Att 3- Quality Assurance Surveillance Plan -11M RIB.pdf
PDF 325 KB Posted
- Solicitation number
- H9224024R0002
- Issued by
-
United States Special Operations Command
About this file
This document outlines a Quality Assurance Surveillance Plan (QASP) for a service support contract to maintain and repair 11 Meter Rigid Inflatable Boats for the United States Special Operations Command. The contractor will be responsible for completing low-level work packages within 60 days of receipt and medium-to-high level work packages and Overhaul and Alteration Work Requests within 90 days. The contractor must also be able to service up to eight boats simultaneously while meeting deadlines and producing error-free work using only original equipment manufacturer parts. Performance will be evaluated against standards for timeliness, quality, and customer service through methods such as direct observation, inspections, management reports, and user surveys. The contractor must submit monthly status reports and other deliverables according to the schedule defined in the QASP. Contract performance will be assessed using a Contractor Performance Assessment Reporting System.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 0002.pdf | ||
| RFP Questions and Answers.pdf | ||
| Att 5- Past Performance Questionnaire.docx | DOCX document | |
| SF 30 Amendment 0001.pdf | ||
| Att 4- Past Performance Information Sheet.docx | DOCX document | |
| Att 7- Wage Determination 2015-5635 Rev 22.pdf | ||
| Att 6 - Q and A.docx | DOCX document | |
| Att 2 - ELINS Worksheet.xlsx | XLSX spreadsheet | |
| Att 1 Performance Work Statement Amendment 0001.pdf | ||
| Att 1a- Addendum to PWS- Work Packages.rtf | RTF text file | |
| Solicitation H9224024R0002 v1.pdf | ||
| Att 6- Past Performance Questionnaire.docx | DOCX document | |
| Att 3 - DD 254.pdf | ||
| Att 8- Wage Determination 2015-5635 Rev 22.pdf | ||
| Att 4- Quality Assurance Surveillance Plan -11M RIB.pdf | ||
| Att 7 - Q and A.docx | DOCX document | |
| Att 5- Past Performance Information Sheet.docx | DOCX document | |
| Att 1- Performance Work Statement 11M RIB Repair and Upgrade.pdf | ||
| Att 2 - ELINS Worksheet.xlsx | XLSX spreadsheet | |
| Att 1a- Addendum to PWS- Work Packages.rtf | RTF text file |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN
For:
Solicitation Number:
Contract Number:
Contract Description:
Contractor’s name:
Naval Special Warfare Command
H92240-23-D-000X
TBD
This is a service support contract to support 11 Meter Rigid
Inflatable Boat Repair, Maintenance and Upgrades
TBD
1.0 PURPOSE.
1.1. This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This plan provides a basis for the Government to evaluate the quality of contractor performance. The oversight provided for in the contract and in this plan will ensure service levels reach and maintain the required levels throughout the contract term.
This plan will provide the Government with a proactive way to avoid unacceptable or deficient performance, and provide verifiable input for required annual past performance evaluations.
This QASP explains the following:
1.1.1. What will be monitored
1.1.2. How monitoring will take place
1.1.3. Who will conduct the monitoring
1.1.4. How monitoring efforts and results will be documented
1.2 This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.
1.3 This QASP is a “living document” and the Government may review and revise it on a regular basis. The Government retains all rights to determine its methods of quality assurance surveillance, however the Government may choose to coordinate changes with the contractor and provide the Contractor information copies of the QASP. Updates will ensure that the QASP remains a valid, useful, and enforceable document. Copies of the original QASP and revisions will be retained the contract file.
2.0 GOVERNMENT ROLES AND RESPONSIBILITIES.
2.1 The following personnel will oversee and coordinate surveillance activities.
2.1.1 Contracting Officer (KO) - The KO will ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and will safeguard the interests of the United States in the contractual relationship. The KO will also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The KO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.
Assigned KO: WCM-CONTRACTS@SOCOM.MIL
Organization or Agency: NAVAL SPECIAL WARFARE COMMAND (NSWC) – N01C
2.1.2 Contracting Officer’s Representative (COR) –The COR is responsible for the technical administration of the contract, assuring proper Government surveillance of the contractor’s performance and keeping a quality assurance file. At the conclusion of the contract or when requested by the KO, the COR will provide documentation to the KO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the
Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the KO for action.
Assigned COR: SAMUEL.BROWN@SOCOM.MIL
Other Key Government Personnel – DANIEL.BUSS@SOCOM.MIL
2.1.3 Technical Representative(s) (TRs) – The requiring activity representative who may be assigned to provide technical/administrative assistance to the COR. TRs may be assigned to assist and support the COR with contractor surveillance but have limited authority to provide any technical direction or clarification directly to the contractor.
3.0 CONTRACTOR REPRESENTATIVES:
3.1 Contractor shall appoint an employee to serve as the primary point of contact responsible for coordinating issues relating to quality assurance and surveillance issues.
Program Manager – TBD
Other Contractor Personnel – TBD
4.0 PERFORMANCE REQUIREMENTS SUMMARY (PRS).
4.1 Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets, or does not meet these standards.
4.2 The Performance Requirements Summary Matrix includes performance standards outlined in the Performance Work Statement. The Government shall use these standards to determine contractor performance and shall compare contractor performance to the Acceptable Quality
Level (AQL):
Performance Objective Performance
Standard
Acceptable
Quality Level
(AQL)
Method of
Surveillance
Incentive mailto:WCM-CONTRACTS@SOCOM.MIL mailto:SAMUEL.BROWN@SOCOM.MIL mailto:DANIEL.BUSS@SOCOM.MIL
PRS #1. Completion of
LOW LEVEL Work
Packages and ECPs /
NECPs
No Later Than
(NLT) 60 calendar days after receipt of order (ARO)
Timely 95% of the time
Direct
Observation;
Review of
Monthly Status
Report (MSR)
Positive/Negative reporting in the Contractor
Performance Assessment
Reporting System (CPARS)
PRS #2. Completion of
MEDIUM / HIGH
LEVEL Work Packages and OAWRs
NLT 90 calendar days ARO
Timely 95% of the time
Direct
Observation;
Review of MSR
Positive/Negative reporting in the CPARS
PRS #3. Servicing up to eight (8) 11M RIBs and their associated systems and equipment simultaneously
Adherence to established work completion deadlines
Timely 95% of the time
Direct
Observation;
Review of MSR
Positive/Negative reporting in the CPARS
PRS #4. Error-free work Government
Inspection reveals no unacceptable service requiring rework
Fully acceptable
95% of the time
100% Inspection Positive/Negative reporting in the CPARS. The
Government may deny the
Contractor payment equal to the value of the unperformed or poorly performed services or require Contractor re-work at no additional cost.
PRS #5. Quality parts and materials
Only new, original equipment manufacturer
(OEM)
recommended parts and materials are used
100% of the time
100%
Inspection;
Review of
Inspection
Summary Report
(ISR)
Positive/Negative reporting in the CPARS. The
Government may deny the
Contractor payment equal to the value of the substandard parts and materials or require Contractor re-work at no additional cost.
PRS #6. Customer
Service
Contractor demonstrates reasonable and cooperative behavior, a commitment to customer satisfaction, and a concern for the interest of the
Government customers
No more than
2 valid complaints per year for failure to demonstrate reasonable, cooperative, or professional behavior
Direct
Observation;
User Survey
Positive/Negative reporting in the CPARS
4.3 The Government shall use a reduction in payments as a negative incentive. Incentives shall be based on exceeding, meeting, or not meeting performance standards.
4.4 Various methods exist to monitor performance. The COR may use one or more of the surveillance methods listed below in the administration of this QASP, and is not limited to these methods.
4.4.1. DIRECT OBSERVATION. (May be performed periodically or through 100% surveillance).
4.4.2. 100% INSPECTION. (Evaluates all outputs. Most applicable to small quantity, but highly important services. May be used where there are written deliverables and stringent requirements such as tasks required by law, safety, or security.)
4.2.3. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis.) Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.
4.4.4. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.
4.4.5. USER SURVEY. (Combines elements of validated user complaints and random sampling.
Random survey is conducted to solicit user satisfaction. Appropriate for high quantity activities that have historically been satisfactory. May also generate periodic and 100% inspections.)
4.4.6. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the user of the service to identify deficiencies. Complaints are then investigated and validated. Highly applicable to services provided in quantity and where quality is highly subjective.)
4.4.7. MANAGEMENT REPORTS. (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)
5.0 CONTRACT DELIVERABLES.
5.1 The Contractor shall provide all of the following documents during the course of the contract at the frequency noted in the table below:
Description Num ber
PWS
Ref.
Delivery Date
Inspection Summary Report
(ISR)
0001 4.6 Upon Government Inspection; within two (2) calendar days of Task Order completion
Monthly Status Report
(MSR)
0002 4.7 5th calendar day of every month, for work performed in the preceding month
Post Award Conference
Minutes
0003 4.8 5 calendar days after Post Award
Conference
Description Num ber
PWS
Ref.
Delivery Date
Contractor Manpower
Reporting
0004 6.0 Annually NLT 31 October and at contract completion
6.0. RATINGS.
6.1 Contractor performance will be rated using the Contractor Performance Assessment Report
(CPAR). Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. The rating scale below will be used to determine a positive, neutral, or negative outcome.
Rating Contract
Requirements
Problems Corrective Actions
Exceptional Exceeds Many – with
Government Benefit
Few Minor
Problems
Minor Problems; Highly
Effective
Very Good Exceeds Some – with
Government Benefit
Some Minor
Problems
Minor Problems; Effective
Satisfactory Meets All Minor Problems and Major
Major Problems w/Corrective
Action
Marginal Does Not Meet Some
Government Impact
Serious; Recovery
Possible
Marginally Effective; Not Fully
Implemented
Unsatisfactory Does Not Meet Most
Government Impact
Serious; Recovery
Not likely
Multiple Significant Problems;
Ineffective
7.0 DOCUMENTING PERFORMANCE.
7.1. Acceptable Performance. The Government will document positive performance. The most common format used for this action will be via CPARs. Any report may become a part of the supporting documentation for fixed fee payments, award fee payments, or other actions.
7.2 Unacceptable Performance. When unacceptable performance occurs, the COR will inform the contractor. This will normally be in writing unless circumstances necessitate verbal communication. In any case the COR will document the discussion and place it in the COR file.
7.2.1. When the COR determines formal written communication is required, the COR will prepare a Contract Discrepancy Report (CDR), and present it to the contractor's manager or on-site representative. A CDR template is attached to this QASP.
7.2.2. The contractor shall be required to acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present this corrective action plan to the
COR. The Government will review the contractor's corrective action plan to determine acceptability.
7.2.3 Any CDR will become a part of the supporting documentation for contract payment deductions, fixed fee deductions, award fee nonpayment when applicable. The Government will use any completed CDR as part of an overall evaluation of Contractor performance when determining present or future contractual actions.
8.0 FREQUENCY OF MEASUREMENT.
8.1. During contract/order performance, the COR will take periodic measurements and analyze whether the negotiated frequency of measurement is appropriate for the work being performed.
8.2. The COR will interact with the contractor at least monthly and meet annually to assess performance and will provide a written assessment.
Signature – Contractor Program Manager
Signature – Contracting Officer’s Representative
Signature – Contracting Officer
PERFORMANCE REPORT
1. CONTRACT NUMBER: <insert number>
2. Prepared by: (Name of COR) <insert name>
3. Date and time of observation:
4. Observation:
<Examples of items to include in a report are:
- Method of surveillance.
- How frequently you conducted surveillance.
- Surveillance results.
- Number of observations.>
Prepared by: <Enter COR’s name>
Signature – Contracting Officer’s Representative Date
CONTRACT DISCREPANCY REPORT (CDR)
1. Contract Number: <insert number>
2. TO: (Contractor’s Manager or on-site representative) <insert name>
3. FROM: (Name of COR) <insert name>
4. Date and time observed discrepancy:
5. DISCREPANCY OR PROBLEM:
<Describe in detail. Identify any attachments.>
5. Corrective action plan:
A written corrective action plan < is / is not > required.
< If a written corrective action plan is required include the following. > The written Corrective
Action Plan will be provided to the undersigned not later than < # days after receipt of this
CDR. >
Prepared by: <Enter COR’s name>
Signature – Contracting Officer’s Representative Date
Received by:
Signature – Contractor’s Manager or on-site representative Date