Gym_Floor_Specs.docx
DOCX document 15 KB Posted
- Attached to
- Jackson Height Gymnasium Floor Refinishing
- Solicitation number
- 26-P-00441
- Issued by
- Hillsborough County, Florida
About this file
This is a Scope of Work specification document for the City of Tampa, Florida, related to gymnasium floor refinishing services at the Jackson Heights NFL YET Center located at 3310 E. Lake Ave., Tampa, Florida 33610. The project requires the selected contractor to sand, stripe, and refinish the gymnasium floor in a substantial and timely workmanlike manner according to manufacturer specifications. The scope of work includes sanding the floor completely down, thoroughly cleaning with a properly treated dust mop, walking the entire surface to ensure removal of all foreign matter, removing all dust and debris, tacking the surface until thoroughly clean, restriping the entire gym surface as requested by staff, applying three even coats of oil-based MFMA-approved finish, and providing adequate ventilation. The contractor must provide all new materials as specified and obtain written consent from the owner for any changes or deviations from the plans and specifications. The site visit contact person is Jamal Jefferson at the Jackson Heights NFL YET Center, reachable at (813) 753-9014 or jamal.jefferson@tampagov.net.
No pricing terms, set-asides, award dates, response deadlines, or contract term information is provided in this specification document. The document does not include details regarding funding sources, amounts, incumbent contractors, or renewal options.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT
Jackson Heights NFL YET Center
LOCATION
Jamal Jefferson Jackson Heights NFL YET Center 3310 E. Lake Ave.
Tampa, Florida 33610
SITE VISIT CONTACT PERSON
Jackson Heights NFL YET Center (813) 753-9014 jamal.jefferson@tampagov.net
SPECIFICATION
The selected contractor shall:
1. Provide all new material as specified below.
2. Perform all work in a substantial and timely, workmanlike manner to the manufacturer’s specification.
3. Request and receive written consent from the owner for any changes or deviations of the plans/specs.
SCOPE OF WORK
| The selected contractor shall: |
| SAND, STRIPE, & REFINISH |
1. Sand floor completely down.
2. Use a properly treated dust mop to clean the floor thoroughly.
3. Walk the entire floor to ensure that all foreign matter has been removed before abrading the surface.
4. Remove all dust and debris from the floor.
5. Tack the entire surface until it is thoroughly clean.
6. Restripe the entire gym’s surface as requested by staff.
7. Apply three even coats of oil based MFMA approved finish.
8. Provide ventilation.
File details come from the government source that posted it. Updated .