Exhibit A- CDRLs.pdf
PDF 1 MB Posted
- Attached to
- OPEN MISSION SYSTEM ARCHITECTURE AND COMMAND AND CONTROL SYSTEMS Federal contract opportunity
- Solicitation number
- H9240823R0001_OMSA_C2_PreSolicitation
- Issued by
- United States Special Operations Command
About this file
This notice serves as a presolicitation for an open mission system architecture and command and control system for the MQ-1C/ER unmanned aircraft. The United States Special Operations Command intends to solicit and award a single Indefinite Delivery Indefinite Quantity contract to provide an open mission system architecture and command and control solution with advanced on-aircraft compute, artificial intelligence, machine learning, and dissemination capabilities. The system must be able to command and control, collect, analyze, and share information from multiple special operations aviation and ground platforms in an expeditionary form factor via man-portable Tactical Common Datalinks. To be eligible, an offeror's solution must present a flexible, stand-alone, aircraft agnostic open mission system architecture and command and control system capable of being ported to the MQ-1C/ER. The system should demonstrate capabilities including aided target detection and recognition, an open-standards-based middleware infrastructure, and support for assured positioning, navigation, and timing onboard an MQ-1C/ER. A request for proposal will be available electronically in late 2022, with contract award anticipated for late February 2022. The contract will be an indefinite delivery indefinite quantity contract with a five-year ordering period and optional periods at the task order level.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 4 Functional Req. Perf. Spec.pdf | ||
| Atch 1- OMSA C2 IDIQ PWS.pdf | ||
| Atch 8 Order ICW Template.xlsx | XLSX spreadsheet | |
| Atch 6- Initial Order Pricing.xlsx | XLSX spreadsheet | |
| Exhibit A- CDRLs.pdf | ||
| Atch 2- DD Form 254.pdf | ||
| H9240823R0001 Draft.pdf | ||
| Atch 3- Initial Order PWS .pdf | ||
| Atch 9- IDIQ A_B Kit Pricing.xlsx | XLSX spreadsheet | |
| Atch 5- Ph 1 Go_No Go Cklst.xlsx | XLSX spreadsheet | |
| Atch 7 QnA Template.docx | DOCX document | |
| Atch 4 Functional Req. Perf. Spec.pdf | ||
| Atch 8 Order ICW Template.xlsx | XLSX spreadsheet | |
| Atch 6- Initial Order Pricing.xlsx | XLSX spreadsheet | |
| Atch 2- DD Form 254.pdf | ||
| Atch 1- OMSA C2 IDIQ PWS.pdf | ||
| Atch 7 QnA Template.docx | DOCX document | |
| Atch 5- Ph 1 Go_No Go Cklst.xlsx | XLSX spreadsheet | |
| Atch 9- IDIQ A_B Kit Pricing.xlsx | XLSX spreadsheet | |
| H9240823R0001 Draft.pdf | ||
| Atch 3- Initial Order PWS .pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
data_item: A011 title: CONFIGURATION AND DATA MANAGEMENT PLAN sub:
auth: DI-CMAN-80858 ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: ASGEN asof: N/A firstsub: ASREQ subsub: ASREQ addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Contractor's format is acceptable.
Blocks 12 and 13: The Contractor shall deliver a Configuration and Data Management Plan no less than five (5) calendar days prior to the Task Order Kick-Off Meeting/System Requirements Review Meeting.
Block 14: Plan shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: CMAN system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A002 title: STATUS REPORT sub: MONTHLY PROGRESS REPORT auth: DI-MGMT-80368A ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: MTHLY asof: N/A firstsub: 30 DAC subsub: MTHLY addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Contractor's format is acceptable.
The Contractor shall provide monthly status reports describing accomplishments from the past 30 days, issues encountered during the past 30 days, and projected accomplishments during the next 30 days. The report shall be provided in a USSOCOM and Contractor agreed upon format.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: MGMT system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A004 title: DESIGN REVIEW INFORMATION PACKAGE (DRIP) sub: CRITICAL DESIGN REVIEW auth: DI-SESS-81757A ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: BLK16 asof: BLK16 firstsub: BLK16 subsub: BLK16 addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Critical Design Review (CDR) in Contractor format consistent with DID CDR content requirements.
BLKs 10 thru 13: The Contractor shall submit a Critical Design Review Read-Ahead Briefing no less than ten (10) calendar days prior to the Critical Design Review Meeting.
BLK 14: Document shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: SESS system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A005 title: TEST PLAN sub:
auth: DI-NDTI-80566A ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: ASGEN asof: BLK16 firstsub: 30DPTT subsub: 10DPTT addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Blocks 11, 12, 13: The Contractor shall submit a draft Developmental Test Plan for Performance Validation for Government approval not less than thirty (30) days prior to the beginning of verification testing. The Contractor shall include as part of this test plan all tests (internal, verification, validation and demonstration, etc) required to verify and validate that the technology will be suitable for its intended use. The Contractor shall document the test results in a Developmental Test Report for Performance Validation (CDRL A006).
The draft Developmental Test Plan for Performance Validation shall also include tests to measure system performance against the Specific Objectives specified in the Statement of Objectives. The Contractor shall detail any conclusions regarding technology maturity and applicability identified during testing.
The Government requires ten (10) calendar days to review the draft Developmental Test Plan for Performance Validation and provide comments. The Contractor shall submit the final Developmental Test Plan for Performance Validation including and resolving all Government comments not less than ten (10) calendar days prior to the first test.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file). A presentable version (MSPowerpoint) of the test plan shall also be provided to concisely summarize the test plan. Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: NDTI system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A001 title: PRESENTATION MATERIAL sub: KICK-OFF MEETING/SYSTEM REQUIREMENTS REVIEW READ-AHEAD auth: DI-ADMN-81373 ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: ASGEN asof: N/A firstsub: ASREQ subsub: ASREQ addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Contractor's format is acceptable.
Blocks 11, 12: The Contractor shall submit an IDIQ Kick-Off Meeting/Systems Requirements Review Read-Ahead Briefing no less than five (5) calendar days prior to the Phase II Kick-Off Meeting/System Requirements Review Meeting. The Contractor shall provide a meeting agenda, any applicable documents to be reviewed, and highlight any key issues that are to be discussed.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: ADMIN system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A003 title: FUNDS AND EXPENDITURE REPORT sub: MONTHLY FINANCIAL REPORT auth: DI-FNCL-80331A ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: MTHLY asof: N/A firstsub: 30 DAC subsub: MTHLY addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: USSOCOM and Contractor's agreed upon format is acceptable.
The Contractor shall provide financial reporting in a USSOCOM and Contractor agreed upon format to ensure contract costs are within negotiated parameters on a monthly basis.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: FNCL system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A006 title: TEST REPORT sub:
auth: DI-NDTI-80809B ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: ASGEN asof: BLK16 firstsub: 30DATC subsub: N/A addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks: Contractor's format is acceptable.
Blocks 11, 12: The Contractor shall submit a Developmental Test Report For Performance Validation documenting the results of all tests and demonstrations required by the Government approved Developmental Test Plan for Performance Validation not later than thirty (30) calendar days after the last planned test or demonstration event is satisfactorily completed. This report shall reflect how the capability met, or failed to meet, thresholds and objectives laid out in the Statement of Objectives.
Block 14: Document shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: NDTI system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A007 title: TECHNICAL REPORT - Study/Services sub:
auth: DI-MISC-80508B ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: ONE/R asof: BLK16 firstsub: 30DEOC subsub: 15DARC addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks:
The first page of the Final Technical Report shall state: “Distribution B: The report is authorized for distribution to U. S. Government agencies only, as it may contain proprietary information (specify date of determination). Other requests for this document shall be referred to USSOCOM, ATTN: SOF AT&L-FW, MALET Program Manager.”
The Final Technical Report shall be consistent with best commercial practices.
Contractor's format is acceptable. The Final Technical Report shall capture all technical progress accomplished during the contract period of performance and shall synopsize all management and financial results.
The Government has 15 days after receipt to request changes, and the Contractor shall submit a revised report within 15 days of receipt of the Government request. The finished Final Technical Report is due on the last day of the contract period of performance.
The Final Technical Report, including appropriately marked proprietary data shall be submitted via CD/DVD to SOF AT&L-FW, MALET Program Manager.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: MISC system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the conformance with Government requirements, and the required to perform additional work to conform to Government without conforming to Government requirements, and the contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any data_item: A008 title: Technical Data Package sub:
auth: DI-SESS-80776 ref:
req_ofc: SOF AT&L - FW dd250: DD appcode: A dist: D freq: BLK16 asof: BLK16 firstsub: BLK16 subsub: BLK16 addressee1: See Distro List draft1:
reg1: 4 repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0 total_reg: 4 total_repro: 0 remarks:
Contractor Format that meets the intent of the DI-SESS- 80776 is proved.
Specific requirements will be identified in Task Orders to include the following to support acquisition, production, inspection, engineering, and logistics requirements to include:
- Software/Hardware baseline release documentation
- Model Based System Engineering (MBSE) artifacts
- Software safety/airworthiness artifacts
- Cybersecurity documentation/artifacts
- Technical manual, training, installation, and schematics
BLKs 10 thru 13: The Contractor shall submit all baseline release supporting documentation and artifacts identified in the Task Orders no later than 30 days prior to airworthiness approval submission date.
BLK 14: Documents shall be in electronic format (MS Word or Adobe PDF file). Document shall be transmitted via e-mail.
Hard copies will not be accepted.
The Government retains approval rights.
group:
total_price:
prep_name:
line_item: CLIN XXXX exhibit:
xtdp: Off xtm: Off othercat: SESS system: MALET OPEN MISSION SYSTEM ctr_no:
contr:
remarksb:
Page2:
Reset:
prep_date:
app_by:
app_date:
Page:
of_pages:
app: Adobe Professional 8.0
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the number, or military standard number listed in DoD 5010.1
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .