Attachment 16 TACLAN Provider Performance Measurement
View the file
Other files
Show 40 more
Latest 50 of 63 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 16: TACLAN Provider Performance Measurement
4 October 2010
Introduction The Government will evaluate contractor performance in accordance with the Service Level Agreements (SLA) contained in Appendix A to this attachment. The Government’s evaluation will be used to calculate the Contractor’s eligibility for term incentives defined in section H clause entitled “Contract Incentives.” Common SLAs are independently evaluated SLAs that are in multiple SITEC contracts. Shared SLAs are SLAs that are in multiple SITEC contracts but are collectively evaluated to measure a service from end-to-end. Specific SLAs are unique to that contract.
Performance Incentive Calculation The Government will measure and assess Contractor performance each month to determine the service level achievements performance against the Minimal Acceptable SLA performance criteria, assign a score to each SLA, and develop a monthly performance score by applying weights to each SLA score. The Government will use the cumulative total of all months for the evaluation period to determine the Contractor’s eligibility for term incentives in accordance with Section H clause entitled “Contract Incentives”.
If the Contractor exceeds the Target Criteria level of performance stated in block 4B of the SLA the Government will assign a score “1” for the SLA. If the Contractor meets the Minimum Acceptable level in Block 4C of performance the Government will assign a score of “0” for the SLA. If the Contractor fails to meet the Minimum Acceptable level of performance the Government will assign a score of “-1” for the SLA.
After the Government has completed the monthly assessment of the SLAs the Government will determine SLA Area scores and monthly performance score using the weights in Appendix B.
The SLA Area Score will be the sum of each SLA score within the SLA Area multiplied by the weights assign to the respective SLAs. The monthly performance score will be the sum of each SLA Area score multiplied by the weights assign to the respective SLA Areas.
For each evaluation period, the Government will assess the Contractor’s SLA performance achievement using the monthly performance scores determined. Each Evaluation Period Score will be the sum of the monthly performance scores for all months within the evaluation period.
Additional details pertaining to the Performance Incentive calculation methodology can be found in Appendix B of this document.
Transition-In Acceptance and SLA Performance Commencement
Transition-In will be deemed to be completed as of the first business day immediately following the service transition completion date as specified in the Transition Project Plan, provided that the ITMO provides written notice of acceptance of transition-in completion (“Service Acceptance Date”). As of the Service Acceptance Date, the Contractor shall have successfully completed implementation and deployment of all required Transition Project Plan activities to USSOCOM’s satisfaction, including all service delivery processes, procedures, security controls, management tools, and related documentation as specified in the SOW.
The Contractor shall also have all service management resources and support services in place and in full compliance with the SOW operational requirements.
The measurement and reporting of the Contractor’s performance will become effective in accordance with the Service Management Performance Measurement criteria as specified in Attachment 16 for the purposes of tracking Contractor’s eligibility to receive term incentives defined in section H clause entitled “Contract Incentives.”
In the event that the Contractor fails to achieve Transition-In Completion by the Transition-In Completion Date specified in the Transition Project Plan approved by USSOCOM, then the Contractor shall have a maximum of thirty (30) successive calendar days from the Transition- In Completion Date to finish all outstanding transition activities and deliverables to USSOCOM’s satisfaction, at which point Transition-In Completion will be deemed to have occurred for the purposes of Service Level Management Performance Measurement.
Priority Levels and IT Response Requirements In providing its respective IT services, the TACLAN Contractor shall manage service delivery and perform its services in accordance with the prioritization schema and incident response requirements as specified in Appendix C - Priority Level Definitions and Appendix D - IT Response Requirements by Priority.
Appendix A: TACLAN Contractor Performance Requirements
The following table summarizes the Service Level Agreements (SLAs) associated with TACLAN Contractor services.
Table 1: TACLAN Service Level Agreement (SLA) Summa ry
Service Area Task Area SLA
Number Shared Targets SLA Name Applicable CLINs
T A
C
LA
N
Operations for
TACLAN
G-3.0 Common TACLAN Customer Satisfaction
Clin 0001, 0002, 0003, 0004
TACLAN Area Specific Services
G-4.3 Common Project Management - On-Time Delivery – actual
vs. Delivery Order estimate
Clin 0001, 0002, 0003, 0004
G-4.7
Common Problem Resolution Management
Clin 0001, 0002
G-3.0 Service Operations for TACLAN
G-3.0 Service Operations for TACLAN – TACLAN Custo mer Satisfaction
1. SLA SUMMARY
1A. TASK AREA Service Operations for
TACLAN
1B. PERFORMANCE
CATEGORY
Timeliness
1C. SLA # G-3.1 1D. SLA NAME TACLAN Customer Satisfaction
2. SLA OVERVIEW
2A. SLA DESCRIPTION Measures the percentage of unsatisfactory ratings from TACLAN customers as compared to total BMC Remedy tickets assigned to TACLAN’s technical support group.
2B. PERFORMANCE
PERIOD
This SLA becomes effective upon contract award and is in effect on a continuous basis without interruption throughout the Task Order Period of Performance
3. SLA METRICS
3A. MEASUREMENT
INTERVAL
Program Management: The Interval is one calendar month.
3B. MEASUREMENT
PERIOD
Program Management: The Measurement Period begins at 00:01 on the first day of the month and ends at 24:00 on the last day of the month
3C. SOURCE OF
MEASUREMENT
DATA
BMC Remedy ticket system and responses to a customer satisfaction survey.
Positive rates are determined by 1) positive feedback on survey or 2) No response to survey. Negative comments are determined by 1) a negative response on survey.
3D. METHOD OF
SURVEILLANCE
100% Inspection . For each one month period, count the total number of closed BMC Remedy tickets assigned to TACLAN technical support. Determine the number of unsatisfactory ratings based on customer satisfaction survey results.
The appropriate report will be produced by the Service Desk and delivered to the
ITMO.
3E. TIMING OF
MEASUREMENT
Measurements are taken within 5 days of the end of the Measurement Period.
3F. EXCEPTIONS Field left blank intentionally.
4. SLA MEASUREMENT
4A. CALCULATION Program Management: To determine the percentage of unsatisfactory ratings divide the number of negative responses by the total number of closed BMC Remedy tickets.
4B. TARGET CRITERIA At least 98% customer satisfaction.
4C. MINIMUM
ACCEPTABLE
At least 95% customer satisfaction.
4D. DEFINITIONS None
5. SLA ADMINISTRATION
5A. REPORTING
FREQUENCY
1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.
2. Monthly reporting of SLA attainment.
5B. NOTES AND
COMMENTS
This SLA will have to be underpinned heavily by Associate Contractor Agreements and Memorandums of Understandings.
G-4.0 TACLAN Area Specific Services
G-4.3 TACLAN Area Specific Services / Project Manag ement – On- Time Delivery / Milestone Completion to Schedule
1A. TASK AREA TACLAN Area Specific Services
1B. PERFORMANCE
CATEGORY
Timeliness and Accuracy
1C. SLA # G-4.3 1D. SLA NAME Project Management - On-Time Delivery – actual vs. Delivery Order estimate
2. SLA OVERVIEW
2A. SLA DESCRIPTION Ensures TACLAN Contractor’s actual dates of delivery are consistently on-time based on the stated delivery date on the USSOCOM-authorized Delivery Order or Project Schedule that was approved and signed off by the Contracting Officer. Government approved changes in the delivery date shall be considered as the new on time delivery date.
2B. PERFORMANCE
PERIOD
This SLA becomes effective upon contract award and is in effect on a continuous basis without interruption throughout the Delivery Order Period of Performance
3. SLA METRICS
3A. MEASUREMENT
INTERVAL
Program Management: The interval is per delivery schedule cited in each delivery order.
The Measurement Period for both program and contract management is based on the delivery schedule cited in each delivery order. Since delivery orders may not have the same period of performance the measurement period begins on the date that each DO is awarded.
3C. SOURCE OF
MEASUREMENT
DATA
KO and PCOR Task Order financial log.
3D. METHOD OF
SURVEILLANCE
100 Percent Inspection. Complete inspection of all Contractor Delivery Order delivery / completion schedule change requests resulting in a schedule slippage from the original delivery schedule and/or project plan as approved by the Government.
3E. TIMING OF
MEASUREMENT
Program Management: Program management is measured monthly during the delivery period.
3H. EXCEPTIONS Field left blank intentionally.
4. SLA MEASUREMENT
4A. CALCULATION Program Management: To determine the percentage of delivery orders late divide the number of delivery orders late by the total number of delivery orders issued.
4B. TARGET CRITERIA 95% of all scheduled deliverables and/or completion dates are completed according to the original Government-approved baseline delivery / completion schedule
4C. MINIMUM
ACCEPTABLE
90% of all scheduled deliverables and/or completion dates are completed according to the original Government-approved baseline delivery / completion schedule
4F. DEFINITIONS None
5. SLA ADMINISTRATION
5A. REPORTING
FREQUENCY
1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.
2. Monthly reporting of SLA attainment.
5B. NOTES AND
COMMENTS
None
G-4.7 TACLAN Area Specific Services – Problem Res olution
1A. TASK AREA TACLAN Area Specific Services
1B. PERFORMANCE
CATEGORY
Quality / Availability
1C. SLA # G-4.7 1D. SLA NAME Problem Resolution Management
2. SLA OVERVIEW
2A. SLA DESCRIPTION Trouble tickets elevated to a TACLAN technical representative through BMC Remedy are resolved in a timely manner.
2B. PERFORMANCE
PERIOD
This SLA becomes effective upon contract award and is in effect on a continuous basis without interruption throughout the contract period of performance
3. SLA METRICS
3A. MEASUREMENT
INTERVAL
Program Management: The Measurement Interval is one calendar month.
The measurement period is from the time a BMC Remedy trouble ticket is assigned to a TACLAN technician to the time the trouble ticket is closed or replacement part/system is shipped.
3C. SOURCE OF
MEASUREMENT
DATA
BMC Remedy reports and/or log showing shipment of replacement part/system.
3D. METHOD OF
SURVEILLANCE
Complete inspection of BMC Remedy tickets and TACLAN Contractor shipment logs.
3E. TIMING OF
MEASUREMENT
Program Management; Measured monthly on an on-going basis throughout the contract period of performance.
3F. EXCEPTIONS Field left blank intentionally.
4. SLA MEASUREMENT
4A. CALCULATION Date/time of BMC Remedy ticket closure and/or shipping log entry showing equipment shipment minus the date/time of the BMC Remedy ticket being assigned to a TACLAN Technician.
4B. TARGET CRITERIA Total elapsed time of not more than 24 hours to close BMC Remedy ticket or shipment of parts/system required to solve issue. Non business days shall not be counted against the 24 hours.
4C. MINIMUM
ACCEPTABLE
Total elapsed time of not more than 36 hours to close BMC Remedy ticket or shipment of parts/system required to solve issue. Non business days shall not be counted against the 36 hours.
4D. DEFINITIONS None.
5. SLA ADMINISTRATION
5A. REPORTING
FREQUENCY
1. Reporting to commence upon Contract Award and continue throughout the Period of Performance.
2. Monthly reporting.
5B. NOTES AND
COMMENTS
None
Appendix B: Structure for Performance Incentive Administration
Performance Incentive Functions
The Government will establish the following performance incentive administration functions.
Performance Incentive Determination Official (PIDO) . The PIDO is the USSOCOM Special Operations Acquisition Executive (SOAE) or designee. Primary PIDO responsibilities include:
a) Determining the evaluation rating for each evaluation period and incentives earned for each incentive period
b) Changing the matters covered in this plan as addressed in Section 4 as appropriate
Contracting Officer (KO). The primary responsibilities of the Contracting Officer include:
a) Notifying the contractor in writing of the determination made by the PIDO
b) Implementing changes covered in this plan as addressed in Section 4
Primary Contracting Officer’s Representative (PCOR) . The primary responsibilities of the PCOR include:
a) Maintaining official paperwork that pertains to the incentive determination
b) Consolidating periodic evaluations of Contractor performance through quarterly reviews with the ITMO Performance Monitors and Site Representatives
c) Presenting the Performance Evaluation Report (PER) through the Chief Information Officer (CIO) Council covering the findings and recommendations for each evaluation period for an overall Enterprise performance report
d) Submitting the Performance Evaluation Report (PER) to the PIDO covering the findings and recommendations for each evaluation period
e) Consolidating changes in this plan and recommending those appropriate for adoption by the PIDO and KO, as addressed in Section 4
ITMO Performance Monitors / Service Level Managers An ITMO Performance Monitor / Service Level Manger will be assigned to each Service Level Agreement (SLA) category to be evaluated. The primary ITMO Performance Monitor / Service Level Manager responsibilities include:
a) Monitoring, evaluating, and assessing contractor performance in assigned areas
b) Periodically providing the input to the Performance Evaluation Report for the PCOR as appropriate
c) Recommending appropriate changes in this performance incentive structure for consideration, as addressed in Section 4
The Contracting Officer will appoint one or more contract Performance Monitor(s), based on the recommendations of the ITMO lead. The Contracting Officer is responsible for ensuring a performance monitor is assigned for each SLA category to be evaluated under the contract. The Performance Monitor(s) will have expertise relative to the assigned performance area emphasis. The Contracting Officer may change performance monitor assignments at any time without advance notice to the contractor. The ITMO will coordinate the performance monitor assignment change through the Contracting Officer who will notify the Contractor promptly of all Performance Monitor assignments and changes.
The PCOR will ensure that each Performance Monitor receives the following:
a) A copy of this plan along with any changes made
b) Appropriate orientation and guidance
c) Specific instructions applicable to the monitors’ assigned performance areas
ITMO Site Representatives The ITMO Site Representative responsibilities include:
a) Conducting periodic evaluations of contractor performance and submitting a PER to the PCOR covering the findings and recommendations for each evaluation period
b) Attending quarterly reviews called by the PCOR to review findings and recommendations
c) Recommending changes to this performance incentive structure and submitting recommendations to the PCOR for appropriate action
1. Method for Determining Performance Incentives
The Government will conduct a determination of the performance rating for each one month period within thirty days of the end of each month. The Contractor earns and accrues credits for service level performance that exceeds the Performance Targets in the Service Level Agreements. The PIDO will determine the evaluation rating for each twelve-month evaluation period and the performance incentive earned for within forty days after the end of the period.
This evaluation process will commence after the award of the contract.
ITMO Performance Monitors / Service Level Managers will evaluate and assess Contractor performance. Performance Monitors will submit inputs for Performance Evaluation Reports monthly and, if required, make verbal presentations to the PCOR.
2. Performance Incentive Calculation
USSOCOM will use a four-step process for determining incentives on the contract. The steps are described below and depicted graphically in Figure 1 below.
Figure 1. Incentive Determination Process
Award
Determination
Step 1 – Assess the contractor’s performance agains t the performance targets
The Government will measure and assess Contractor performance each month to determine the service level performance achievements compared to the Minimal Acceptable performance criteria for each SLA. The Government will assign a score of either: -1, 0, or +1 to each SLA based upon level of accomplishment toward satisfying the Minimal Acceptable performance criteria (see Section 8 for an example). These scores will summed to derive a total raw score for each SLA. The raw score will be multiplied by a Government-assigned weighting factor for each SLA that indicates relative degree of importance of each SLA. The monthly score will be used to ascertain if Contractor’s SLA performance levels areas meet, significantly exceed, or fall short of the Minimum Acceptable criteria and require a Service Improvement Plan to remediate or correct performance levels. The Government will develop a final score by summing all twelve months of weighted scores for each of the performance targets in each of the service level areas. The final score shall include all performance targets for the entire year. No score shall be accrued for the Performance Incentive where the Contractor performance only meets or minimally exceeds the Minimum Acceptable service level target. See the Performance Incentive Definitions (Section 5), Award Formulas (Section 6), and Example (Section 8) for additional details. USSOCOM will use total contract year performance scores to determine if the Contractor may be eligible for a performance incentive.
Step 2 – Assess the results for all of the performa nce targets
On an annual basis, the Government will assess the contractor’s SLA performance achievement using the monthly performance scores determined in Step 1 above for all of the individual SLAs.
The Government will determine the Contractor’s annual SLA performance score by calculating twelve overall total weighted score (one or each of the monthly SLA performance scores). The Government will then total the annual total score for each SLA to derive the overall annual service level performance.
Step 3 – Performance incentive decision
In step 3, the Government will use the results from Step 2 to determine if the Contractor is eligible for the performance incentive. The Government will add all of the weighted scores for all of the performance targets to derive a composite rating for the contract year, and based upon the results of the final rating, determine if the Contractor’s performance is sufficient to be eligible to receive the performance incentive.
Assess
TACLAN
Contractor performance against the performance target
Assess Results for all
Performance Targets in the
TACLAN
Contractor contract
Make the Award Decision
Award Determination
1 2 3 4
3. Changes in Plan Coverage
Right to Make Unilateral Changes - the Government may revise SLA in accordance with the procedures outlined below. The changes will be made without formal modification of the contract. Figure 2 below illustrates the actions and timeframe for initiating changes to the SLAs.
Figure 2. Steps to Change SLA Plan Coverage
Step Action Schedule
a. Performance Monitors/PCOR drafts proposed changes Ongoing.
b. Government PCOR / ITMO begin SLA requirements change discussions
NLT 180 days prior to beginning of evaluation period.
c. ITMO creates/updates SLAs NLT 150 days prior to beginning of evaluation period.
d. Contractor implements automated measurement systems where necessary
NLT 120 days prior to beginning of evaluation period.
e. Contracting Officer, ITMO, and Contractor begin discussions on SLAs and target service levels
NLT 90 days prior to beginning of evaluation period.
f. ITMO submits recommended changes to SLAs NLT 60 days prior to beginning of evaluation period.
g. ITMO submits recommended changes to the rest of the contract to the KO for approval
NLT 30 days prior to beginning of evaluation period.
f. Contractor submits new SLA Management Plan and updated SLAs
Prior to beginning of evaluation period.
g. KO notifies contractor of changes Prior to beginning of evaluation period.
4. Performance Incentive Definitions
Variable Name Description
(m) = Monthly score The monthly score of: -1, 0, or 1. Assigned each month to describe the service level achievements by a contractor for performance against the target criteria.
(r) = Raw score Total of all monthly scores evaluated for the award or incentive period. This is the score for the year not including weighting for the performance targets.
(f) = Weighting Factor The relative importance of one SLR against another SLR on a 100 point scale expressed as a percentage. Weighting factors are determined by the SLRs impact on Mission Critical Services first and then by impact on non-mission critical services.
(w) = Weighted Score The product of the weighting factor and the raw score.
(a) = Award Decision The sum of all Weighted Scores.
(pt) = Performance Targets Quantity of metrics that are measured in the SLAs for each contract area.
5. Award Formulas
Award Term Formulas
# / Area Formula Where
1. Weighted Score w = f * r w = weighted score f = weighting factor r = raw score
2. Raw Score r = ∑m r = raw score
∑m = sum of all monthly scores
3. Calculate raw score for all performance targets rpt= ∑mpt pt = performance targets
4. Award Decision a=(∑w for all pt) > 8.0 a = award decision
∑w = sum of all weighted scores pt = performance targets
6. Service Area and Service Level Requirement Weigh ts
Area
Area Weighting Task Area SLA
Number Shared Targets SLA Name Weighting
Factor
33.3% Service Operations for
TACLAN
G-3.1 Common Overall ITSM Delivery - Accountability for Ticket Ownership
33.3%
66.6% TACLAN Area Specific Services
G-4.3 Common Project Management – On-Time Delivery/Milestone Completion to Schedule
33.3%
G-4.7
Common Problem Resolution
33.3%
7. Example of Annual Year Performance Calculation S corecard
The notional example below illustrates four scenarios using random weighting for three Performance Targets:
a) Minimum Performance - Meeting only the minimum acceptable performance levels
b) Best Case - Achieving a perfect score for an entire year and achieving a new Award Term, the weighted score was equal to or greater than eight (8).
c) Exceeding Performance - Exceeding Performance and achieving a new Award Term, the weighted score was equal to or greater than eight (8).
LEGEND (Monthly Performance)
GREEN
Achieved SLA Minimum Acceptable Level
Performance
BLUE Exceeded SLA Performance Target
RED
Failed to Achieved Minimum SLA
Acceptable Level Performance
Performance Target SLR
Weighting Factor % Example
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
Raw
Score
Weighted
Score A w a rd
D e ci si o n
SLA Performance Target 1 SLR 1 27.00% 0 0 0 0 0 0 0 0 0 0 0 0 0.0000 0.00 0.00
SLA Performance Target 2 SLR 2 35.00% 0 0 0 0 0 0 0 0 0 0 0 0 0.0000 0.00
SLA Performance Target 3 SLR 3 38.00% 0 0 0 0 0 0 0 0 0 0 0 0 0.0000 0.00 No Award
Performance Target SLR
Weighting Factor % Example
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
Raw
Score
Weighted
Score A w a rd
D e ci si o n
SLA Performance Target 1 SLR 1 27.00% 1 1 1 1 1 1 1 1 1 1 1 1 12.0000 3.24 12.00
SLA Performance Target 2 SLR 2 35.00% 1 1 1 1 1 1 1 1 1 1 1 1 12.0000 4.20
SLA Performance Target 3 SLR 3 38.00% 1 1 1 1 1 1 1 1 1 1 1 1 12.0000 4.56 Award
Performance Target SLR
Weighting Factor % Example
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
Raw
Score
Weighted
Score A w a rd
D e ci si o n
SLA Performance Target 1 SLR 1 27.00% -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -12.0000 -3.24 -12.00
SLA Performance Target 2 SLR 2 35.00% -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -12.0000 -4.20
SLA Performance Target 3 SLR 3 38.00% -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -1 -12.0000 -4.56 Penalties
Performance Target SLR
Weighting Factor % Example
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
M o n th
Raw
Score
Weighted
Score A w a rd
D e ci si o n
SLA Performance Target 1 SLR 1 27.00% 1 0 1 1 0 1 0 1 1 1 1 0 8.0000 2.16 8.32
SLA Performance Target 2 SLR 2 35.00% 1 1 1 1 1 1 1 1 1 0 1 0 10.0000 3.50
SLA Performance Target 3 SLR 3 38.00% 1 0 1 1 0 -1 1 1 1 0 1 1 7.0000 2.66 Award
8.00
Blue
Red
Year 1 - 6
Year 1 - 6
Year 1 - 6
Award Term Threshold
Award
No Award
A.
B.
C.
D.
Appendix C: Priority Level Definitions
“Priority Levels ” (also known as Incident or Problem Severity Level ) means the defined categories that identify the degree of business criticality and importance to USSOCOM (the “MISSION/ Business Impact ”) of specific Incidents or Problems and the associated Contractor response requirements attributed to any such Incident, Problem or Service Requests. The following table provides the Priority Level Definitions categories and descriptions that apply to all Services.
Table 1 –Priority Level Definitions
Priority Level Definition/Examples
Priority Level 1 – Emergency / Urgent - Critical Mission / Business Impact
CRITICAL - Multiple End-User impact with no workaround. The Incident or Problem has caused a complete and immediate work stoppage affecting an entire Unit or Command Group or primary mission / business process or a broad group of End-Users. Examples:
� Major application Incident or Problem (e.g., Outlook/Exchange/ messaging application, portal) � Severe Incident or Problem during critical periods (e.g., deployment support, month-end processing) � Network/database failure, virus detected, command group assistance and deployment support � Security violation (e.g., denial of service, port scanning)
Priority Level 2 – Urgent - Major Mission / Business Impact
URGENT - Multiple end-user impact with approved workaround. A mission / business process is affected in such a way that mission/ business functions are severely degraded, multiple end-users are impacted or a key customer is affected (VIP Support). A workaround may be available; however the workaround is not easily sustainable. Examples:
� Major data/database or application Incident or Problem (e.g., Outlook Web
Automation email access on NIPR with MS-Exchange/ with Outlook still available)
Priority Level 3 – Priority - Minimal Mission / Business Impact
PRIORITY - Single End-User with single impact. A business process is affected in such a way that certain functions are unavailable to End-Users or a system and/or service is degraded. A Workaround may be available. Examples:
� Telecommunication Incident or Problem (e.g., In-Garrison Blackberry outage with non-mobile email still available, Video conference location unavailable with audio-conference still functioning)
� Workstation problem (e.g., hardware, software) � Individual related problems such as E-mail, printer, scanner, individual loss of network connections, or help using software applications
Priority Level 4 – Routine – Low Mission / Business Impact
ROUTINE - Service Request that has little impact on mission or normal business processes and can be handled on a scheduled basis. Example:
� End-User requests (e.g., system enhancement, deployment, access rights) � Preventative maintenance (not part of an Incident or Problem Resolution.)
Appendix D: IT Response Requirements by Priority
“IT Response Requirements ” (also known as Response Time ) means the elapsed reaction and response time within which specific or designated actions must be taken and notifications provided to response to, diagnose, and resolve any given Incident, based upon the designated Priority Level of the Incident at the time the Incident it is reported or as may be reprioritized as more information is gathered or the situation evolves. The Priority Level is assigned based upon its Mission/ Business Impact. The Contractor’s priority level response requirements for any given Incident, Problem, or Service Request are specified in the following table and apply to apply to all Contractor-provided Services:
Table 1 –IT Response Requirements Levels Description
Priority 1 Response Requirement
• Must acknowledge dispatch and begin managing in queue within 10 minutes of dispatch.
• Must complete:
o Within 30 minutes must have a work-around or temporary solution for non-IMAC o To be completed within 1 day for IMACs o For Patches to have 100% coverage within release package to target group within 1 business day or within 4 hours of first connectivity thereafter without related incident.
• Must update status every 15 minutes for non-IMAC, and every 2-hours for IMAC and patches.
Priority 2 Response Requirement
• Must acknowledge dispatch and begin managing in queue within 30 minutes of dispatch.
• Must update status every 30 minutes/ daily for patches / every 2 days for projects.
• Must complete:
o Within 24 hours for Non-projects or Non- IMACs.
o Within 3 business days for Projects and IMACs.
o For Patches to have 100% coverage within release package to target group within 3 business days or within 6 hours of first connectivity thereafter without related incident.
Priority 3 Response Requirement
• Must acknowledge dispatch and begin managing in queue within 2 hours.
• Must update status every 24 hours / every 2 business days for patches / every 5 days for projects.
• Must complete:
o Within 3 business days for Non-projects or Non-IMACs.
o Within 8 business days for Projects and IMACs.
o For Patches to have 100% coverage within release package to target group within 6 business days or within 24 hours of first connectivity thereafter without related incident.
Priority 4 Response Requirement
• Must acknowledge dispatch and begin managing in queue within 1 day.
• Must update status every 2 business days for Non-projects or Non- IMACs (and every 20 business days for Projects and IMACs).
• Must complete within 10 business days for Non-projects and Non- IMACs.
Appendix E: Contract Discrepancy Report
SERVICE PROVIDER DISCREPENCY REPORT 1. DISCREPENCY
REPORT NUMBER
2. TO: (Service Provider and Manager Name) 3. FROM: (PCOR Name)
DATES
PREPARED ORAL NOTIFICATION RETURNED BY
CONTRACTOR
ACTION COMPLETE
4. DISCREPENCY OR PROBLEM (Describe in Detail. Include PWS references. Attach Continuation Sheet if Necessary.)
5. SIGNATURE OF PCOR
6. TO: (Name of PCOR) 7. FROM: (Service Provider)
8. SERVICE PROVIDER RESPONSE AS TO CAUSE, EFFECT, CORRECTIVE ACTION AND
ACTIONS TO PREVENT RECURRENCE. (Attach Continuation Sheet if necessary. Cite applicable SP QC program procedures or new QC procedures.)
9. SIGNATURE OF SP REPRESENTATIVE 10. DATE
11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, or rejection. Attach Coordination Sheet if necessary.)
12. GOVERNMENT ACTIONS (Cure notice, show cause, other.)
CLOSE OUT
Contractor
NOTIFIED
NAME AND TITLE SIGNATURE DATE
ITMO QAE
PCOR
Appendix F: Customer Feedback Report
CUSTOMER FEEDBACK RECORD
DATE AND TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
INDIVIDUAL
NATURE OF COMPLAINT
PWS REFERENCE
VALIDATION
DATE AND TIME SERVICE PROVIDER INFORMED
OF COMPLAINT
NAME OF SP REPRESENTATIVE
INFORMED OF COMPLAINT
ACTION TAKEN BY SERVICE PROVIDER (Responsible officer)
RECEIVED AND VALIDATED BY
Determination: Complaint Valid � Complaint Invalid �
Appendix G: Sampling Guide / Inspection Checklist
SERVICE FUNCTION: ________________________________________________________
PWS SECTION: ________________________________________________________
NOTE: E = Excellent Performance S = Satisfactory Performance U = Unsatisfactory Performance N/A = Not Applicable
1 Method of Surveillance:
2 Lot Size:
3 Sample Size:
4 Performance Requirement: Performance is excellent (E) when _____ or fewer defects are discovered per month. Performance is satisfactory (S) when _____ or fewer defects are discovered per month. Performance is unsatisfactory (U) when _____ or more defects are discovered per month.
5 Sampling Procedure: Instructions on how to select the sample must be clear and complete
6 Inspection Procedure: The procedure must be detailed enough to allow a yes/no objective decision as to the acceptability of performance by anyone making the inspection. Explain when evaluation is to occur and what is acceptable/unacceptable.
Performance: Excellent (E), Satisfactory (S), Unsatisfactory (U), Not Applicable (N/A)
Performance Requirements Timeliness Quality of Work Notes
Overall Rating Of Inspection (E, S, U, or N/A)
Inspector Comments:
Contractor Signature: Date: _________________
ITMO Performance Monitor Signature: Date: