This document is a comprehensive set of engineering plans and specifications for an LED lighting installation project by the South Dakota Department of Military at the Army Aviation Support Facility (AASF) in Rapid City. The project involves replacing existing lighting fixtures in Hangar 1 and the surrounding parking area, with detailed plans covering a base bid and an alternate bid option. The scope includes retrofitting 32 Type A panel lights, 21 Type A1 panel lights, 4 recessed panel lights, 2 hanging lights, 6 pendant lights, 20 junction box lights, 2 wall-mounted vanity lights, 3 exterior lights, 6 pole-mounted parking lights, 6 alternate pole-mounted lights, 6 ceiling-mounted exit signs, and 14 emergency lights across approximately 6,547 square feet of facility space.

The procurement emphasizes Build America Buy America (BABA) Act compliance, requiring all proposed lighting products to meet domestic manufacturing standards. Bidders must submit either a 5% certified check or a 10% bid bond with their electronic submission, with electronic bids due on March 27, 2025, at 2:00 PM Mountain Time. A mandatory pre-bid site walk-through is scheduled for March 20, 2025, at 9:00 AM. The project has a 90-calendar day substantial completion timeline from the Notice to Proceed, with an additional 14 calendar days for final completion. Liquidated damages are set at $425 per calendar day for project delays. The lighting specifications include precise requirements such as 4000K color temperature, specific lumen outputs, and mandatory e-waste recycling of existing lighting components. Contractors must provide comprehensive documentation, including BABA certifications and operation and maintenance manuals.

View the file

Other files

File Type Posted
Addendum 1.pdf PDF
Project Manual AASF Lights.pdf PDF
Invitation to Builders Exchanges.pdf PDF
Invitation to Builders Exchanges.pdf PDF
Project Manual AASF Lights.pdf PDF
Hanger 1 Lighting 100 percent.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SHEET No:

G-101

SOUTH DAKOTA DEPARTMENT

OF THE MILITARY

INSTALL LED LIGHTING

CFMO# 467109

Rapid City

MARCH 12, 2025

TE

OF

SOUTH DAKOTAATS

R G

TA

E L

AES9881

U

REDN

DOG

EL

UR

ELP

OET PEH

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

100%

CO

VE

R

SH

EE

T

DE

PA

RT

MENT OF THE MIL ITARY

S T A T E O F S O U T H D A K O

T A

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A

T E

O F

S

U

T H

D

A K

O

TA

03/2025

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

COVER SHEET, NOTES & GENERAL INFORMATION

G-101--------------------------------- COVER SHEET

ED-101--------------------------------LIGHTING DEMO PLAN

ED-102--------------------------------ALTERNATE LIGHTING DEMO

ED-103--------------------------------PARKING LOT LIGHTING DEMO

E-101----------------------------------HANGER ONE LIGHTING PLAN

E-102----------------------------------ALTERNATE LIGHTING PLAN

E-103----------------------------------PARKING LOT LIGHTING PLAN

E-104----------------------------------LIGHTING SCHEDULE

REVISIONS

ZONE LTR DATE APPROVED

UNAUTHORIZED CHANGES

THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,

UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS

MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. THE

ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND

ACCEPTABILITY OF THE DESIGN HERON.

NOTICE TO CONTRACTOR/COUNTY

THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY

ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE REQUESTED TO ASSUME

SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE

COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL

PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND

NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR

FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL

HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH

THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING

FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.

SHEET INDEX

STATE REFERENCE MAP

Rapid City

AutoCAD SHX Text

HARDING

AutoCAD SHX Text

PERKINS

AutoCAD SHX Text

CORSON

AutoCAD SHX Text

CAMBELL

AutoCAD SHX Text McPHERSON

AutoCAD SHX Text

BROWN

AutoCAD SHX Text

MARSHALL

AutoCAD SHX Text

ROBERTS

AutoCAD SHX Text

BUTTE

AutoCAD SHX Text

LAWRENCE

AutoCAD SHX Text

PENNINGTON

AutoCAD SHX Text

CUSTER

AutoCAD SHX Text

FALL RIVER

AutoCAD SHX Text

MEADE

AutoCAD SHX Text

SHANNON

AutoCAD SHX Text

BENNETT

AutoCAD SHX Text

WASHABAUGH

AutoCAD SHX Text

JACKSON

AutoCAD SHX Text

HAAKON

AutoCAD SHX Text

ZIEBACH

AutoCAD SHX Text

DEWEY

AutoCAD SHX Text

STANLEY

AutoCAD SHX Text

JONES

AutoCAD SHX Text

MELLETTE

AutoCAD SHX Text

TODD

AutoCAD SHX Text

TRIPP

AutoCAD SHX Text

LYMAN

AutoCAD SHX Text

HUGHES

AutoCAD SHX Text

SULLY

AutoCAD SHX Text

POTTER

AutoCAD SHX Text

WALWORTH

AutoCAD SHX Text

EDMUNDS

AutoCAD SHX Text

FAULK

AutoCAD SHX Text

SPINK

AutoCAD SHX Text

HYDE

AutoCAD SHX Text

HAND

AutoCAD SHX Text

BUFFALO

AutoCAD SHX Text

BRULE

AutoCAD SHX Text

CHARLES

AutoCAD SHX Text

MIX

AutoCAD SHX Text

GREGORY

AutoCAD SHX Text

DAY

AutoCAD SHX Text

CLARK

AutoCAD SHX Text

CODINGTON

AutoCAD SHX Text

GRANT

AutoCAD SHX Text

DEUEL

AutoCAD SHX Text

HAMLIN

AutoCAD SHX Text

BEADLE

AutoCAD SHX Text

KINGSBURY

AutoCAD SHX Text

BROOKINGS

AutoCAD SHX Text

JERAULD

AutoCAD SHX Text

MINER

AutoCAD SHX Text

LAKE

AutoCAD SHX Text

MOODY

AutoCAD SHX Text

AURORA

AutoCAD SHX Text McCOOK

AutoCAD SHX Text

MINNEHAHA

AutoCAD SHX Text

DOUGLAS

AutoCAD SHX Text

HUTCHINSON

AutoCAD SHX Text

TURNER

AutoCAD SHX Text

LINCOLN

AutoCAD SHX Text

BON

AutoCAD SHX Text

HOMME

AutoCAD SHX Text

YANKTON

AutoCAD SHX Text

CLAY

AutoCAD SHX Text

SANBORN

AutoCAD SHX Text

DAVISON

AutoCAD SHX Text

HANSON

AutoCAD SHX Text

UNION

C-12

MAINTENANCE

COMMANDER

802MECHANICAL

ENTRY

ADMINISTRATION

PLANS

MEN'S

LATRINE

WOMEN'S

LATRINE

OPERATIONS

CORRIDOR

COMMANDER

FIRST

SERGEANT

STORAGE

PLATOON

TOOL

ROOM

HANGAR

6547 SF

COMMUNICATIONS

FIRST

SERGEANT

A

A

A

A A

A

A

A

A A

A A

A

A A

A

A

A

A

A A A

A A

A A

A A

A

A

A

A

A

A

A A A A

A A

A

A

A A

A A

B B

B

B

B

BB B

X

X

X

X

X

X

EMEM

EM

EM

EM

EM

EM

EM

EM

EM EM

EM

EMEM

C

C

C

C

C

C

C

C

C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

D

D

D

D

D

D

D

D

D

D D

D

D

D

D D

D

D

D

D

C

A

E E F

F

F

A

Panel APanel B

Panel M

Panel HP

A

A

A

A

A

A

A

A

A

BASE BID:

All fixtures circled with the cloud are to be demolished.

ROOM 800, 801, 802, 803, 804,

805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 815, 816, and 817.

Exterior Type F metal halide bulbs to be retrofitted, existing fixture to remain Vanity Lights Type E to be retrofitted, existing fixture to remain Demo contactors in Room 803 serving Type D lights

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

LI

GH

TI

N

G

DE

M O

P

LA

N

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

ED-101

SCALE: 1' = 3/32"

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

COMMANDER

802MECHANICAL

ENTRY

ADMINISTRATION

PLANS

MEN'S

LATRINE

WOMEN'S

LATRINE

OPERATIONS

CORRIDOR

COMMANDER

FIRST

SERGEANT

STORAGE

PLATOON

TOOL

ROOM

HANGAR

6547 SF

COMMUNICATIONS

FIRST

SERGEANT

A

A

A

A A

A

A

A

A A

A A

A

A A

A

A

A

A

A A A

A A

A A

A A

A

A

A

A

A

A

A A A A

A A

A

A

A A

A A

B B

B

B

B

BB B

X

X

X

X

X

X

EMEM

EM

EM

EM

EM

EM

EM

EM

EM EM

EM

EMEM

C

C

C

C

C

C

C

C

C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

D

D

D

D

D

D

D

D

D

D D

D

D

D

D D

D

D

D

D

C

A

E E F

F

F

A

Panel APanel B

Panel M

Panel HP

A

A

A

A

A

A

A

A

A

ALTERNATE #1 BID:

All fixtures circled with the cloud are to have the fluorescent tubes, ballasts and tombstones removed.

ROOM 800

Sheet Specific Notes:

1. Type C Fixtures are powered with 120 volt power

2. All Type C fixtures to be retrofitted with new LED tubes

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

AL

TE

RN

AT

E

LI

GH

TI

N G

DE

M

O P

LA

N

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

ED-102

SCALE: 1' = 3/32"

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

Pa rk in g

Lo t D em o

Pl an

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

EM

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

ED-103

SCALE: 1' = 1/16"

Sheet Specific Notes:

1. Base bid: Contractor to remove existing luminares from the pole. Existing concrete pole, pole base and wiring to remain and be re-used. Contractor to inspect pole for damage and provide owner with results.

Alternate 2:

1. Contractor to demo poles and luminaires. Pole bases to remain

AutoCAD SHX Text

RAMP

AutoCAD SHX Text #10

AutoCAD SHX Text C1

AutoCAD SHX Text C1

AutoCAD SHX Text L2A-11

AutoCAD SHX Text C1

AutoCAD SHX Text C1

#10

COMMANDER

802MECHANICAL

ENTRY

ADMINISTRATION

PLANS

MEN'S

LATRINE

WOMEN'S

LATRINE

OPERATIONS

CORRIDOR

COMMANDER

FIRST

SERGEANT

STORAGE

PLATOON

TOOL

ROOM

HANGAR

6547 SF

COMMUNICATIONS

FIRST

SERGEANT

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1

A

A

A

A

AAA

A1

A1

A1

A1

A1

A1

A2

A2 A2

A2

A A A A

A A A A

B

B

B

B

B

A3 A3 BA A

A A

A A

A A A

A A A

D

D

X

X

X

X

X

X

EM EM

EM

EM

EM

EM EM

EM

EM

EM

EM

EM

EM EM

EE

F

F

F h h hh h h h h ii ii j j k k k l l l m m m m m m m m m p p p p p p p n n n o o o q q q r r s s s t t t uu u uu uu u u u u u u u u v v v u q n o m v w w a b au b

A m

A m

A m

A m y y y y

Panel APanel B

Panel M

Panel HP

D a

D b

D b

D a

D a

D b

D a

D a

D b

D b

D b

D a

D a

D b

D a

D a

D b

D b

A

General Notes:

1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry. Minimal rewiring is expected on this project.

2. Verify lumen and/or light color selection on flat panel lights is correct per schedule and consistent throughout room.

3. For all emergency wall mounted lights, contractor to wash/paint wall area previously covered by prior equipment or fixtures to ensure new install has no shadowed paint from previous fixture.

4. Contractor to verify light count. Light count shown on schedule is for reference only.

5. Contractor to provide proper supports for light fixtures.

6. If new conduit is to be installed, conduit is to painted to match existing conduit used elsewhere in the same room.

7. If conduit is removed, contractor to clean/paint shadow on wall to match wall paint.

8. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.

9. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.

10. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.

11. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.

12. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

13. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL

PRODUCTS USED ARE BUILD AMERICA BUY AMERICA ACT

COMPLIANT. BAA COMPLIANCE DOES NOT GUARANTEE

BABAA COMPLIANCE. MORE INFORMATION AVAILIBLE

HERE: https://www.whitehouse.gov/wp-content/uploads

/2022/07/Build-American-Buy-American- Factsheet-and-FAQs-for-Award-Recipients.pd

Sheet Specific Notes:

1. Contactors controlling the hanger high bay switches $ba.

Contactors and existing housing to be replaced. Contactor to specify and provide a BABA compliant contactor setup for the high bay lights.

2. Contactor controlling switches $cdefgx serving Type C Lights.

3. Type D High bays are 208VAC.

4. Existing exterior metal halide fixtures to be retrofitted with new LED bulb. Existing LED exterior lighting to remain.

Base Bid:

Replace all indicated lighting fixtures with new LED fixtures. Some fixtures will be retrofitted. This includes emergency, exit lights, and retrofitting exterior hanger door lights.

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

H an ge r O ne Li gh tin g Pl an

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

E-101

SCALE: 1' = 3/32"

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S f

COMMANDER

802MECHANICAL

ENTRY

ADMINISTRATION

PLANS

MEN'S

LATRINE

WOMEN'S

LATRINE

OPERATIONS

CORRIDOR

COMMANDER

FIRST

SERGEANT

STORAGE

PLATOON

TOOL

ROOM

HANGAR

6547 SF

COMMUNICATIONS

FIRST

SERGEANT

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C x f f f f f f f x e e e e e e e x d d d d d d x c c c c c c c b b b b b b b x c de f g xPanel APanel B

Panel M

Panel HP

General Notes:

1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry. Minimal rewiring is expected on this project.

2. Verify lumen and/or light color selection on flat panel lights is correct per schedule and consistent throughout room.

3. For all emergency wall mounted lights, contractor to wash/paint wall area previously covered by prior equipment or fixtures to ensure new install has no shadowed paint from previous fixture.

4. Contractor to verify light count. Light count shown on schedule is for reference only.

5. Contractor to provide proper supports for light fixtures.

6. If new conduit is to be installed, conduit is to painted to match existing conduit used elsewhere in the same room.

7. If conduit is removed, contractor to clean/paint shadow on wall to match wall paint.

8. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.

9. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.

10. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.

11. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.

12. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.

13. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL

PRODUCTS USED ARE BUILD AMERICA BUY AMERICA ACT

COMPLIANT. BAA COMPLIANCE DOES NOT GUARANTEE

BABAA COMPLIANCE. MORE INFORMATION AVAILIBLE

HERE: https://www.whitehouse.gov/wp-content/uploads

/2022/07/Build-American-Buy-American- Factsheet-and-FAQs-for-Award-Recipients.pd

Alternate #1:

Retrofit all indicated fixtures with new LED tubes.

Sheet Specific Notes:

1. Type C Fixtures are powered with 120 volt power

2. All Type C fixtures to be retrofitted with new LED tubes

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

A lte rn at e Li gh tin g Pl an

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2024

E-102

SCALE: 1' = 3/32"

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text S f

G

G

GG

G

G

SHEET No:

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

Pa rk in g

Lo t L ig ht in g

Pl an

IN

ST

AL

L

LE

D

LI

G

HT

IN

G Ra pi d

Ci ty

A

AS

F

CF

M O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

E-103

SCALE: 1' = 1/16"

General Notes:

1. Base Bid: Only luminaires are to be replaced, existing pole to remain.

2. Contractor to verify if proposed mounting kit will work on existing pole

3. Where demo lights were removed, contractor to weatherproof penetration into existing pole.

4. Existing lighting circuit has no lighting controls, circuit is always hot when breaker is on

Alternate 2:

1. Contractor replace poles and luminaires

2. Proposed pole is Lithonia RTS 20 6-6B DM28 AS PL

DNAXD. (Existing poles near Aviation Readiness Centers are Valmont Aluminum R190840705T4-D1-DNA-VD, but do not have the correct anchor base mounting circle for existing anchors.)

3. Existing bolt circle for concrete bases is 9 12". Contractor to verify.

4. Alternate 2 Luminaire is G2 as shown on Sheet E-104.

AutoCAD SHX Text

RAMP

AutoCAD SHX Text #10

AutoCAD SHX Text L2A-11

#10

SO

U

TH

D

AK

O

TA

A

RM

Y

N

AT

IO

N

AL

G

U

AR

D

CO

N

ST

RU

CT

IO

N

F

AC

IL

IT

Y M

AN

AG

EM

EN

T O

FF

IC

E

W

ES

T M

AI

N

S

TR

EE

T, R

AP

ID

C

IT

Y, S D

5)

-6

FA

X

(6

) 7

-6

DATE:

SUBMITTAL:

LI

GH

TI

N

G

SC

HE

DU

LE

IN

ST

AL

L

LE

D

LI

G

HT

IN

G

Ra pi d Ci ty A

AS

F

CF

M

O

DEPARTM

ENT

O F

TH

E M

IL ITARY

S T A T

E

U

K

O

TA

100%

03/2025

E-104

SCALE: NTS

Hanger 1 Lighting Plan Unit No. Quantities Mounting Existing Proposed Electrical Notes

A 32 Lay in 2'x4' Panel LITHONIA CPX 2X4 4000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA

A1 21 Lay in 2'x4' Panel LITHONIA CPX 2X4 5000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA

A2 4 Recessed 2'x4' Panel LITHONIA CPX 2X4 5000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA DGA24 2

A3 2 Lay In 1'x4' Hanging Light LITHONIA CPX 2X2 4000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA

B 6 Pendant 1'x4' Hanging Light LITHONIA ZL1D L48 7000LM FST MVOLT 40K 80CRI WH BABA

C 40 Pendant 2'x8' Pendant Mounted LBK 4FT 4 8000LMHE 80CRI 40K MIN10 ZT MVOLT BABA

D 20 Junction Box Round High Bays LITHONIA CPHB 30000LM HEF GCL MD MVOLT GZ10 40K 80CRI DWH BABA

E 2 Wall Mounted

2' Wall Mounted Vanity Light LBK 2FT 2 4000LMHE 80CRI 35K MIN10 ZT MVOLT BABA

F 3 Wall Mounted

Exterior Lights RETROFIT EXISTING FIXTURES WITH LED BULB: BASIS OF DESIGN: CURRENT LED TYPE B HID

ED28 REPLACEMENT LAMPS, SKU: 93312102

G 6 Pole Mounted

Exterior Pole Mount Parking Light DSX1 LED P4 50K 70CRI TFTM MVOLT RPA5 PIR DDBXD BABA

GA Pole Mounted

Exterior Pole Mount Parking Light DSX1 LED P4 50K 70CRI TFTM MVOLT RPA PIR DNAXD BABA

X 6 Ceiling Mounted

Exit Signs LITHONIA LE S 1 R EL N BAA

EM 14 Wall Mounted

Emergency Lights LITHONIA ELM6L BAA

Electrical Notes:

1. Light GA Only to be used in alternate, not to be included in base bid

2. Lights are recessed in a sheetrock lid, therefore a sheetrock kit is called out.

AutoCAD SHX Text

467109 Hanger #1 Lighting 100% G101.pdf
Sheets and Views
Title
467109 Hanger #1 Lighting 100% ED101.pdf
Sheets and Views
Shop Demo
467109 Hanger #1 Lighting 100% ED102.pdf
Sheets and Views
Shop Demo Alternate
467109 Hanger #1 Lighting 100% ED103.pdf
Sheets and Views
Exterior Lighting dEMO
467109 Hanger #1 Lighting 100% e101.pdf
Sheets and Views
Lighting plan
467109 Hanger #1 Lighting 100% E102.pdf
Sheets and Views
Alternate
467109 Hanger #1 Lighting 100% E103.pdf
Sheets and Views
Exterior Lighting
467109 Hanger #1 Lighting 100% E104.pdf
Sheets and Views
Lighting Schedule

File details come from the government source that posted it. Updated .