About this file
This document is an Attachment 5 - Contractor Requirements Submission Matrix related to a federal contract opportunity for 11M RIB Engine Maintenance. The key details are:
The contract requires the ability to complete up to eight individual or combined work packages within a 5-week period, including open and inspect, overhaul, dynamometer testing, 24M maintenance, and 24M-1 maintenance on Caterpillar 3126 Marine Diesel Engines. The contractor must have Caterpillar OEM service technicians, facilities within 30 miles of Naval Amphibious Base Coronado, CA, and adequate facilities and equipment to complete quality repairs, maintenance, and preservation. The related federal contract opportunity is Solicitation Number H9924024Q0008 for 11M RIB Engine Maintenance, issued by the United States Special Operations Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Att 1-PWS.pdf | ||
| Att 4- Wage Determination.pdf | ||
| Att 2- IDIQ Pricing Worksheet (ELIN).xlsx | XLSX spreadsheet | |
| Att 3- QA SURVEILLANCE PLAN.docx | DOCX document | |
| H9224024Q0008 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Attachment 5 - Contactor Requirements Submission Matrix | ||
| PWS Ref. | PWS Requirement | INSTRUCTIONS: Quoters shall provide the certifications or other information as part of its Technical Volume to demonstrate how its proposed approach meets the below requirements. In each line below, provide a brief statement of how the proposed approach meets the requirements and identify where the supporting information is contained in your Technical Volume. |
| 4.7 | Quantity Requirement - Facilities, equipment, and personnel required to complete the required quantity of engines in the prescribed time limit (PWS 4.7: Contractor shall be able to complete up to eight (8) individual or combined Work Packages in a five (5) week period...). | |
| 4.8 | Task Accomplishment - Facilities, equipment, and personnel required to complete the individual work in the time frames allotted (PWS 4.7: Open and Inspect (Work Package 0001) - 1 week, Overhaul (Work Package 0002) – 4 weeks, Dynamometer (Work Package 0003) - 1 week, 24 M Maintenance (Work Package 0004) - 2 weeks, 24 M-1 Maintenance (Work Package 0005) – 2 weeks). | |
| 4.9 | Qualifications - Caterpillar Original Equipment Manufacturer (OEM) Service Technicians to complete the required quantity of work (PWS 4.8). | |
| 4.7 | Location - Contractor facility where work (repairs and testing) to be accomplished must be within 30 miles of Naval Amphibious Base (NAB) Coronado, CA. (PWS 4.6). | |
| 4.7 | Facilities - Facilities must be adequate to complete quality repairs, maintenance, and preservation, as specified in the PWS. | |
| 4.7 | Equipment - Equipment of sufficient quality to complete all required testing (such as dyno testing, measurements, etc.), repairs, maintenance, and preservation (media blasters, paint booths & application equipment) to produce a high quality (mechanically and aesthetically) end product. |