This document is a question and answer summary from the finalist selection process for the Georgia Vocational Rehabilitation Agency (GVRA) contract opportunity. The summary covers a variety of topics related to the GVRA campus, including the typical disabilities of clients, how clients circulate on campus, a campus map identifying key buildings, a list of 13 assessed buildings, and the operational status of certain buildings and facilities. The document also notes that Wellstar, the Department of Juvenile Justice, and Vocational Rehabilitation are co-located on the campus and providing services. Additionally, the document addresses questions about the relationship between GVRA and the non-profit organization Camp Twin Lakes, as well as the anticipated stakeholder groups and project duration.

The document indicates that the selected firm will be responsible for investigating the feasibility of a for-profit organization operating on the federally and historically designated GVRA campus. The summary also mentions that building assessments for the 13 identified buildings have been provided, but specific details about the findings are not included in the document.

View the file

Other files

File Type Posted
RFQ_RFP_MP _ GVRA_13.pdf PDF
GVRA_13 Finalist Firms.docx DOCX document
GVRA 13 _ RFQ Q_A.pdf PDF
GVRA_13 Notice of Award.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GVRA-13

Finalist Questions and Answers

1. Please provide GVRA's typical client's range of disabilities. RWS does not accept application based on a singular exceptionality diagnosis. Students will need to meet the program academic requirements (typically 3rd grade or above reading ability). Additionally, students must be able to function independently while on campus.

2. How do clients circulate from the Residential Complex to the Vocational Educational & Training Building or other buildings on campus? Walk, shuttle, other? Student travel is typically on foot or with the assistance of a wheelchair. Shuttle assistance is typically only used for inclement weather or recent medical emergencies.

3. Please provide a map of the core campus boundary. See attached campus map. The area outlined in red is considered the core of campus. The area outlined in green is Camp Dream. The area outlined in blue is the golf course and club house.

4. Please identify a specific list and map location of the buildings anticipated to be part of the study.

1. Ga Hall 10 – Bradley

Cottage 18- M.K.

Moore Cottage (offline)

27- Tennis Court

35- Chapel 43- West Wing

(Wellstar)

2. Builders Hall

11- Admin Bldg 19- Golf Course (offline)

28- Residential

Complex

36- Options Cottage

44- West Wing

(Wellstar)

3. Kress Hall 12- Voc. Edu &

Train Bldg 20- Center for Therapeutic

Rec.

29- Joseph Cottage (offline)

37- Barracks

Bldg

4. Founders Hall

(offline)

14- Des Portes Cottage (offline)

21- Outdoor Track

31- Apartments

A&B (offline)

38- Elm Rd Apts

(offline)

5. Wilson Bldg.

(offline)

15- Lite Cottage(offline)

22- Peabody Cottage (offline)

32- Pierson Cottage (offline)

39- Huntington

(offline)

6. Old Brace Shop

16- W.S. Moore Cottage(offline)

23- Camp Dream

(offline)

33- Mansion Cottage

40- Blanchard

9- Historic School 17- M.L. Curtis

24- Fryer Cottage (offline)

34- Spencer Cottage

42- Roosevelt

5. Please identify the 13 assessed buildings. Are all within the core campus study area? Georgia Hall, Builders Hall, Kress Hall, Founders Hall, Bradley Cottage, VRU Building, Desportes Cottage, Lite Cottage, WS Moore Cottage, ML Curtis Cottage, Joseph Cottage, Pierson Cottage, Roosevelt Hall.

6. Could you release the 13 building assessments? Or, at minimum, a summary of the findings?

Yes, see attached

7. Please identify the 20-25 'Hotel' rooms and which are 'offline'. The hotel rooms are in Kress Hall & Builders Hall. All hotel rooms are located in Builders Hall and Kress Hall. No rooms in Builders Hall are in service. 4-6 rooms in Kress Hall are not in service.

8. Please identify which buildings are 'offline" (by name and location on a map)

9. Are any other organizations co-located on campus or providing services in campus buildings

(similar to Wellstar as the hospital operator)? Wellstar, Dept of Juvenile Justice, and Vocational Rehabilitation (program within GVRA)

10. How did Camp Twin Lakes operate? Ground lease, rent, or other? I was told the relationship with Twin Lakes was based on a verbal agreement. I was not able to locate any documentation.

11. Camp Twin Lakes is a 501(c)(3) non-profit organization. Can a for-profit organization operate on Federal / Historic designated land? This will need to be investigated by the selected firm.

12. Please list anticipated stakeholder groups that would actively participate in the programming and master planning process. Roosevelt Warm Springs Development Fund Board of Trustees, Georgia Department of Natural Resources , Meriwether County Chamber of Commerce, and perhaps Wellstar.

13. Is there an anticipated duration for the project or any specific milestones for completion? Within 1 year for complete delivery