Q A 23FEB2012.pdf
PDF 39 KB Posted
- Attached to
- RFP - SOFTACS Family of Terminals (FoT)
- Solicitation number
- H92222-11-R-0036
- Issued by
-
United States Special Operations Command
About this file
Questions Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach 2 TEP Rev3.xls | XLS spreadsheet | |
| Q A 6Mar2012.pdf | ||
| DRAFT DD254 SDN-FoT.pdf | ||
| FoT_SOW_23FEB2012.pdf | ||
| Attach 2 TEP Rev2.xls | XLS spreadsheet | |
| CDRLs SDN-FoT 13Feb12.pdf | ||
| H92222-11-R-0036-Final.pdf | ||
| FoT_SOW_9FEB2012.pdf | ||
| TEP 13Feb2012.pdf | ||
| DRAFT CDRLs SDN-FoT.pdf | ||
| Attach 2 TEP.xls | XLS spreadsheet | |
| DRAFT SOLICITATION.pdf | ||
| FoT_SOW_ 10 Jun.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q.(1) The Attachment (2) Price Evaluation sheet has been provided in PDF format. Could you please provide an executable copy in Excel format?
A. Yes. Excel format TEP is posted to FBO.
Q.(2) Can the Government please clarify if the Terminal Control Processor (TCP) will be supplied as GFE, or is the contractor required to supply this TCP with each terminal. Section 4.2.3 refers to a contractor provided handheld or laptop, while section 5.5.4 refers to a Government provided laptop.
A. The Statement of Work has been modified to correct the discrepancy. See the 23 Feb 2012 Statement of Work.
Q.(3) Can the government please clarify the non-warranty repair turn-around requirements. Section 5.5.6 states that turn-around time for replacement of all items shall not exceed 30 days, yet the following paragraph states the contractor shall repair or replace any LRU within 15 days after receipt of a failed LRU.
A. The Statement of Work has been modified to correct the discrepancy. See the 23 Feb 2012 Statement of Work.
File details come from the government source that posted it. Updated .