About this file

Exhibit A CDRL List

View the file

Other files

File Type Posted
Attachment_20_TACLAN_TEP_Matrix_Final 21 Jun .xls XLS spreadsheet
Attachment 7 C-LAN.pdf PDF
Amendment 6.pdf PDF
Attachments 7 8 9 19 21.xlsx XLSX spreadsheet
Attachment_20_TACLAN_TEP_Matrix Final.xls XLS spreadsheet
Amendment 5.pdf PDF
Final RFPH92222-11-R-0010 Questions2.pdf PDF
Attachment_20_TACLAN_TEP_Matrix Final.xls XLS spreadsheet
Attachment 12 TACLAN SOW Final.pdf PDF
Attachment 16 TACLAN_Performance_Measurement__Oct 4 10_ v7x.pdf PDF
Attachment_20_TACLAN_TEP_Matrix Final.xls XLS spreadsheet
Amendment 4.pdf PDF
Attachment 17 TACLAN Labor Categories.pdf PDF
Attachment 10 ROIP.pdf PDF
Amendment 3.pdf PDF
Attachment 13 TSSx.pdf PDF
Attachment 11 Legacy Suites.pdf PDF
Final RFPH92222-11-R-0010 Questions.pdf PDF
Final RFPH92222-11-R-0010 Questions.pdf PDF
Attachment 10 ROIP 23 May 2011.pdf PDF
Amendment 0002.pdf PDF
Attachment 7 CLAN 23 May 2011.pdf PDF
Attachment 8 FMV 23 May 2011.pdf PDF
Attachment 19 Full Suite C2 Suite NIPR SIPR JWICS 23 May 2011.pdf PDF
Attachment 9 MPK 23 May 2011.pdf PDF
Amendment 0001.pdf PDF
Attachment 21 FCD 23 May 2011x.pdf PDF
TACLAN Brand Name J A.pdf PDF
Exhibit A TACLAN CDRL LIST.pdf PDF
Attachment 17 Labor Categories.pdf PDF
Attachment 14 TACLAN DD 254.pdf PDF
Attachment 16 TACLAN_Performance_Measurement.pdf PDF
Attachment 15 - Exit Plan Elements.pdf PDF
Attachment 18 GFE.pdf PDF
Attachment 6 v10 1 SPS.pdf PDF
Attachment 2 v10.1_O M_Manual.pdf PDF
Attachment 19 v10.1 Full Suite Hardware 12 Apr 2011.pdf PDF
Attachment 1 v10 1 VDD.pdf PDF
Attachment 3 v10 1 Install Manual.pdf PDF
Attachment 5 SRS v10.1.pdf PDF
Attachment 12 TACLAN SOW Final.pdf PDF
Attachment 20 TACLAN_TEP_Matrix.xls XLS spreadsheet
Attachment 4 v10_1_SAG.pdf PDF
Final TACLAN RFP 5 May.pdf PDF
TACLAN PRE-SOLICITATION SIGN UPx.pdf PDF
TACLAN Pre-SolicitationDay 20110330 Finalx.pdf PDF
ECA_instructions__final_x.pdf PDF
TACLAN DRFP Questions Final —
TACLAN Draft RFP _Q and A_- for posting 17 Feb 11x.pdf PDF
Attachment 6 SPS.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (CDRL)

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0001 Technology Insertion/Refresh Recommendations

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MISC-80508B

DI-MISC-80508B

SOW Para 3.2 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED SEMIA 180 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

0 Reg Repro

16. REMARKS SORDAC/PEO-C4 0 1 0

Block 4: Contractor format is acceptable

Block 14: Distribution shall be accomplished electronically using Microsoft Office file formats.

15. TOTAL ▬▬▬▬►

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

JOHNNIE E. MIZE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0002 System/Equipment Information Listing

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16

DI-MISC-80508B

SOW Para 3.4 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED MTHLY 60 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

0 NLT the 10th of the month Reg Repro

16. REMARKS SORDAC/PEO-C4 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0003 Trip Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 4.7; 10.14 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 10 days after trip.

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. As applicable, the trip report shall contain : Purpose, dates of travel, locations, unit visited & POC(s), recap of events, significant findings, lessoned learned, and recommendations

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0004 System Engineering Plan (SEP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16

DI-MISC-80508B

SOW Para 7.1 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ANNLY NLT 90 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Format and contents of the plan shall be IAW USD/AT&L Policy for System Engineering in DoD, dated 20 Feb 2004, and USD/AT&L System Engineering Preparation Guide, V2.01, April 2008 22 Dec 2004.

(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0005 Reports/Minutes/Agendas

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMIN-81249A (Agenda)

DI-ADMIN-81250A (Minutes) DI-ADMIN-81308A (Report)

SOW Para 7.1.1;

7.1.2;7.1.3;9.2;9.3;9.4;9.5;12.1.

2; 16

SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ See Item 16

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 12: Agendas and read ahead are required 5 business days prior to meeting; Minutes/Reports are required 5 business days after completion/conference.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0006 Engineering Change Proposal (ECP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-80639C

SOW Para 7.1.3 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

SORDAC/KI 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0007 Software Requirements Specification (SRS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPS-81433A

SOW Para 7.3 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 30 Days After PDR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 Days After BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0008 Software Product Specification (SPS)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-IPSC-81441A

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 60 days after Approval of SRS

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 days after BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0009 Version Description Document (VDD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

See Block 16

SOW Para 7.3; 8.5 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 15 Days After CBR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 Days After BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. Report shall detail all software, and list hardware baseline configuration.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0010 Software Baseline Image on USB Hard Drive

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 15 days after BAT

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

Reg Repro

16. REMARKS SORDAC/PEO-C4 1

Block 4: The Contractor shall deliver the approved software baseline image and all supporting documentation on a single ruggedized USB hard drive. All documentation shall be in Adobe PDF format.

Block 14: One hard drive per TACLAN system shall be shipped to appropriate unit’s POC as provided by

SORDAC/PEO-C4.

USSOCOM/J64 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0011 Integrated Logistics Support (ILS) Plan and ILS Standard Operating Procedures (SOP).

DI-ILSS-80095 (ILS Plan)

DI-MGMT-81580 (SOP)

SOW Para 8.1 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED See Block 16 90 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

Blocks 10/13: Contractor shall resubmit as required whenever ILS SOPs change but no less than annually.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0012 Failure and Maintenance Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SESS-81639 SOW Para 8.3 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED QRTLY 90 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

NLT the 10th of the month Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0013 Provisioning and Spares List

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ILSS-80134A SOW Para 8.4 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED See Block 16 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

A See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. Provisioning and Parts lists shall include hardware for both legacy and production systems as applicable.

Blocks 10/13: Contractor shall resubmit as required but at least annually.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0014 Operations and Maintenance (O&M) Manual

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 8.5 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 90 days after CBR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 days after BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. The contractor shall deliver an integrated systems manual with unlimited reproduction rights that provides a road map through the COTS/GOTS O&M manuals. The systems manual shall reflect the TACLAN configuration delivered under this contract. The O&M manual shall include: diagrams, equipment technical data, equipment setup and installation procedures, detailed menu field definitions, warnings and precautions, all authorized operator level tasks/procedures, principles of operation, all authorized organizational level testing, fault isolation and troubleshooting, support/test equipment, and removal/replacement procedures, warranty handling instructions, and a repair parts and special tools list if required. The O&M manual shall include actual photos showing step by step assembly.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0015 Installation Guide

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 8.5 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 90 days after CBR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 days after BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. The contractor shall deliver an integrated software installation guide with unlimited reproduction rights that provides instructions for accomplishing the software build for each TACLAN segment and/or system. The systems guide shall reflect the TACLAN configuration delivered under this contract. The installation guide shall include: diagrams, technical data, setup and installation procedures, detailed menu field definitions, warnings and precautions, all authorized operator level tasks/procedures, and troubleshooting. The installation guide shall include screen shots showing step by step installation procedures.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0016 System Administrator Guide (SAG)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 8.5 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 90 days after CBR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 15 days after BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. The contractor shall deliver a System Administrator Guide with unlimited reproduction rights that provides advanced configuration information and instructions for use by TACLAN System Administrators (SA). The SAG shall include answers to Frequently Asked Questions (FAQ). The SAG shall reflect the TACLAN configuration delivered under this contract. The SAG shall include: diagrams, technical data, procedures, detailed menu field definitions, warnings and precautions, advanced SA-level tasks/procedures, and troubleshooting steps. The SAG shall include screen shots showing step by step configuration procedures.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0017 Program Management Plan (PMP)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80004A SOW Para 7.1.1; 9.0 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED See Block 16 NLT 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

Block 10: Updated as required but no less than annually.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0018 Monthly Funds Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 9.1 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED MTHLY NLT 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

NLT the 10th of the month Reg Repro

16. REMARKS SORDAC/PEO-C4 1

Block 4: Contractor format is acceptable. The Monthly Funds Status Report (MFSR) shall contain up-to-date cost and accounting information, by CLIN and sub-CLIN, for all open contract delivery orders which are not Firm Fixed Price (FFP). The MFSR is meant to provide information to the TACLAN Program Manager regarding: (a) updating and forecasting funding requirements, (b) planning and decision making on funding changes to delivery orders, and (c) determining funds in excess of delivery order requirements and available for de-obligation.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0019 Safety Assessment Report (SAR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-SAFT-80102B SOW Para 9.6 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 30 days prior to BAT

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0020 TACLAN Design Specification

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-IPSC-81432A SOW Para 10.4 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ At Critical Build Review

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 NLT 30 days after BAT Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

USSOCOM/J64 1

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0021 Asset Tracking & Management

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 10.6 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ See Block 16

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1

Block 4: Contractor format is acceptable. The Government will provide legacy asset information.

Block 12: Asset management system will be available for the Government to view on NIPR or SIPR networks NLT 60 days after receipt of Government provided legacy asset information.

Block 13: The Contractor shall maintain and continuously update the asset management system throughout the Contract period of performance.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0022 Software License/Maintenance Data Repository

See Block 16 SOW Para 10.7 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ See Block 16

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1

Block 4: The TACLAN Contractor shall initially record and subsequently update a software license/maintenance data repository provided by USSOCOM. The Government will provide legacy license/maintenance information.

Block 12: The software license/maintenance information shall be entered into the Government provided database NLT 60 days after receipt of Government provided the legacy information.

Block 13: The Contractor shall maintain and continuously update the asset management system throughout the Contract period of performance.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0023 Configuration Management (CM)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 10.8 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ See Block 16

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1

Block 4: The TACLAN Contractor shall use USSOCOM’s configuration management system to record, track, monitor, and update all TACLAN component configurations and all subsequent component configuration changes and coordinate all changes with the Distributed Computing Contractor.

Block 12: The CM information for new production systems and equipment shall be entered into USSOCOM’s CM system NLT 15 days after CDR.

Block 13: The Contractor shall maintain and continuously update all CM information throughout the Contract period of performance.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0024 Release Management (RM) Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

See Block 16 SOW Para 10.11 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED See Block 16 NLT 30 DAC

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable. The TACLAN Contractor shall provide a plan for complying with implementing USSOCOM-specified release management processes for integrating and testing new or reconfigured TACLAN equipment and/or software.

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10 business days after Government’s comments.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0025 Test Plans

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80566A SOW Para 10.12.2.1 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ At CBR

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS SORDAC/PEO-C4 1 1

Block 4: Contractor format is acceptable

Block 8: The Government has 15 business days to review. If disapproved, the Contractor shall resubmit 10

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ____ TM _____ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

TACLAN H92222-11-D-TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A0026 Test Reports

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-NDTI-80809B SOW Para 10.12.2.4 SORDAC/PEO-C4

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

NO REQUIRED ASREQ NLT 15 days after BAT

a. ADDRESSEE

b. COPIES

8. APP CODE

NO

11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.

Draft

Final

See Block 16 Reg Repro

16. REMARKS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .