Attachment_20_TACLAN_TEP_Matrix_Final 21 Jun .xls
XLS spreadsheet 250 KB Posted
- Solicitation number
- H92222-11-R-0010
- Issued by
-
United States Special Operations Command
About this file
Attachment 20 Total Evaluated Price (TEP) Matrix
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Evaluated Price
| Total Evaluated Price (TEP) Matrix | ||||||
| This worksheet will be used to record the total of all pricing under each tab of the TEP. | ||||||
| Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | Total | |
| Initial Production Set Price: | $ - 0 | $ - 0 | ||||
| TACLAN Full Suites (including Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TACLAN Full Suites (excluding Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TACLAN C2 Suites (including Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| TACLAN C2 Suites (excluding Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| NIPR Segment (including Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| NIPR Segment (excluding Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SIPR Segment Price(including Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| SIPR Segment Price(excluding Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JWICS Segment Price (including Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| JWICS Segment Price(excluding Laptops): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Laptops Price CF-52 2 GB: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Laptops Price CF-52 4 GB: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Laptops Price CF-52 8 GB: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CF-52 250 GB Hard Drive: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Laptops Price CF-19: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| CF-19 160 GB Hard Drive: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Computing Device Price (Semi-Ruggedized): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Field Computing Device Price (Ruggedized): | ||||||
| Mission Planning Kits Price: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Coalition Local Area Network Price: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Full Motion Video Video Distribution Hub Lite Price: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Radio Over IP Kit Price: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Baseline Upgrades Price: | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sustainment Training Price (CONUS): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Sustainment Training Price (OCONUS): | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Provisioning Price: | ||||||
| Equipment Lifecycle Support Price: | $ 625,000 | $ 625,000 | $ 625,000 | $ 625,000 | $ 625,000 | $ 3,125,000 |
| System Engineering/Studies Price: | $ 1,200,000 | $ 1,200,000 | $ 1,200,000 | $ 1,200,000 | $ 1,200,000 | $ 6,000,000 |
| Travel Price: | $ 40,000 | $ 40,000 | $ 40,000 | $ 40,000 | $ 40,000 | $ 200,000 |
| Shipping Price: | $ 40,000 | $ 40,000 | $ 40,000 | $ 40,000 | $ 40,000 | $ 200,000 |
| Total Extended Price for the entire TACLAN 5 year contract : | $ 1,905,000 | $ 1,905,000 | $ 1,905,000 | $ 1,905,000 | $ 1,905,000 | $ 9,525,000 |
| Note: This worksheet is linked to the various worksheets within this excel workbook. Offerors shall complete the detailed spreadsheets (Exhibits B thru Q, & S thru V) by entering Unit Prices and Rates. |
B - Initial Production
| H92222-11-R-0010 | Initial Production Set | CLIN 0001, Exhibit B | ||
| IPS TACLAN Full Suites with Laptops | ||||
| The contractor shall provide IPS TACLAN Full Suites with Laptops in accordance with para 3.1 the SOW and Attachments 1-6, 19. | ||||
| IPS Full Suite with Laptops | ||||
| Max Order Qty | ELIN | Unit Price | Total Extended Price | |
| 16 | B001 | $0.00 |
&CPage B-&P of B-&N
C - TACLAN Full Suites
| H92222-11-R-0010 | TACLAN Full Suites | CLIN 0001, Exhibit C | |||||||||||||||||||
| TACLAN Full Suites (including Laptops) | |||||||||||||||||||||
| The contractor shall provide TACLAN Full Suites (including Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| TACLAN Full Suites (including Laptops) | CLIN 0001 Base Year 1 | CLIN 0001 Base Year 2 | CLIN 0001 Base Year 3 | CLIN 0001 Option Year 1 | CLIN 0001 Option Year 2 | ||||||||||||||||
| Order Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | C001 | 2 | $0.00 | C005 | 2 | $0.00 | C009 | 2 | $0.00 | C00D | 2 | $0.00 | C00H | 2 | $0.00 | ||||||
| 5 - 9 | C002 | 2 | $0.00 | C006 | 2 | $0.00 | C00A | 2 | $0.00 | C00E | 2 | $0.00 | C00J | 2 | $0.00 | ||||||
| 10 - 19 | C003 | 1 | $0.00 | C007 | 1 | $0.00 | C00B | 1 | $0.00 | C00F | 1 | $0.00 | C00K | 1 | $0.00 | ||||||
| More than 19 | C004 | 1 | $0.00 | C008 | 1 | $0.00 | C00C | 1 | $0.00 | C00G | 1 | $0.00 | C00L | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| TACLAN Full Suites (excluding Laptops) | |||||||||||||||||||||
| The contractor shall provide TACLAN Full Suites (excluding Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| TACLAN Full Suites (excluding Laptops) | CLIN 0001 Base Year 1 | CLIN 0001 Base Year 2 | CLIN 0001 Base Year 3 | CLIN 0001 Option Year 1 | CLIN 0001 Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | C00M | 2 | $0.00 | C00R | 2 | $0.00 | C00V | 2 | $0.00 | C00Z | 2 | $0.00 | C013 | 2 | $0.00 | ||||||
| 5 - 9 | C00N | 2 | $0.00 | C00S | 2 | $0.00 | C00W | 2 | $0.00 | C010 | 2 | $0.00 | C014 | 2 | $0.00 | ||||||
| 10 - 19 | C00P | 1 | $0.00 | C00T | 1 | $0.00 | C00X | 1 | $0.00 | C011 | 1 | $0.00 | C015 | 1 | $0.00 | ||||||
| More than 19 | C00Q | 1 | $0.00 | C00U | 1 | $0.00 | C00Y | 1 | $0.00 | C012 | 1 | $0.00 | C016 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage C-&P of C-&N
D - TACLAN C2 Suites
| H92222-11-R-0010 | TACLAN C2 Suites | CLIN 0001, Exhibit D | |||||||||||||||||||
| TACLAN C2 Suites (including Laptops) | |||||||||||||||||||||
| The contractor shall provide TACLAN C2 Suites (including Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| TACLAN C2 Suites (including Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | D001 | 2 | $0.00 | D005 | 2 | $0.00 | D009 | 2 | $0.00 | D00D | 2 | $0.00 | D00H | 2 | $0.00 | ||||||
| 5 - 9 | D002 | 2 | $0.00 | D006 | 2 | $0.00 | D00A | 2 | $0.00 | D00E | 2 | $0.00 | D00J | 2 | $0.00 | ||||||
| 10 - 19 | D003 | 1 | $0.00 | D007 | 1 | $0.00 | D00B | 1 | $0.00 | D00F | 1 | $0.00 | D00K | 1 | $0.00 | ||||||
| More than 19 | D004 | 1 | $0.00 | D008 | 1 | $0.00 | D00C | 1 | $0.00 | D00G | 1 | $0.00 | D00L | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| TACLAN C2 Suites (excluding Laptops) | |||||||||||||||||||||
| The contractor shall provide TACLAN C2 Suites (excluding Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| TACLAN C2 Suites (excluding Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | D00M | 2 | $0.00 | D00R | 2 | $0.00 | D00V | 2 | $0.00 | D00Z | 2 | $0.00 | D013 | 2 | $0.00 | ||||||
| 5 - 9 | D00N | 2 | $0.00 | D00S | 2 | $0.00 | D00W | 2 | $0.00 | D010 | 2 | $0.00 | D014 | 2 | $0.00 | ||||||
| 10 - 19 | D00P | 1 | $0.00 | D00T | 1 | $0.00 | D00X | 1 | $0.00 | D011 | 1 | $0.00 | D015 | 1 | $0.00 | ||||||
| More than 19 | D00Q | 1 | $0.00 | D00U | 1 | $0.00 | D00Y | 1 | $0.00 | D012 | 1 | $0.00 | D016 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage D-&P of D-&N
E - NIPR Segment
| H92222-11-R-0010 | NIPR Segment | CLIN 0001, Exhibit E | |||||||||||||||||||
| NIPR Segment (including Laptops) | |||||||||||||||||||||
| The contractor shall provide NIPR Segment (including Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| NIPR Segment (including Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | ELIN | QTY | Unit Price | Extended Total | Total | |
| 1 - 4 | E001 | 2 | $0.00 | E004 | 2 | $0.00 | E008 | 2 | $0.00 | E00B | 2 | $0.00 | E00F | 2 | $0.00 | ||||||
| 5 - 9 | E002 | 2 | $0.00 | E005 | 2 | $0.00 | E009 | 2 | $0.00 | E00C | 2 | $0.00 | E00G | 2 | $0.00 | ||||||
| More than 9 | E003 | 1 | $0.00 | E006 | 1 | $0.00 | E00A | 1 | $0.00 | E00E | 1 | $0.00 | E00H | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| NIPR Segment (excluding Laptops) | |||||||||||||||||||||
| The contractor shall provide NIPR Segment (excluding Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| NIPR Segment (excluding Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | E00J | 2 | $0.00 | E00M | 2 | $0.00 | E00Q | 2 | $0.00 | E00T | 2 | $0.00 | E00W | 2 | $0.00 | ||||||
| 5 - 9 | E00K | 2 | $0.00 | E00N | 2 | $0.00 | E00R | 2 | $0.00 | E00U | 2 | $0.00 | E00X | 2 | $0.00 | ||||||
| More than 9 | E00L | 1 | $0.00 | E00P | 1 | $0.00 | E00S | 1 | $0.00 | E00V | 1 | $0.00 | E00Y | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage E-&P of E-&N
F - SIPR Segment
| H92222-11-R-0010 | SIPR Segment | CLIN 0001, Exhibit F | |||||||||||||||||||
| SIPR Segment (including Laptops) | |||||||||||||||||||||
| The contractor shall provide SIPR Segment (including Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| SIPR Segment (including Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | F001 | 2 | $0.00 | F004 | 2 | $0.00 | F008 | 2 | $0.00 | F00B | 2 | $0.00 | F00F | 2 | $0.00 | ||||||
| 5 - 9 | F002 | 2 | $0.00 | F005 | 2 | $0.00 | F009 | 2 | $0.00 | F00C | 2 | $0.00 | F00G | 2 | $0.00 | ||||||
| More than 9 | F003 | 1 | $0.00 | F006 | 1 | $0.00 | F00A | 1 | $0.00 | F00E | 1 | $0.00 | F00H | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| SIPR Segment (excluding Laptops) | |||||||||||||||||||||
| The contractor shall provide SIPR Segment (excluding Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| SIPR Segment (excluding Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | F00J | 2 | $0.00 | F00M | 2 | $0.00 | F00Q | 2 | $0.00 | F00T | 2 | $0.00 | F00W | 2 | $0.00 | ||||||
| 5 - 9 | F00K | 2 | $0.00 | F00N | 2 | $0.00 | F00R | 2 | $0.00 | F00U | 2 | $0.00 | F00X | 2 | $0.00 | ||||||
| More than 9 | F00L | 1 | $0.00 | F00P | 1 | $0.00 | F00S | 1 | $0.00 | F00V | 1 | $0.00 | F00Y | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage F-&P of F-&N
G - JWICS Segment
| H92222-11-R-0010 | JWICS Segment | CLIN 0001, Exhibit G | |||||||||||||||||||
| JWICS Segment (including Laptops) | |||||||||||||||||||||
| The contractor shall provide JWICS Segment (including Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| JWICS Segment (including Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | G001 | 2 | $0.00 | G004 | 2 | $0.00 | G008 | 2 | $0.00 | G00B | 2 | $0.00 | G00F | 2 | $0.00 | ||||||
| 5 - 9 | G002 | 2 | $0.00 | G005 | 2 | $0.00 | G009 | 2 | $0.00 | G00C | 2 | $0.00 | G00G | 2 | $0.00 | ||||||
| More than 9 | G003 | 1 | $0.00 | G006 | 1 | $0.00 | G00A | 1 | $0.00 | G00E | 1 | $0.00 | G00H | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| JWICS Segment (excluding Laptops) | |||||||||||||||||||||
| The contractor shall provide JWICS Segment (excluding Laptops) in accordance with the SOW and Attachments 1-6, 19. | |||||||||||||||||||||
| JWICS Segment (excluding Laptops) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | G00J | 2 | $0.00 | G00M | 2 | $0.00 | G00Q | 2 | $0.00 | G00T | 2 | $0.00 | G00W | 2 | $0.00 | ||||||
| 5 - 9 | G00K | 2 | $0.00 | G00N | 2 | $0.00 | G00R | 2 | $0.00 | G00U | 2 | $0.00 | G00X | 2 | $0.00 | ||||||
| More than 9 | G00L | 1 | $0.00 | G00P | 1 | $0.00 | G00S | 1 | $0.00 | G00V | 1 | $0.00 | G00Y | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage G-&P of G-&N
H - Laptops
| H92222-11-R-0010 | Laptops | CLIN 0001, Exhibit H | |||||||||||||||||||
| CF-52 Laptops | |||||||||||||||||||||
| The contractor shall provide Laptops in accordance with the SOW and Attachments 1-6, 19. All CF-52 laptops will come with a 3 year manufacturer's extended warranty (in addition to the standard 1 year manufacturer's warranty). | |||||||||||||||||||||
| CF-52 Laptops 2 GB (CF-52NKB102M) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H001 | 10 | $0.00 | H008 | 10 | $0.00 | H00F | 10 | $0.00 | H00N | 10 | $0.00 | H00V | 10 | $0.00 | ||||||
| 26 - 50 | H002 | 10 | $0.00 | H009 | 10 | $0.00 | H00G | 10 | $0.00 | H00P | 10 | $0.00 | H00W | 10 | $0.00 | ||||||
| 51 - 75 | H003 | 10 | $0.00 | H00A | 10 | $0.00 | H00H | 10 | $0.00 | H00Q | 10 | $0.00 | H00X | 10 | $0.00 | ||||||
| 76 - 100 | H004 | 5 | $0.00 | H00B | 5 | $0.00 | H00J | 5 | $0.00 | H00R | 5 | $0.00 | H00Y | 5 | $0.00 | ||||||
| 101 - 150 | H005 | 5 | $0.00 | H00C | 5 | $0.00 | H00K | 5 | $0.00 | H00S | 5 | $0.00 | H00Z | 5 | $0.00 | ||||||
| 151 - 250 | H006 | 2 | $0.00 | H00D | 2 | $0.00 | H00L | 2 | $0.00 | H00T | 2 | $0.00 | H010 | 2 | $0.00 | ||||||
| More than 250 | H007 | 2 | $0.00 | H00E | 2 | $0.00 | H00M | 2 | $0.00 | H00U | 2 | $0.00 | H011 | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| CF-52 Laptops 4GB (CF-52NKE102M) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H012 | 10 | $0.00 | H019 | 10 | $0.00 | H01G | 10 | $0.00 | H01P | 10 | $0.00 | H01W | 10 | $0.00 | ||||||
| 26 - 50 | H013 | 10 | $0.00 | H01A | 10 | $0.00 | H01H | 10 | $0.00 | H01Q | 10 | $0.00 | H01X | 10 | $0.00 | ||||||
| 51 - 75 | H014 | 10 | $0.00 | H01B | 10 | $0.00 | H01J | 10 | $0.00 | H01R | 10 | $0.00 | H01Y | 10 | $0.00 | ||||||
| 76 - 100 | H015 | 5 | $0.00 | H01C | 5 | $0.00 | H01K | 5 | $0.00 | H01S | 5 | $0.00 | H01Z | 5 | $0.00 | ||||||
| 101 - 150 | H016 | 5 | $0.00 | H01D | 5 | $0.00 | H01L | 5 | $0.00 | H01T | 5 | $0.00 | H020 | 5 | $0.00 | ||||||
| 151 - 250 | H017 | 2 | $0.00 | H01E | 2 | $0.00 | H01M | 2 | $0.00 | H01U | 2 | $0.00 | H021 | 2 | $0.00 | ||||||
| More than 250 | H018 | 2 | $0.00 | H01F | 2 | $0.00 | H01N | 2 | $0.00 | H01V | 2 | $0.00 | H022 | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| CF-52 Laptops 8GB (CF-52NKG102M) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H023 | 10 | $0.00 | H02A | 10 | $0.00 | H02H | 10 | $0.00 | H02Q | 10 | $0.00 | H02X | 10 | $0.00 | ||||||
| 26 - 50 | H024 | 10 | $0.00 | H02B | 10 | $0.00 | H02J | 10 | $0.00 | H02R | 10 | $0.00 | H02Y | 10 | $0.00 | ||||||
| 51 - 75 | H025 | 10 | $0.00 | H02C | 10 | $0.00 | H02K | 10 | $0.00 | H02S | 10 | $0.00 | H02Z | 10 | $0.00 | ||||||
| 76 - 100 | H026 | 5 | $0.00 | H02D | 5 | $0.00 | H02L | 5 | $0.00 | H02T | 5 | $0.00 | H030 | 5 | $0.00 | ||||||
| 101 - 150 | H027 | 5 | $0.00 | H02E | 5 | $0.00 | H02M | 5 | $0.00 | H02U | 5 | $0.00 | H031 | 5 | $0.00 | ||||||
| 151 - 250 | H028 | 2 | $0.00 | H02F | 2 | $0.00 | H02N | 2 | $0.00 | H02V | 2 | $0.00 | H032 | 2 | $0.00 | ||||||
| More than 250 | H029 | 2 | $0.00 | H02G | 2 | $0.00 | H02P | 2 | $0.00 | H02W | 2 | $0.00 | H033 | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| 250 GB Hard Drive (CF-K52H004) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H034 | 10 | $0.00 | H03B | 10 | $0.00 | H03J | 10 | $0.00 | H03R | 10 | $0.00 | H03Y | 10 | $0.00 | ||||||
| 26 - 50 | H035 | 10 | $0.00 | H03C | 10 | $0.00 | H03K | 10 | $0.00 | H03S | 10 | $0.00 | H03Z | 10 | $0.00 | ||||||
| 51 - 75 | H036 | 10 | $0.00 | H03D | 10 | $0.00 | H03L | 10 | $0.00 | H03T | 10 | $0.00 | H040 | 10 | $0.00 | ||||||
| 76 - 100 | H037 | 5 | $0.00 | H03E | 5 | $0.00 | H03M | 5 | $0.00 | H03U | 5 | $0.00 | H041 | 5 | $0.00 | ||||||
| 101 - 150 | H038 | 5 | $0.00 | H03F | 5 | $0.00 | H03N | 5 | $0.00 | H03V | 5 | $0.00 | H042 | 5 | $0.00 | ||||||
| 151 - 250 | H039 | 2 | $0.00 | H03G | 2 | $0.00 | H03P | 2 | $0.00 | H03W | 2 | $0.00 | H043 | 2 | $0.00 | ||||||
| More than 250 | H03A | 2 | $0.00 | H03H | 2 | $0.00 | H03Q | 2 | $0.00 | H03X | 2 | $0.00 | H044 | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| CF-19 Laptops | |||||||||||||||||||||
| The contractor shall provide Laptops in accordance with the SOW and Attachments 1-6, 21. All CF-19 laptops will come with a 3 year manufacturer's extended warranty (in addition to the standard 1 year manufacturer's warranty). | |||||||||||||||||||||
| CF-19 Laptops (CF-19VMRFX2M) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H045 | 5 | $0.00 | H04C | 5 | $0.00 | H04K | 5 | $0.00 | H04S | 5 | $0.00 | H04Z | 5 | $0.00 | ||||||
| 26 - 50 | H046 | 5 | $0.00 | H04D | 5 | $0.00 | H04L | 5 | $0.00 | H04T | 5 | $0.00 | H050 | 5 | $0.00 | ||||||
| 51 - 75 | H047 | 5 | $0.00 | H04E | 5 | $0.00 | H04M | 5 | $0.00 | H04U | 5 | $0.00 | H051 | 5 | $0.00 | ||||||
| 76 - 100 | H048 | 2 | $0.00 | H04F | 2 | $0.00 | H04N | 2 | $0.00 | H04V | 2 | $0.00 | H052 | 2 | $0.00 | ||||||
| 101 - 150 | H049 | 2 | $0.00 | H04G | 2 | $0.00 | H04P | 2 | $0.00 | H04W | 2 | $0.00 | H053 | 2 | $0.00 | ||||||
| 151 - 250 | H04A | 1 | $0.00 | H04H | 1 | $0.00 | H04Q | 1 | $0.00 | H04X | 1 | $0.00 | H054 | 1 | $0.00 | ||||||
| More than 250 | H04B | 1 | $0.00 | H04J | 1 | $0.00 | H04R | 1 | $0.00 | H04Y | 1 | $0.00 | H055 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| 160 GB Hard Drive (CF-K19HD1631) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | H056 | 5 | $0.00 | H05D | 5 | $0.00 | H05L | 5 | $0.00 | H05T | 5 | $0.00 | H060 | 5 | $0.00 | ||||||
| 26 - 50 | H057 | 5 | $0.00 | H05E | 5 | $0.00 | H05M | 5 | $0.00 | H05U | 5 | $0.00 | H061 | 5 | $0.00 | ||||||
| 51 - 75 | H058 | 5 | $0.00 | H05F | 5 | $0.00 | H05N | 5 | $0.00 | H05V | 5 | $0.00 | H062 | 5 | $0.00 | ||||||
| 76 - 100 | H059 | 2 | $0.00 | H05G | 2 | $0.00 | H05P | 2 | $0.00 | H05W | 2 | $0.00 | H063 | 2 | $0.00 | ||||||
| 101 - 150 | H05A | 2 | $0.00 | H05H | 2 | $0.00 | H05Q | 2 | $0.00 | H05X | 2 | $0.00 | H064 | 2 | $0.00 | ||||||
| 151 - 250 | H05B | 1 | $0.00 | H05J | 1 | $0.00 | H05R | 1 | $0.00 | H05Y | 1 | $0.00 | H065 | 1 | $0.00 | ||||||
| More than 250 | H05C | 1 | $0.00 | H05K | 1 | $0.00 | H05S | 1 | $0.00 | H05Z | 1 | $0.00 | H066 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage H-&P of H-&N
J - Field Computing Device
| H92222-11-R-0010 | Field Computing Device | CLIN 0001, Exhibit J | |||||||||||||||||||
| FCD Semi-Ruggedized | |||||||||||||||||||||
| The contractor shall provide FCD - Semi-Ruggedized in accordance with the SOW and Attachments 1-6, 19 and 21. | |||||||||||||||||||||
| FCD - Semi-Ruggedized | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | J001 | 5 | $0.00 | J008 | 5 | $0.00 | J00F | 5 | $0.00 | J00N | 5 | $0.00 | J00V | 5 | $0.00 | ||||||
| 26 - 50 | J002 | 5 | $0.00 | J009 | 5 | $0.00 | J00G | 5 | $0.00 | J00P | 5 | $0.00 | J00W | 5 | $0.00 | ||||||
| 51 - 75 | J003 | 5 | $0.00 | J00A | 5 | $0.00 | J00H | 5 | $0.00 | J00Q | 5 | $0.00 | J00X | 5 | $0.00 | ||||||
| 76 - 100 | J004 | 5 | $0.00 | J00B | 5 | $0.00 | J00J | 5 | $0.00 | J00R | 5 | $0.00 | J00Y | 5 | $0.00 | ||||||
| 101 - 150 | J005 | 2 | $0.00 | J00C | 2 | $0.00 | J00K | 2 | $0.00 | J00S | 2 | $0.00 | J00Z | 2 | $0.00 | ||||||
| 151 - 250 | J006 | 2 | $0.00 | J00D | 2 | $0.00 | J00L | 2 | $0.00 | J00T | 2 | $0.00 | J010 | 2 | $0.00 | ||||||
| More than 250 | J007 | 1 | $0.00 | J00E | 1 | $0.00 | J00M | 1 | $0.00 | J00U | 1 | $0.00 | J011 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 | |||||||||||
| FCD - Fully Ruggedized | |||||||||||||||||||||
| The contractor shall provide FCD - Fully Ruggedized in accordance with the SOW and Attachments 1-6, 19 and 21. | |||||||||||||||||||||
| Note: The Offeror is not required to complete the Fully Ruggedized ELIN. | |||||||||||||||||||||
| FCD - Fully-Ruggedized | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | J012 | 5 | $0.00 | J019 | 5 | $0.00 | J01G | 5 | $0.00 | J01P | 5 | $0.00 | J01W | 5 | $0.00 | ||||||
| 26 - 50 | J013 | 5 | $0.00 | J01A | 5 | $0.00 | J01H | 5 | $0.00 | J01Q | 5 | $0.00 | J01X | 5 | $0.00 | ||||||
| 51 - 75 | J014 | 5 | $0.00 | J01B | 5 | $0.00 | J01J | 5 | $0.00 | J01R | 5 | $0.00 | J01Y | 5 | $0.00 | ||||||
| 76 - 100 | J015 | 5 | $0.00 | J01C | 5 | $0.00 | J01K | 5 | $0.00 | J01S | 5 | $0.00 | J01Z | 5 | $0.00 | ||||||
| 101 - 150 | J016 | 2 | $0.00 | J01D | 2 | $0.00 | J01L | 2 | $0.00 | J01T | 2 | $0.00 | J020 | 2 | $0.00 | ||||||
| 151 - 250 | J017 | 2 | $0.00 | J01E | 2 | $0.00 | J01M | 2 | $0.00 | J01U | 2 | $0.00 | J021 | 2 | $0.00 | ||||||
| More than 250 | J018 | 1 | $0.00 | J01F | 1 | $0.00 | J01N | 1 | $0.00 | J01V | 1 | $0.00 | J022 | 1 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage J-&P of J-&N
K - Mission Planning Kits
| H92222-11-R-0010 | Mission Planning Kits | CLIN 0001, Exhibit K | |||||||||||||||||||
| Mission Planning Kits (MPK) | |||||||||||||||||||||
| The contractor shall provide MISSION PLANNING KITS (MPK) in accordance with the SOW and Attachments 1-6 and Attachment 9. | |||||||||||||||||||||
| MISSION PLANNING KITS (MPK) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 25 | K001 | 10 | $0.00 | K005 | 10 | $0.00 | K009 | 10 | $0.00 | K00D | 10 | $0.00 | K00H | 10 | $0.00 | ||||||
| 26 - 50 | K002 | 5 | $0.00 | K006 | 5 | $0.00 | K00A | 5 | $0.00 | K00E | 5 | $0.00 | K00J | 5 | $0.00 | ||||||
| 51 - 75 | K003 | 3 | $0.00 | K007 | 3 | $0.00 | K00B | 3 | $0.00 | K00F | 3 | $0.00 | K00K | 3 | $0.00 | ||||||
| More than 75 | K004 | 2 | $0.00 | K008 | 2 | $0.00 | K00C | 2 | $0.00 | K00G | 2 | $0.00 | K00L | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPahe K-&P of K-&N
L -Coalition Local Area Network
| H92222-11-R-0010 | Coalition Local Area Network | CLIN 0001, Exhibit L | |||||||||||||||||||
| Coalition Local Area Network (C-LAN) | |||||||||||||||||||||
| The contractor shall provide Coalition Local Area Network (C-LAN) in accordance with Attachment 7. | |||||||||||||||||||||
| Coalition Local Area Network (C-LAN) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | L001 | 2 | $0.00 | L004 | 2 | $0.00 | L007 | 2 | $0.00 | L00A | 2 | $0.00 | L00D | 2 | $0.00 | ||||||
| 5 - 9 | L002 | 2 | $0.00 | L005 | 2 | $0.00 | L008 | 2 | $0.00 | L00B | 2 | $0.00 | L00E | 2 | $0.00 | ||||||
| More than 9 | L003 | 2 | $0.00 | L006 | 2 | $0.00 | L009 | 2 | $0.00 | L00C | 2 | $0.00 | L00F | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage L-&P of L-&N
M - Full Motion Video
| H92222-11-R-0010 | Full Motion Video Video Distribution Hub Lite | CLIN 0001, Exhibit M | |||||||||||||||||||
| Full Motion Video Video Distribution Hub Lite (FMV VDH-Lite) | |||||||||||||||||||||
| The contractor shall provide Full Motion Video Distribution Hub Lite (FMV VDH-Lite) in accordance with Attachment 8 (including software). | |||||||||||||||||||||
| Full Motion Video Distribution Hub Lite (FMV VDH-Lite) | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | M001 | 2 | $0.00 | M004 | 2 | $0.00 | M007 | 2 | $0.00 | M00A | 2 | $0.00 | M00D | 2 | $0.00 | ||||||
| 5 - 9 | M002 | 2 | $0.00 | M005 | 2 | $0.00 | M008 | 2 | $0.00 | M00B | 2 | $0.00 | M00E | 2 | $0.00 | ||||||
| More than 9 | M003 | 2 | $0.00 | M006 | 2 | $0.00 | M009 | 2 | $0.00 | M00C | 2 | $0.00 | M00F | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage M-&P of M-&N
N - Radio Over IP
| H92222-11-R-0010 | Radio Over IP Kit | CLIN 0001, Exhibit N | |||||||||||||||||||
| Radio Over IP (ROIP) Kit | |||||||||||||||||||||
| The contractor shall provide Radio Over IP (ROIP) Kit in accordance with Attachment 10. | |||||||||||||||||||||
| Radio Over IP (ROIP) Kit | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||||||||||||
| Evaluation Qty | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | ELIN | QTY | Unit Price | Extended Total | Total |
| 1 - 4 | N001 | 2 | $0.00 | N004 | 2 | $0.00 | N007 | 2 | $0.00 | N00A | 2 | $0.00 | N00D | 2 | $0.00 | ||||||
| 5 - 9 | N002 | 2 | $0.00 | N005 | 2 | $0.00 | N008 | 2 | $0.00 | N00B | 2 | $0.00 | N00E | 2 | $0.00 | ||||||
| More than 9 | N003 | 2 | $0.00 | N006 | 2 | $0.00 | N009 | 2 | $0.00 | N00C | 2 | $0.00 | N00F | 2 | $0.00 | ||||||
| Base Year 1 Total : | $0.00 | Base Year 2 Total : | $0.00 | Base Year 3 Total : | $0.00 | Option Year 1 Total : | $0.00 | Option Year 2 Total : | $0.00 | $0.00 |
&CPage N-&P of N-&N
P - Baseline Upgrades
| H92222-11-R-0010 | Baseline Upgrades | CLIN 0003, Exhibit P | |||||||||
| Baseline Upgrades | |||||||||||
| The contractor shall provide Baseline Upgrades in accordance with paragraph 14.0 of the SOW. | |||||||||||
| Baseline Upgrades | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | Total | |||||
| ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | Price | |
| For evaluation purposes, the Government wants up to four man years (ie..1880 hours) of software support, at the FFP rate. | P001 | $ - 0 | P002 | $ - 0 | P003 | $ - 0 | P004 | $ - 0 | P005 | $ - 0 | $ - 0 |
| Labor Hours Evaluation Quantity | 1880 | Per Labor Category | |||||||||
| FFPCategories | FFP Rate | Base Yr 1 Dollars | FFP Rate | Base Yr 2 Dollars | FFP Rate | Base Yr 3 Dollars | FFP Rate | Option Yr 1 Dollars | FFP Rate | Option Yr 2 Dollars | Total |
| Project Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer/Programmer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Configuration Management Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
&CPage P-&P of P-&N
Q - Sustainment Training
| H92222-11-R-0010 | Sustainment Training | CLIN 0003, Exhibit Q | ||||||||||||||
| Sustainment Training Class - CONUS | ||||||||||||||||
| The contractor shall provide Sustainment Training Class (Full Suite & C2 Suite) - CONUS in accordance with paragraph 15.0 of the SOW. | ||||||||||||||||
| Sustainment Training Class - CONUS | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | |||||||||||
| Max Order Qty | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | Total |
| 25 | Q001 | $0.00 | Q002 | $0.00 | Q003 | $0.00 | Q004 | $0.00 | Q005 | $0.00 | $0.00 | |||||
| Sustainment Training Class - OCONUS | ||||||||||||||||
| The contractor shall provide Sustainment Training Class (Full Suite & C2 Suite) - OCONUS in accordance with paragraph 15.0 of the SOW. | ||||||||||||||||
| Sustainment Training Class - OCONUS | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | |||||||||||
| Max Order Qty | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | ELIN | Unit Price | Extended Price | Total |
| 25 | Q006 | $0.00 | Q007 | $0.00 | Q008 | $0.00 | Q009 | $0.00 | Q00A | $0.00 | $0.00 |
&CPage Q-&P of Q-&N
R - Provisioning
| H92222-11-R-0010 | Provisioning | CLIN 0003, Exhibit R | ||||||||
| Provisioning | ||||||||||
| The contractor shall provide Provisioning in accordance with paragraph 8.4 of the SOW | ||||||||||
| Provisioning | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | |||||
| ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | |
| R001 | R002 | R003 | R004 | R005 | ||||||
| Note: The Offeror is not required to complete the provisioning CLIN. |
&CPage R-&P of R-&N
S - Equipment Lifecycle Support
| H92222-11-R-0010 | Equipment Lifecycle Support | CLIN 0004, Exhibit S | |||||||||
| Equipment Lifecycle Support | |||||||||||
| The contractor shall provide Equipment Lifecycle Support in accordance with paragraph 3.3 of the SOW. | |||||||||||
| Equipment Lifecycle Support | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||
| ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ||
| For evaluation purposes the amount includes materials & equipment, shipping, travel, software licensing. Labor, for the evauation, will be calculated below. | S001 | S002 | S003 | S004 | S005 | ||||||
| Materials & Equipment | $500,000.00 | $500,000.00 | $500,000.00 | $500,000.00 | $500,000.00 | ||||||
| Shipping | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | $20,000.00 | ||||||
| Travel | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | $30,000.00 | ||||||
| Software Licensing | $75,000.00 | $75,000.00 | $75,000.00 | $75,000.00 | $75,000.00 | ||||||
| Indirect Rates Applied (list Below) | Rate | Rate | Rate | Rate | Rate | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Total Equipment Lifecycle Support | $625,000.00 | $625,000.00 | $625,000.00 | $625,000.00 | $625,000.00 | 3,125,000.00 | |||||
| Labor Hours Evaluation Quantity | 200 | Per Labor Category | |||||||||
| Labor Categories | T&M Rate | Base Yr 1 Dollars | T&M Rate | Base Yr 2 Dollars | T&M Rate | Base Yr 3 Dollars | T&M Rate | Option Yr 1 Dollars | T&M Rate | Option Yr 2 Dollars | Total |
| Program Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Project Manager | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Subject Matter Expert | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Analyst | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Software Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Architect | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Systems Administrator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Database Analyst/Programmer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Software Developer/Programmer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Server Management Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Storage Management Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Database Administrator (DBA) – Physical | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Hardware Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Hardware Technician | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Technical Writer/Editor | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Configuration Management Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Quality Assurance Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| IA Security Systems Engineer | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistics Management Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Logistics Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Transportation Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Warehousemen | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Equipment Operator | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Training Specialist | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineering Technician I | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineering Technician II | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Engineering Technician III | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total T&M Labor Dollars | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| Total Evaluated Quantity | $625,000.00 | $625,000.00 | $625,000.00 | $625,000.00 | $625,000.00 | $3,125,000.00 | |||||
| Note: As the Government is unaware of the contractor's proposed rate structures, you will need to complete this tab. | |||||||||||
| Offeror's should show full calculation of the proposed indirect rates applied to the allocation base. |
&CPage S-&P of S-&N
T - System EngineeringStudies
| H92222-11-R-0010 | System Engineering/Studies | CLIN 0004, Exhibit T | |||||||||
| System Engineering/Studies | |||||||||||
| The contractor shall provide System Engineering/Studies in accordance with paragraph 13.0 of the SOW. | |||||||||||
| System Engineering/Studies | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||
| ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ELIN | Unit Price | ||
| For evaluation purposing, this amount is for an engineering study. | T001 | $1,200,000.00 | T002 | $1,200,000.00 | T003 | $1,200,000.00 | T004 | $1,200,000.00 | T005 | $1,200,000.00 | |
| Indirect Rates Applied (list Below) | Rate | Rate | Rate | Rate | Rate | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| G&A | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Total Evaluated Price | $1,200,000.00 | $1,200,000.00 | $1,200,000.00 | $1,200,000.00 | $1,200,000.00 | $6,000,000.00 | |||||
| Note: As the Government is unaware of the contractor's proposed rate structures, you will need to complete this tab. | |||||||||||
| Offeror's should show full calculation of the proposed indirect rates applied to the allocation base. |
&CPage T-&P of T-&N
U - Travel
| H92222-11-R-0010 | Travel | CLIN 0004, Exhibit U | |||||||||
| Travel | |||||||||||
| The contractor shall provide Travel in accordance with the Joint Travel Regulation, the SOW, and Section I clause 5652.231-9001 Allowable Travel Costs (2005). | |||||||||||
| TRAVEL | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||
| ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | Total | |
| Direct Travel | U001 | $ 40,000.00 | U002 | $ 40,000.00 | U003 | $ 40,000.00 | U004 | $ 40,000.00 | U005 | $ 40,000.00 | 200,000.00 |
| Indirect Rates Applied (list Below) | Rate | Rate | Rate | Rate | Rate | ||||||
| G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| Total Proposed | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 200,000.00 | |||||
| Note: As the Government is unaware of the contractor's proposed rate structures, you will need to complete this tab. | |||||||||||
| Offeror's should show full calculation of the proposed indirect rates applied to the allocation base. |
&CPage U-&P of U-&N
V - Shipping
| H92222-11-R-0010 | OCONUS Shipping | CLIN 0004, Exhibit V | |||||||||
| OCONUS Shipping | |||||||||||
| OCONUS Shipping reimbursement will be for the difference between the actual shipping cost and the cost of CONUS shipping already calculated in the equipment price. | |||||||||||
| OCONUS SHIPPING | Base Year 1 | Base Year 2 | Base Year 3 | Option Year 1 | Option Year 2 | ||||||
| ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | ELIN | NTE Unit Price | Total | |
| V001 | $ 40,000.00 | V002 | $ 40,000.00 | V003 | $ 40,000.00 | V004 | $ 40,000.00 | V005 | $ 40,000.00 | 200,000.00 | |
| Indirect Rates Applied (list Below) | Rate | Rate | Rate | Rate | Rate | ||||||
| G&A | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | |||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | - 0 | ||||||
| Total Proposed | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 40,000.00 | $ 200,000.00 | |||||
| Note: As the Government is unaware of the contractor's proposed rate structures, you will need to complete this tab. | |||||||||||
| Offeror's should show full calculation of the proposed indirect rates applied to the allocation base. |
&CPage V-&P of V-&N
Labor Categories
| 1. Program Manager |
| The senior manager responsible for coordinating the management of all work performed under a contract or task order. Capable of negotiating and making binding decisions for a Contractor company. Acts as the central point of contact for the contract or task order. Ultimately responsible for coordinating the effort of subcontractors, team members, and vendors. Possesses broad and deep knowledge of the IT industry, business administration, and human resource management, and have excellent oral and written communications skills. Responsible for ensuring that the Contractor has the capability of performing all the work. Responsible for organizing, directing, and coordinating planning and production of all contract or task order support activities and resources. Oversees the operational planning, establishment, execution, and evaluation of a multifaceted program/project typically consisting of a set of closely related subprograms or associated activities. |
| 2. Project Manager |
| Manages the project work as defined by the client contract. Leads all aspects of project startup and ongoing execution. This includes identifying, tracking managing and resolving project issues, proactively disseminating project information to all stakeholders, identifying, managing and mitigating project risk, ensuring that the solution is of acceptable quality, proactively managing scope to ensure that only what was agreed to is delivered, unless changes are approved through scope management, defining and collecting metrics to give a sense for how the project is progressing and whether the deliverables produced are acceptable, and managing the overall schedule to ensure work is assigned and completed on time and within budget. Manages the fact-finding, analysis, and development of hypothesis / conclusions, production of final reports and delivery of presentations. Responsible for ensuring that the project delivers to client expectations on time and to budget. |
| 3. Subject Matter Expert |
| Provides subject matter expertise for work described in a contractor or task order. Provides advanced technical knowledge and analysis of highly specialized applications and operational environment, high-level functional systems analysis, design, integration, documentation, training, and implementation advice on complex problems which require doctorate level knowledge of the subject matter for effective implementation. Applies principles, methods, and knowledge of specific functional areas of expertise to specific task order requirements. Provides advice on esoteric problems which require extensive knowledge of the subject matter. Designs and prepares technical reports, studies, and related documentation, makes charts and graphs to record results, prepares and delivers presentations, training, and briefings as required by the task order. Demonstrates exceptional oral and written communication skills. |
| 4. Systems Analyst |
| Analyzes user needs to determine functional and cross-functional requirements to identify required tasks and their interrelationships. Identifies resources required for each task, analyzes and evaluates systems requirements, identifies potential problems, and develops appropriate corrective action. Works with System Engineers, Technical Architect, and IA Security Systems Engineer to develop, design, and implementation plans for IT systems from project inception to conclusion. Coordinates with Systems Software Engineers to ensure proper implementation of system specifications, as well as coordinating with functional end users, to develop and provide recommendations on alternative system solutions. |
| 5. Systems Engineer |
| Analyzes system capacity and throughput requirements in response to demand forecasts and operations trends to determine, plan, and provide for system capabilities required for projected workloads. Plans layout and installation of new systems or modification of existing systems. May set up and control analog or hybrid computer systems to solve mission-specific engineering problems. Knowledgeable in multiple current technology areas, including relational database platforms, client/server computer operating systems (thick & thin clients), networking hardware, protocols and administration, project management, and system integration across multi-tiered highly secure IT environments. Recognizes and recommends new or emerging technology or software to satisfy functional requirements and processes. Provides highly technical and/or specialized guidance concerning automation solutions to complex information processing problems related to the subject field. Provides customer support using enterprise solutions software to integrate business areas, consistent with today’s technology in order to operate in an open systems environment and client service architectures. |
| 6. Systems Software Engineer |
| Formulates and defines specifications for operating system applications or modifies and maintains existing applications using engineering releases and utilities from the manufacturer. Responsible for program design, modeling, simulation, coding, testing, debugging and documentation. Responsible for applications dealing with the overall operating system, such as sophisticated file maintenance routines, large telecommunications/communications networks, computer accounting and advanced mathematical/scientific software packages. Instructs, directs, and checks the work of other task personnel. Responsible for quality assurance review and the evaluation of existing and new software products. Provides identification/fixing for the problems within existing software, design/implementation of new systems, enhances the existing applications and participates in analysis, design and new construction of next generation IT applications. Responsible for understanding the needs of the customers and the realities of commercially available IT products, and creating requirements that will allow implementation by the development team and COTS products. Also, contributes knowledge of telecommunications concepts, computer languages, operating systems, database/DBMS and applications. |
| 7. Systems Architect |
| Establishes system information requirements in the development of enterprise-wide or large scale information systems. Designs architecture to include the software, hardware, and communications to support the total requirements as well as provide for present and future cross-functional requirements and interfaces. Evaluates analytically and systematically problems of workflows, organization, and plans and develops appropriate corrective action. |
| 8. Systems Administrator |
| Provides the day-to-day system administration to include system and resource optimization, and user assistance. Conducts capacity and performance analysis, and provides system configuration change and upgrade recommendations. Increases system administrator efficiency and accuracy via the use of automated tools and scripts, develops system administrator procedures, and conducts system administrator training and skills assessment. Optimizes system operation and resource utilization, and performs system capacity analysis and planning. Provides assistance to users in accessing and using systems. |
| 9. Database Analyst/Programmer |
| Responsible for program database design, coding, testing, debugging, and documentation. Has full technical knowledge and responsibility of all phases of applications systems analysis and programming. Understands the business or function for which application is designed. Designs, implements and maintains databases. Maintains database dictionaries, monitors standards and procedures and integration of systems through database design. |
| 10. Software Developer/Programmer |
| Responsible for software program design, coding, testing, debugging and documentation. Has full technical knowledge and responsibility of all phases of applications systems analysis and programming. Understands the business or function for which application is designed. Performs maintenance on existing software products and contributes knowledge of business applications. Writes programs according to specifications needed. Works with the technical staff to understand problems had with software and responds to suggestions for improvements and enhancements. Also, assists in the development of software user manuals. |
| 11. Server Management Engineer |
| Installs, configures, rebuilds, upgrades, patches, and maintains all server hardware and software including operating systems, application software, databases software, and system management software. Performs performance monitoring, tuning, and development of stored procedures as well as develops maintenance plans for all Windows and Linux/Secure Linux server platforms, including administering all classes and types of test and production servers. Consults with management and other technical staff on server design, implementation, and maintenance issues. Analyzes business requirements and recommends technical solutions and provides technical support for development and implementation of new server solutions. Researches, evaluates, and recommends new server management tools and technologies. Works with Systems Engineers, Storage Engineers, Technical Architect, and other technical personnel on design and implementation of server systems. Provides proactive and reactive root cause analysis for all server-related identified / developing problems and issues and develops and implements recommendations for prevention recurrence. Identifies enterprise server requirements and trends and develops alternative solutions to address needs. Creates documentation and procedures pertaining to server management to include current and future server architecture, standards and best practices, and COOP/DR scenarios and solutions. Performs enterprise server metric, reporting, and performance monitoring. |
| 12. Storage Management Engineer |
| Architect and implement mission critical storage area network (SAN) system infrastructure required to support our high availability, online transaction processing (OLTP) environment. Translates current industry trends in data storage, into designing bullet proof end-to-end solutions, and the administration, management, and optimization of the SAN/NAS/RAID infrastructure. Maps business requirements to technology capabilities, identifying gaps and omissions, technical knowledge of data center issues, including physical infrastructure with multiple experiences participating in major data center upgrades and data migrations. Configures all implementation and configuration parameters with an emphasis on performance & high availability. Performs enterprise SAN metric, reporting, and performance monitoring. Identifies enterprise storage requirements and trends and develops alternative solutions to address needs. Creates documentation and procedures around the storage / SAN to include current and future storage architecture, standards and best practices, disaster recovery scenarios and solutions. Provides proactive and reactive root cause analysis for all storage/SAN related identified / developing problems and issues and develops and implements recommendations for prevention recurrence. |
| 13. Database Administrator (DBA) – Physical |
| Implements, monitors, and reorganizes databases, codes, tests, implements, and maintains database architectures. Executes utility requirements such as reorganization, back-up and recovery. Analyzes and resolves database system production problems. Analyzes user requirements and statistics, and participates in database design and performance evaluation reviews. Advises systems engineers on database coding issues. Prepares system documentation. May be involved in the data modeling process. |
| 14. Hardware Engineer |
| Monitors, operates, and maintains hardware, and software, for a computing platform. Organizes and directs hardware installations on site surveys and assesses and documents current site configuration and user requirements. Maintains disaster recovery procedures for distributed computing hardware and resident software. Analyzes and develops new hardware requirements and prepares specifications for hardware acquisition, installation and deployment. Directs and leads preparation of engineering plans and site installation technical design packages. Develops hardware installation schedules and mobilizes installation teams. Directs and leads preparation of drawings documenting configuration changes at each site. Responsible for preparing site installation and test reports. Coordinates post installation operations and maintenance support with all other IT service providers. Performs system backup and recovery activities. Performs audits of hardware/software inventory to ensure integrity as well as licensing compliance. May provide user orientation on hardware and software operations. |
| 15. Hardware Technician |
| Supports and maintains end-user devices and related technology equipment and IT assets. This includes installing, configuring, diagnosing, repairing, moving, relocating, upgrading, and replacing all USSOCOM Distributed Computing hardware and software. Troubleshoots problem areas and performs on-site or in-house servicing, repair, and installations on desktops, laptops, printers, and other related peripheral devices. Provides technical support in activities associated with the identification, prioritization, and resolution of reported problems. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .