Hangar Door Repair SOW.docx
DOCX document 37 KB Posted
- Attached to
- Assa Abloy Sole Source 125th FW State and local contract opportunity
- Solicitation number
- SS-14811
- Issued by
- St. Johns County, Florida
About this file
This is a Statement of Work (SOW) for hangar door repair services at the 125th Fighter Wing located at Jacksonville International Airport in Duval County, Florida. The project involves repair of a Megadoor Inc. fabric hangar door system, specifically the replacement of one inoperable mullion hoist that has experienced clutch slippage. The work will be performed at Building 1001 (14300 Fang Drive, Jacksonville, FL 32218) during standard business hours of 0700-1600, Monday through Friday, excluding recognized US holidays and government facility closures. The period of performance is three days, and a certified technician must execute the mullion hoist replacement and associated clutch mechanism work to restore full operation to the hangar door.
The contractor is responsible for furnishing all property, materials, and equipment necessary to complete the work, with the exception of utilities which the government will provide. The government will not furnish workspace, office equipment, or support services. Performance will be evaluated against an Acceptable Quality Level standard with no major non-conformances permitted, as determined through periodic inspection by the Civil Engineering Representative. The related state and local contract opportunity indicates this work involves Assa Abloy warranty maintenance and service of the proprietary Megadoor hangar door system, suggesting the contractor must possess specialized knowledge and certification for this specific equipment manufacturer.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| AssaAbloyMegadoor Certification letter.pdf | ||
| FL ANG repair quote 1.9.2026.pdf | ||
| PUR 7776 125 Hangar Door 2026.pdf | ||
| Hangar Door Inspections SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
Hangar Door Repair
1.0 General:
1.1 Scope: The project site is located at the 125th Fighter Wing Jacksonville International Airport, Duval County, Florida. This project involves repair of Megadoor Inc. fabric hangar door systems.
1.2 Background: A previous inspection identified one mullion hoist to be inoperable due to clutch slippage on hoist system.
1.3 Period of Performance (PoP): The Period of Performance shall be one 3 days.
1.4. Place and Performance of Services: The contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 14300 Fang Drive Jacksonville, FL 32218 (Bldg 1001). The contractor shall at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
2.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:
2.1 Property: The Government will not furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.
2.2 Materials: N/A
2.3 Equipment: N/A
2.4 Services: N/A
2.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
3.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
3.1 General: Except for those items specifically stated to be Government-Furnished in Paragraph 2.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1.
4.0 Service requirements
4.1 The contractor shall furnish and install one certified mullion hoist on the Megadoor at Building 1001 Main Aircraft Hangar. A Certified technician will perform this work.
TECHNICAL EXHIBIT 1
Performance Requirements Summary (PRS)
This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).
| Performance Objective |
| Performance Standard |
| Acceptable Quality Levels (AQL) |
| Surveillance Method / By Whom |
| 4.2 Perform Mullion Hoist Replacement |
| Restore full operation to Hangar door by replacing mullion hoist and associated clutch mechanism. |
| No major non-conformance |
| Periodic Inspection / Civil Engineering Representative |