Hanger 1 Lighting 100 percent.pdf
PDF 5 MB Posted
- Solicitation number
- 25IFB14004
- Issued by
- Pennington County, South Dakota
About this file
The documents represent a lighting retrofit project for the South Dakota Army National Guard's Rapid City Armed Forces Support Facility (AASF), issued by the South Dakota Department of the Military's Construction & Facility Management Office. The project, identified as CFMO# 467109, involves installing LED lighting across multiple facility areas including Hanger One, interior spaces, and exterior parking lots, with a submittal date of March 12, 2025. The base bid and an alternate bid option are provided, with the base bid calling for complete replacement of existing lighting fixtures and the alternate bid proposing retrofitting existing fixtures with LED tubes. The project covers approximately 6,547 square feet and includes replacing various lighting types such as 2'x4' panels, pendant lights, high bay lights, wall-mounted lights, exterior pole-mounted lights, and emergency/exit signs.
The lighting retrofit project emphasizes compliance with the Build America Buy America (BABA) Act, requiring all proposed products to meet specific domestic manufacturing standards. The lighting schedule details precise replacement specifications, including specific Lithonia and DSX1 LED fixture models with varying lumen outputs, color temperatures, and mounting configurations. The project includes 32 Type A panel lights, 21 Type A1 panel lights, 40 pendant lights, 20 junction box lights, and 14 emergency lights, among other fixture types. Electrical considerations include minimal rewiring, maintaining existing electrical infrastructure, and ensuring proper fixture mounting heights. The project also includes requirements for recycling existing lighting components as e-waste and completing installations with minimal disruption to building occupants.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 1.pdf | ||
| Hanger 1 Lighting 100 percent.pdf | ||
| Project Manual AASF Lights.pdf | ||
| Invitation to Builders Exchanges.pdf | ||
| Invitation to Builders Exchanges.pdf | ||
| Project Manual AASF Lights.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET No:
G-101
SOUTH DAKOTA DEPARTMENT
OF THE MILITARY
INSTALL LED LIGHTING
CFMO# 467109
Rapid City
MARCH 12, 2025
TE
OF
SOUTH DAKOTAATS
R G
TA
E L
AES9881
U
REDN
DOG
EL
UR
ELP
OET PEH
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
100%
CO
VE
R
SH
EE
T
DE
PA
RT
MENT OF THE MIL ITARY
S T A T E O F S O U T H D A K O
T A
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A
T E
O F
S
U
T H
D
A K
O
TA
03/2025
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
COVER SHEET, NOTES & GENERAL INFORMATION
G-101--------------------------------- COVER SHEET
ED-101--------------------------------LIGHTING DEMO PLAN
ED-102--------------------------------ALTERNATE LIGHTING DEMO
ED-103--------------------------------PARKING LOT LIGHTING DEMO
E-101----------------------------------HANGER ONE LIGHTING PLAN
E-102----------------------------------ALTERNATE LIGHTING PLAN
E-103----------------------------------PARKING LOT LIGHTING PLAN
E-104----------------------------------LIGHTING SCHEDULE
REVISIONS
ZONE LTR DATE APPROVED
UNAUTHORIZED CHANGES
THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR,
UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THE PLANS
MUST BE IN WRITING AND MUST BE APPROVED BY THE PREPARER OF THESE PLANS. THE
ENGINEER SIGNING THESE PLANS IS RESPONSIBLE FOR ASSURING THE ACCURACY AND
ACCEPTABILITY OF THE DESIGN HERON.
NOTICE TO CONTRACTOR/COUNTY
THE CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY
ACCEPTED CONSTRUCTION PRACTICES, HE/SHE WILL BE REQUESTED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE
COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING THE SAFETY OF ALL
PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND
NOT BE LIMITED TO NORMAL WORKING HOURS. THE CONSTRUCTION CONTRACTOR
FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE DESIGN PROFESSIONAL
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH
THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING
FROM THE SOLE NEGLIGENCE OF THE DESIGN ENGINEER.
SHEET INDEX
STATE REFERENCE MAP
Rapid City
AutoCAD SHX Text
HARDING
AutoCAD SHX Text
PERKINS
AutoCAD SHX Text
CORSON
AutoCAD SHX Text
CAMBELL
AutoCAD SHX Text McPHERSON
AutoCAD SHX Text
BROWN
AutoCAD SHX Text
MARSHALL
AutoCAD SHX Text
ROBERTS
AutoCAD SHX Text
BUTTE
AutoCAD SHX Text
LAWRENCE
AutoCAD SHX Text
PENNINGTON
AutoCAD SHX Text
CUSTER
AutoCAD SHX Text
FALL RIVER
AutoCAD SHX Text
MEADE
AutoCAD SHX Text
SHANNON
AutoCAD SHX Text
BENNETT
AutoCAD SHX Text
WASHABAUGH
AutoCAD SHX Text
JACKSON
AutoCAD SHX Text
HAAKON
AutoCAD SHX Text
ZIEBACH
AutoCAD SHX Text
DEWEY
AutoCAD SHX Text
STANLEY
AutoCAD SHX Text
JONES
AutoCAD SHX Text
MELLETTE
AutoCAD SHX Text
TODD
AutoCAD SHX Text
TRIPP
AutoCAD SHX Text
LYMAN
AutoCAD SHX Text
HUGHES
AutoCAD SHX Text
SULLY
AutoCAD SHX Text
POTTER
AutoCAD SHX Text
WALWORTH
AutoCAD SHX Text
EDMUNDS
AutoCAD SHX Text
FAULK
AutoCAD SHX Text
SPINK
AutoCAD SHX Text
HYDE
AutoCAD SHX Text
HAND
AutoCAD SHX Text
BUFFALO
AutoCAD SHX Text
BRULE
AutoCAD SHX Text
CHARLES
AutoCAD SHX Text
MIX
AutoCAD SHX Text
GREGORY
AutoCAD SHX Text
DAY
AutoCAD SHX Text
CLARK
AutoCAD SHX Text
CODINGTON
AutoCAD SHX Text
GRANT
AutoCAD SHX Text
DEUEL
AutoCAD SHX Text
HAMLIN
AutoCAD SHX Text
BEADLE
AutoCAD SHX Text
KINGSBURY
AutoCAD SHX Text
BROOKINGS
AutoCAD SHX Text
JERAULD
AutoCAD SHX Text
MINER
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
MOODY
AutoCAD SHX Text
AURORA
AutoCAD SHX Text McCOOK
AutoCAD SHX Text
MINNEHAHA
AutoCAD SHX Text
DOUGLAS
AutoCAD SHX Text
HUTCHINSON
AutoCAD SHX Text
TURNER
AutoCAD SHX Text
LINCOLN
AutoCAD SHX Text
BON
AutoCAD SHX Text
HOMME
AutoCAD SHX Text
YANKTON
AutoCAD SHX Text
CLAY
AutoCAD SHX Text
SANBORN
AutoCAD SHX Text
DAVISON
AutoCAD SHX Text
HANSON
AutoCAD SHX Text
UNION
C-12
MAINTENANCE
COMMANDER
802MECHANICAL
ENTRY
ADMINISTRATION
PLANS
MEN'S
LATRINE
WOMEN'S
LATRINE
OPERATIONS
CORRIDOR
COMMANDER
FIRST
SERGEANT
STORAGE
PLATOON
TOOL
ROOM
HANGAR
6547 SF
COMMUNICATIONS
FIRST
SERGEANT
A
A
A
A A
A
A
A
A A
A A
A
A A
A
A
A
A
A A A
A A
A A
A A
A
A
A
A
A
A
A A A A
A A
A
A
A A
A A
B B
B
B
B
BB B
X
X
X
X
X
X
EMEM
EM
EM
EM
EM
EM
EM
EM
EM EM
EM
EMEM
C
C
C
C
C
C
C
C
C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
D
D
D
D
D
D
D
D
D
D D
D
D
D
D D
D
D
D
D
C
A
E E F
F
F
A
Panel APanel B
Panel M
Panel HP
A
A
A
A
A
A
A
A
A
BASE BID:
All fixtures circled with the cloud are to be demolished.
ROOM 800, 801, 802, 803, 804,
805, 806, 807, 808, 809, 810, 811, 812, 813, 814, 815, 816, and 817.
Exterior Type F metal halide bulbs to be retrofitted, existing fixture to remain Vanity Lights Type E to be retrofitted, existing fixture to remain Demo contactors in Room 803 serving Type D lights
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
LI
GH
TI
N
G
DE
M O
P
LA
N
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
ED-101
SCALE: 1' = 3/32"
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
COMMANDER
802MECHANICAL
ENTRY
ADMINISTRATION
PLANS
MEN'S
LATRINE
WOMEN'S
LATRINE
OPERATIONS
CORRIDOR
COMMANDER
FIRST
SERGEANT
STORAGE
PLATOON
TOOL
ROOM
HANGAR
6547 SF
COMMUNICATIONS
FIRST
SERGEANT
A
A
A
A A
A
A
A
A A
A A
A
A A
A
A
A
A
A A A
A A
A A
A A
A
A
A
A
A
A
A A A A
A A
A
A
A A
A A
B B
B
B
B
BB B
X
X
X
X
X
X
EMEM
EM
EM
EM
EM
EM
EM
EM
EM EM
EM
EMEM
C
C
C
C
C
C
C
C
C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
D
D
D
D
D
D
D
D
D
D D
D
D
D
D D
D
D
D
D
C
A
E E F
F
F
A
Panel APanel B
Panel M
Panel HP
A
A
A
A
A
A
A
A
A
ALTERNATE #1 BID:
All fixtures circled with the cloud are to have the fluorescent tubes, ballasts and tombstones removed.
ROOM 800
Sheet Specific Notes:
1. Type C Fixtures are powered with 120 volt power
2. All Type C fixtures to be retrofitted with new LED tubes
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
AL
TE
RN
AT
E
LI
GH
TI
N G
DE
M
O P
LA
N
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
ED-102
SCALE: 1' = 3/32"
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
Pa rk in g
Lo t D em o
Pl an
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
EM
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
ED-103
SCALE: 1' = 1/16"
Sheet Specific Notes:
1. Base bid: Contractor to remove existing luminares from the pole. Existing concrete pole, pole base and wiring to remain and be re-used. Contractor to inspect pole for damage and provide owner with results.
Alternate 2:
1. Contractor to demo poles and luminaires. Pole bases to remain
AutoCAD SHX Text
RAMP
AutoCAD SHX Text #10
AutoCAD SHX Text C1
AutoCAD SHX Text C1
AutoCAD SHX Text L2A-11
AutoCAD SHX Text C1
AutoCAD SHX Text C1
#10
COMMANDER
802MECHANICAL
ENTRY
ADMINISTRATION
PLANS
MEN'S
LATRINE
WOMEN'S
LATRINE
OPERATIONS
CORRIDOR
COMMANDER
FIRST
SERGEANT
STORAGE
PLATOON
TOOL
ROOM
HANGAR
6547 SF
COMMUNICATIONS
FIRST
SERGEANT
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1
A1 A1
A1
A1
A
A
A
A
AAA
A1
A1
A1
A1
A1
A1
A2
A2 A2
A2
A A A A
A A A A
B
B
B
B
B
A3 A3 BA A
A A
A A
A A A
A A A
D
D
X
X
X
X
X
X
EM EM
EM
EM
EM
EM EM
EM
EM
EM
EM
EM
EM EM
EE
F
F
F h h hh h h h h ii ii j j k k k l l l m m m m m m m m m p p p p p p p n n n o o o q q q r r s s s t t t uu u uu uu u u u u u u u u v v v u q n o m v w w a b au b
A m
A m
A m
A m y y y y
Panel APanel B
Panel M
Panel HP
D a
D b
D b
D a
D a
D b
D a
D a
D b
D b
D b
D a
D a
D b
D a
D a
D b
D b
A
General Notes:
1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry. Minimal rewiring is expected on this project.
2. Verify lumen and/or light color selection on flat panel lights is correct per schedule and consistent throughout room.
3. For all emergency wall mounted lights, contractor to wash/paint wall area previously covered by prior equipment or fixtures to ensure new install has no shadowed paint from previous fixture.
4. Contractor to verify light count. Light count shown on schedule is for reference only.
5. Contractor to provide proper supports for light fixtures.
6. If new conduit is to be installed, conduit is to painted to match existing conduit used elsewhere in the same room.
7. If conduit is removed, contractor to clean/paint shadow on wall to match wall paint.
8. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.
9. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.
10. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.
11. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.
12. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.
13. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL
PRODUCTS USED ARE BUILD AMERICA BUY AMERICA ACT
COMPLIANT. BAA COMPLIANCE DOES NOT GUARANTEE
BABAA COMPLIANCE. MORE INFORMATION AVAILIBLE
HERE: https://www.whitehouse.gov/wp-content/uploads
/2022/07/Build-American-Buy-American- Factsheet-and-FAQs-for-Award-Recipients.pd
Sheet Specific Notes:
1. Contactors controlling the hanger high bay switches $ba.
Contactors and existing housing to be replaced. Contactor to specify and provide a BABA compliant contactor setup for the high bay lights.
2. Contactor controlling switches $cdefgx serving Type C Lights.
3. Type D High bays are 208VAC.
4. Existing exterior metal halide fixtures to be retrofitted with new LED bulb. Existing LED exterior lighting to remain.
Base Bid:
Replace all indicated lighting fixtures with new LED fixtures. Some fixtures will be retrofitted. This includes emergency, exit lights, and retrofitting exterior hanger door lights.
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
H an ge r O ne Li gh tin g Pl an
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
E-101
SCALE: 1' = 3/32"
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S f
COMMANDER
802MECHANICAL
ENTRY
ADMINISTRATION
PLANS
MEN'S
LATRINE
WOMEN'S
LATRINE
OPERATIONS
CORRIDOR
COMMANDER
FIRST
SERGEANT
STORAGE
PLATOON
TOOL
ROOM
HANGAR
6547 SF
COMMUNICATIONS
FIRST
SERGEANT
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C x f f f f f f f x e e e e e e e x d d d d d d x c c c c c c c b b b b b b b x c de f g xPanel APanel B
Panel M
Panel HP
General Notes:
1. Conduit and wire are not shown. Provide conduit and wire as required for the indicated circuitry. Minimal rewiring is expected on this project.
2. Verify lumen and/or light color selection on flat panel lights is correct per schedule and consistent throughout room.
3. For all emergency wall mounted lights, contractor to wash/paint wall area previously covered by prior equipment or fixtures to ensure new install has no shadowed paint from previous fixture.
4. Contractor to verify light count. Light count shown on schedule is for reference only.
5. Contractor to provide proper supports for light fixtures.
6. If new conduit is to be installed, conduit is to painted to match existing conduit used elsewhere in the same room.
7. If conduit is removed, contractor to clean/paint shadow on wall to match wall paint.
8. If proposed wiring plans leaves a prior used breaker without any load, panel description shall be updated to show breaker being vacant.
9. Contractor to verify mounting heights of all fixtures so that when equipment in the space is in use it will clear fixtures.
10. Contractor to complete removal of existing lighting and installation of new lighting in a particular room as quickly as possible. Preferably within the same day to limit impact on building occupants.
11. Requirements per Defense Logistic Agency, LED Components need to be recycled as E-waste.
12. All components that are called to be demolished shall be recycled as completely as possible per applicable local and higher standards.
13. CONTRACTOR IS RESPONSIBLE TO CLARIFY THAT ALL
PRODUCTS USED ARE BUILD AMERICA BUY AMERICA ACT
COMPLIANT. BAA COMPLIANCE DOES NOT GUARANTEE
BABAA COMPLIANCE. MORE INFORMATION AVAILIBLE
HERE: https://www.whitehouse.gov/wp-content/uploads
/2022/07/Build-American-Buy-American- Factsheet-and-FAQs-for-Award-Recipients.pd
Alternate #1:
Retrofit all indicated fixtures with new LED tubes.
Sheet Specific Notes:
1. Type C Fixtures are powered with 120 volt power
2. All Type C fixtures to be retrofitted with new LED tubes
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
A lte rn at e Li gh tin g Pl an
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2024
E-102
SCALE: 1' = 3/32"
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S f
G
G
GG
G
G
SHEET No:
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
Pa rk in g
Lo t L ig ht in g
Pl an
IN
ST
AL
L
LE
D
LI
G
HT
IN
G Ra pi d
Ci ty
A
AS
F
CF
M O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
E-103
SCALE: 1' = 1/16"
General Notes:
1. Base Bid: Only luminaires are to be replaced, existing pole to remain.
2. Contractor to verify if proposed mounting kit will work on existing pole
3. Where demo lights were removed, contractor to weatherproof penetration into existing pole.
4. Existing lighting circuit has no lighting controls, circuit is always hot when breaker is on
Alternate 2:
1. Contractor replace poles and luminaires
2. Proposed pole is Lithonia RTS 20 6-6B DM28 AS PL
DNAXD. (Existing poles near Aviation Readiness Centers are Valmont Aluminum R190840705T4-D1-DNA-VD, but do not have the correct anchor base mounting circle for existing anchors.)
3. Existing bolt circle for concrete bases is 9 12". Contractor to verify.
4. Alternate 2 Luminaire is G2 as shown on Sheet E-104.
AutoCAD SHX Text
RAMP
AutoCAD SHX Text #10
AutoCAD SHX Text L2A-11
#10
SO
U
TH
D
AK
O
TA
A
RM
Y
N
AT
IO
N
AL
G
U
AR
D
CO
N
ST
RU
CT
IO
N
F
AC
IL
IT
Y M
AN
AG
EM
EN
T O
FF
IC
E
W
ES
T M
AI
N
S
TR
EE
T, R
AP
ID
C
IT
Y, S D
5)
-6
FA
X
(6
) 7
-6
DATE:
SUBMITTAL:
LI
GH
TI
N
G
SC
HE
DU
LE
IN
ST
AL
L
LE
D
LI
G
HT
IN
G
Ra pi d Ci ty A
AS
F
CF
M
O
DEPARTM
ENT
O F
TH
E M
IL ITARY
S T A T
E
U
K
O
TA
100%
03/2025
E-104
SCALE: NTS
Hanger 1 Lighting Plan Unit No. Quantities Mounting Existing Proposed Electrical Notes
A 32 Lay in 2'x4' Panel LITHONIA CPX 2X4 4000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA
A1 21 Lay in 2'x4' Panel LITHONIA CPX 2X4 5000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA
A2 4 Recessed 2'x4' Panel LITHONIA CPX 2X4 5000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA DGA24 2
A3 2 Lay In 1'x4' Hanging Light LITHONIA CPX 2X2 4000LM 80CRI 40K SWL MIN10 ZT MVOLT BABA
B 6 Pendant 1'x4' Hanging Light LITHONIA ZL1D L48 7000LM FST MVOLT 40K 80CRI WH BABA
C 40 Pendant 2'x8' Pendant Mounted LBK 4FT 4 8000LMHE 80CRI 40K MIN10 ZT MVOLT BABA
D 20 Junction Box Round High Bays LITHONIA CPHB 30000LM HEF GCL MD MVOLT GZ10 40K 80CRI DWH BABA
E 2 Wall Mounted
2' Wall Mounted Vanity Light LBK 2FT 2 4000LMHE 80CRI 35K MIN10 ZT MVOLT BABA
F 3 Wall Mounted
Exterior Lights RETROFIT EXISTING FIXTURES WITH LED BULB: BASIS OF DESIGN: CURRENT LED TYPE B HID
ED28 REPLACEMENT LAMPS, SKU: 93312102
G 6 Pole Mounted
Exterior Pole Mount Parking Light DSX1 LED P4 50K 70CRI TFTM MVOLT RPA5 PIR DDBXD BABA
GA Pole Mounted
Exterior Pole Mount Parking Light DSX1 LED P4 50K 70CRI TFTM MVOLT RPA PIR DNAXD BABA
X 6 Ceiling Mounted
Exit Signs LITHONIA LE S 1 R EL N BAA
EM 14 Wall Mounted
Emergency Lights LITHONIA ELM6L BAA
Electrical Notes:
1. Light GA Only to be used in alternate, not to be included in base bid
2. Lights are recessed in a sheetrock lid, therefore a sheetrock kit is called out.
AutoCAD SHX Text
| 467109 Hanger #1 Lighting 100% G101.pdf |
| Sheets and Views |
| Title |
| 467109 Hanger #1 Lighting 100% ED101.pdf |
| Sheets and Views |
| Shop Demo |
| 467109 Hanger #1 Lighting 100% ED102.pdf |
| Sheets and Views |
| Shop Demo Alternate |
| 467109 Hanger #1 Lighting 100% ED103.pdf |
| Sheets and Views |
| Exterior Lighting dEMO |
| 467109 Hanger #1 Lighting 100% e101.pdf |
| Sheets and Views |
| Lighting plan |
| 467109 Hanger #1 Lighting 100% E102.pdf |
| Sheets and Views |
| Alternate |
| 467109 Hanger #1 Lighting 100% E103.pdf |
| Sheets and Views |
| Exterior Lighting |
| 467109 Hanger #1 Lighting 100% E104.pdf |
| Sheets and Views |
| Lighting Schedule |
File details come from the government source that posted it. Updated .