Technical_Exhibit_Attachments.doc

DOC document 46 KB Posted

Attached to
NSW 11 Meter Rigid Inflatable Boat (RIB) Caterpillar Engine Services
Solicitation number
H92240-15-T-0125
Issued by

About this file

PWS Technical Exhibits

View the file

Other files

File Type Posted
H92240-15-T-0125.doc DOC document
Attachment_IV_-_Wage_Determination.docx DOCX document
Attachment_II_-_ELIN_Structure.xlsx XLSX spreadsheet
Attachment_III_-_QASP_ _Matrix_-_final.doc DOC document
Attachment_I_-_PWS_final.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to the required services of the Performance Work Statement (PWS). The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective

Standard
Performance Threshold
Method of Surveillance

PRS # 1.

The contractor shall complete up to four (4) individual or combined Work Packages in a five week period.

PWS 4.0

Contractor will be in violation of performance standard if unable to complete required work in required time frame. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

PRS # 2

Contractor shall complete individual Work Packages in allotted time frames as specified in the PWS.

PWS 4.0
Contractor will be in violation of performance standard if unable to complete required work in required time frame. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

PRS # 3

Contractor shall provide required hard copy and electronic reports, with specified information on parts used, clearances, dynamometer results, etc.

PWS 4.1
Contractor will be in violation of performance standard if required reports are not received on more than 5% of work completed within three business days. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

PRS # 4

Contractor shall provide all required information with regard to parts used, inspections completed, dimensions found or obtained, dynamometer results, etc., in hard copy and electronic reports provided to customer.

PWS 4.1
Contractor will be in violation of performance standard if required reports do not provide all required data more on than 5% of work completed. Upon notice of a validated violation, Contractor shall immediately correct or establish acceptable corrective action plans within five working days.
Validated Customer Complaint received by COR.

TECHNICAL EXHIBIT 2

DELIVERABLES SCHEDULE

Deliverable
Frequency
# of Copies
Medium/Format
Submit To
Hard copy of inspection and test records and reports of all work completed including parts replaced, inspections completed (with results), test results, etc., as specified in PWS section 4.1.
At delivery / turnover of engine to the customer.

One copy

Hard copy enclosed in a protective plastic sleeve. Sleeve must be attached to engine using a method that is easily removed, but will not become accidentally detached.

Hard copy will be attached to engine.

Electronic copy of inspection and test records and reports of all work completed including parts replaced, inspections completed (with results), test results, etc., as specified in PWS section 4.1.
Electronic copy will be sent within three business days of delivery / turnover of engine to customer.
One electronic copy will be forward to multiple email addresses.
Electronic copy will be in PDF format.
COR and the NSWG-4 Diesel Engine Inspectors (DEI). COR will provide current DEI email addresses.

TECHNICAL EXHIBIT 3

ESTIMATED WORKLOAD DATA

Note that listed workload estimates apply only to Work Package 6, Material Services. All other Work Packages are Firm Fixed Price for labor and material requirements combined.

Gulf Coast Contract (SBT-22)

ITEM
NAME
ESTIMATED QUANTITY
1
Supervisor
Hours
20
2
Caterpillar Certified Diesel Engine Mechanic
Hours
200
3
Laborer
Hours
200

File details come from the government source that posted it. Updated .