QASP.docx
DOCX document 22 KB Posted
- Attached to
- SETA JIAMDO Re-Compete
- Solicitation number
- H91269629500
About this file
This is a Quality Assurance Surveillance Plan (QASP) for Systems Engineering Technical Assistance (SETA) support to the Joint Integrated Air and Missile Defense Organization (JIAMDO) of the Joint Staff, J-8. The QASP establishes the Government's systematic method for monitoring contractor performance across analytic, strategic, technical, managerial, and administrative support services. The contractor must perform studies, analyses, wargames, exercises, technical demonstrations, and assessments of programs, processes, doctrines, policies, and strategies at classification levels ranging from unclassified to TS SAP/SCI and FP/ACCM, as determined by competent classification authority.
Performance will be measured against four primary elements: Contractor Quality Control Plan (requiring 100% compliance with quarterly inspections), Contract Deliverables (requiring >95% timely submission without rework through 100% inspection), Overall Contract Performance (requiring a Satisfactory or higher annual rating from the Contracting Officer's Representative), and Invoicing (requiring 100% accuracy with monthly reviews). Surveillance methods include random or planned sampling, periodic or random inspection, and validated customer complaints. Contractors failing to meet acceptable performance levels may receive Contract Discrepancy Reports requiring written responses within five days, potential non-exercise of additional task orders, contract termination, and loss of future Government contracts. The contractor is incentivized to maintain quality and timeliness by avoiding costs associated with rework or corrective actions and by maximizing profit on incurred costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Contract Administration Plan (CAP).pdf | ||
| Solicitation Amendment - N0018926RD0090001.pdf | ||
| Past Performance Information Form.docx | DOCX document | |
| Solicitation - N0018926RD009.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Purpose: To ensure that the Government has an effective and systematic method of surveillance for the services in the PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of supporting analytic, strategic, technical, managerial, and administrative support to enhance the customer’s mission and total force readiness is the timely, accurate, and thorough completion of all contract and task order requirements. The work performed under this task order encompasses all aspects of support services in the areas of planning, analysis, monitoring, evaluation, assessment, and documentation of programs required to satisfy Systems Engineering and Technical Assistance (SETA) needs of the Joint Integrated Air and Missile Defense Organization (JIAMDO). The contractor shall support JIAMDO and the Joint Staff J-8 in performing studies, analysis, wargames, exercises, technical demonstrations, and assessments of programs, processes, doctrines, policies and strategies which provide the customer with guidance, advice, and recommendations to support implementation and revision of the Defense Strategy, synchronized with the Planning, Programming, Budgeting, and Execution System (PPBES) cycle. These analyses may be conducted anywhere from unclassified up to the TS SAP/SCI and/or Focal Point/Alternative Compensatory Control Measures (FP/ACCM) level of classification as determined by competent classification authority.
2. Performance Standards
a. Schedule – The due dates for deliverables and the actual accomplishment of the schedule will be assessed against original due dates and milestones established for the contract or task order(s).
b. Deliverables – The deliverables required to be submitted will be assessed against the specifications for the deliverables detailed in the contract and task order(s) and the Quality Control Plan (QCP), if required by the contract, for the required content, quality, timeliness, and accuracy.
c. Past Performance – In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods: The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic or random inspection, and validated customer complaints.
4. Performance Measurement: Performance will be measured in accordance with the following table:
Performance Element
Performance Requirement
Surveillance Method
Frequency
Acceptable Quality Level
Contractor Quality Control Plan
| QC activities, inspections, and corrective actions completed as required by the plan |
| Inspection by the COR |
| Quarterly for overall QC activities; |
As required for corrective actions
100% compliance with the contractor plan
| Contract Deliverables |
| Contract deliverables furnished as prescribed in the PWS, attachments, CDRLs, Task Orders, etc., as applicable |
| Inspection by the COR |
| 100% inspection of all contract deliverables |
| >95% of deliverables submitted timely and without rework required |
| Overall Contract Performance |
| Overall contract performance of sufficient quality to earn a Satisfactory (or higher) rating in the COR’s annual report on Contractor Performance |
| Assessment by the COR |
| Annual |
| All performance elements rated Satisfactory (or higher) |
| Invoicing |
| Monthly invoices per contract procedures are timely and accurate |
| Review & acceptance of the invoice |
| Monthly |
| 100% accuracy |
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives:
The COR makes an annual report on Contractor Performance (CPARS or other annual report as required by the contract office). The contractor’s failure to achieve satisfactory performance under the contract or task order, reflected in the COR’s annual report, may result in termination of the contract or task order and may also result in the loss of future Government contracts or task orders. The contractor’s failure to achieve satisfactory performance under the contract or task order may result in the non-exercise of additional task orders.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report (CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within five days of receipt identifying how future occurrences of the problem will be prevented. Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional fee, to replace or correct work that fails to meet contract requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality products are provided in a timely manner.