Hammer and Steel Quote-20260605~1.pdf

PDF 151 KB Posted

Attached to
EMERGENCY NOTICE - DNR Horseshoe Lake SP Pump Station Sheet Pile Material
Solicitation number
26-422DNR-REALT-B-53121
Issued by
Illinois

About this file

This is a quotation document from Hammer & Steel Global, LLC to the Illinois Department of Natural Resources for sheet piling materials needed to stabilize a causeway at Horseshoe Lake State Park in Madison County. The quote, dated June 5, 2026, is addressed to Jeff Schweizer and covers 44 pieces of PZC 18 domestic hot rolled steel sheet piling, each 40 feet in length, manufactured in accordance with ASTM A-572 grade 50 specifications and uncoated. The quotation also includes four US 90 corner connectors to facilitate assembly. Material delivery is scheduled for four business days from order placement, with shipment to Wood River, Illinois on two flatbed trucks, plus one transfer truck for the connectors.

The total quotation, excluding sales tax and delivered F.O.B. Wood River, Illinois, is $109,139.20, comprised of $93,139.20 for the sheet piling at $1.05 per pound, $13,600.00 for corner connectors at $85.00 each, and $2,400.00 in freight charges. Payment is required prior to shipment, and Hammer & Steel notes that pricing cannot be held firm due to market instability and is only valid at the time of shipment. The quotation is subject to material availability and prior sale, with standard terms and conditions from Hammer & Steel Global, LLC incorporated by reference.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hammer & Steel Global, LLC

11916 Missouri Bottom Road QUOTATION

Hazelwood, MO 63042

(314)895-4600 REF: PZC 18 sheet piling

(314)895-4070 (FAX)

To: Illinois Dept of Natural Resources Date: 6/5/2026

Attn: Jeff Schweizer

We are pleased to quote on the following materials for your consideration:

Weight

Item Description Pieces Lgth Wt/LF LBS Price/LB Extension

New PZC 18 Domestic Hot 44 40.0 50.40 88,704 $1.05 $93,139.20

Rolled Steel Sheet Piling

Rolled in accordance with ASTM

A-572 gr 50 specifications, uncoated. In singles with handling holes

US 90 Corner Connectors 4 40 $85.00 $13,600.00

Delivery Freight 2 Truck loads $950.00 $1,900.00

Two flat bed loads, plus one truck 1 Transfer load $500.00 $500.00 to transfer the connectors to

Wood River, IL Subtotal Not including sales tax $109,139.20

F.O.B. Wood River, IL

Del: from stock, subject to prior sale - 4 business days to prepare the material for shipment

Terms: Payment prior to shipment

Sales tax is not included.

Hammer & Steel's standard terms and conditions are included as a part of this quotation.

Various factors are causing steel prices to be unstable, therefore prices cannot be held firm for a specific time period. Pricing in effect at time of shipment.

Hammer & Steel Global, LLC

Tim Dittmeier (314) 895-4600

File details come from the government source that posted it. Updated .