Program new compressor to ensure temperature maintenance of 40 degrees of below.
General Work Requirements Section
1. All work shall follow the guidance in the DISA CD521 Electrical Safety Program (available in the DISA Facilities Standards). All work shall be supported by an Energized Electrical Work Permit signed by the site Director or his/her appointed designee prior to any energized work. Ongoing, similar, and repetitive electrical work may be covered by an ongoing Permit at the discretion of the site Director.
2. All work shall be conducted IAW the DISA Facilities Standards.
3. The Contractor shall provide redline drawings indicating actual installed paths followed by each circuit to the building Facility Manager and to the Facilities Team.
4. The Contractor shall maintain a clean work area and, after each day’s work, clean the construction site. Projects may require that the Contractor provide additional roll-off or other rubbish specifically for project use. After completion of the job, the Contractor shall ensure that ALL dust and construction materials are removed from the project site. All excess materials and residue left over from the performance of this contract shall be removed from the building and removed from the facility, and shall be disposed of off base. The Contractor shall be responsible for cleaning and vacuuming any dust, trash and any water on the floor for which he is responsible during the course of this contract. NO residual material shall be left on the premises.
5. Any damage to the facility incurred by the Contractor during a project shall be repaired by the Contractor at the Contractor’s expense.
Technical Work Requirement Page 1 of 2
File details come from the government source that posted it. Updated .