GUS Harrison Drawings 1.pdf

PDF 3 MB Posted

Attached to
472/17395. RMP Fire Alarm Project - Gus Harrison CF
Solicitation number
RFQ-171-190000000017-2
Issued by
Kalamazoo County, Michigan

About this file

This is a set of architectural and engineering drawings for a fire alarm upgrade project at the Gus Harrison Correctional Facility in Adrian, Michigan, prepared by TowerPinkster for the State of Michigan Department of Corrections. The drawings, which are at 90% review stage as of October 2018, detail plans for upgrading fire alarm systems across multiple buildings including administration buildings, food services, programs school, MSI industries, maintenance warehouse, and multiple housing units. The project includes 23 drawing sheets covering site plans, floor plans for individual buildings, and fire alarm riser diagrams, all designed in accordance with the 2011 National Electrical Code with Michigan amendments.

The drawings indicate extensive modifications to fire alarm and intrusion detection systems throughout the facility, including new fire alarm control panels, smoke detectors, heat detectors, manual pull stations, and associated wiring. The plans show detailed layouts for both existing and new fire alarm devices across multiple floors in various buildings, including housing units that contain inmate cells, administrative areas, and support facilities. The drawings include schedules of existing intrusion system points that will be maintained as well as new points to be added, indicating a comprehensive upgrade of both fire detection and security systems throughout the correctional complex.

View the file

Other files

File Type Posted
Advertisement 17395.pdf PDF
Specifications 1 of 2 17395.pdf PDF
GUS Harrison Drawings 2.pdf PDF
Specifications 2 of 2 17395.pdf PDF
472.17395.RMP Agenda 2018.10.31.pdf PDF
Sign In 2018.10.31.pdf PDF
Gus Harrison Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

DESIGN TEAM

ARCHITECT/ENGINEER

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

COVER SHEET

17-560.00

G 001

GUS HARRISON CORRECTIONAL FACILITY FIRE ALARM UPGRADE

STATE OF MICHIGAN DEPARTMENT OF

CORRECTIONS

Adrian, Michigan

90% REVIEW DOCUMENTS

REFERENCED CODES

MAPDRAWING INDEX

2011 NATIONAL ELECTRICAL CODE WITH MICHIGAN AMENDMENTS

242 EAST KALAMAZOO

SUITE 200

KALAMAZOO, MICHIGAN 49007

PHONE: 269.343.6133

FAX: 269.343.6633

SITE ADDRESS

GUS HARRISON CORRECTIONAL FACILITY

2727 E BEECHER ST

ADRIAN, MI 49221

GENERAL

G 001 COVER SHEET

ELECTRICAL

ES 101 GUS HARRISON CORRECTIONAL FACILITY SITE PLAN

ELECTRICAL

E 101 BUILDING 100 "NORTH ADMINISTRATION" - FIRST AND SECOND FLOOR PLANS

E 102 BUILDING 200 "NORTH FOOD SERVICES" - FIRST AND SECOND FLOOR PLANS

E 103 BUILDING 300 "NORTH PROGRAMS SCHOOL" - FIRST AND SECOND FLOOR PLANS

E 104 BUILDING 400 "MSI INDUSTRIES" - FIRST FLOOR PLAN

E 105 BUILDINGS 500 "NORTH MAINTENANCE WAREHOUSE" - FIRST FLOOR PLANS

E 106 BUILDING H01 "HOUSING UNIT 1" - LOWER LEVEL PLANS

E 107 BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS

E 108 BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL PLANS

E 109 BUILDING H02 "HOUSING UNIT 2" - UPPER LEVEL PLANS

E 110 BUILDING H03 "HOUSING UNIT 3" - LOWER LEVEL PLANS

E 111 BUILDING H03 "HOUSING UNIT 3" - UPPER LEVEL PLANS

E 112 BUILDING H04 "HOUSING UNIT 4" - LOWER LEVEL PLANS

E 113 BUILDING H04 "HOUSING UNIT 4" - UPPER LEVEL PLANS

E 114 BUILDING H05 "HOUSING UNIT 5" - LOWER LEVEL PLANS

E 115 BUILDING H05 "HOUSING UNIT 5" - UPPER LEVEL PLANS

E 116 BUILDING H06 "HOUSING UNIT 6" - LOWER LEVEL PLANS

E 117 BUILDING H06 "HOUSING UNIT 6" - UPPER LEVEL PLANS

E 118 BUILDINGS SMT, AND SPS - FIRST FLOOR PLANS

E 119 BUILDING HAB "HOUSING UNIT AB" - FLOOR PLAN

E 120 BUILDING HCD "HOUSING UNIT CD" - FLOOR PLAN

E 121 BUILDINGS HEF AND HGH "HOUSING UNIT EF AND GH" - FIRST FLOOR PLANS

E 122 BUILDINGS SAD "SOUTH ADMINISTRATION" AND SFS "SOUTH FOOD SERVICE" - FIRST FLOOR PLANS

E 123 BUILDING CHP "CHAPEL" - FIRST AND SECOND FLOOR PLANS

E 401 FIRE ALARM RISER DIAGRAM

SITE LOCATION

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

O C

T O

B E

R

Z Z

Z

Z Z

Z

Z Z

Z

Z Z

Z

Z Z

Z

Z

Z

Z

Z Z

Z

ZZ Z

Z Z

Z

Z

Z Z

Z

Z

Z

Z

Z

Z

Z Z Z Z

Z Z

Z

Z

Z

Z

Z Z Z Z Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z Z

Z

Z

Z Z Z Z Z Z

Z

Z

Z Z

Z

Z Z

Z

Z Z

Z

Z Z Z Z Z ZZ Z

Z Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z

Z Z

Z

Z

Z

Z Z

HEF - "HOUSING UNIT EF"

HCD - "HOUSING UNIT CD"

HAB - "HOUSING UNIT AB"

HGH - "HOUSING UNIT GH"

SPS - "SOUTH PROGRAMS SCHOOL"

SFS - "SOUTH FOOD SERVICE"

WGH - "WEIGHT PIT"

SAD - "SOUTH ADMIN"

CHP - "CHAPEL"

H05 - "HOUSING

UNIT 5"

H04 - "HOUSING

UNIT 4"

H03 - "HOUSING

UNIT 3"

H02 - "HOUSING

UNIT 2"

H01 - "HOUSING

UNIT 1"

H06 - "HOUSING

UNIT 6"

100 - "NORTH

ADMIN"

200 - "FOOD

SERVICE"

300 - "NORTH

PROGRAMS

SCHOOL"

400 - "MSI

INDUSTRIES"

500 - "NORTH

MAINTENANCE

WAREHOUSE"

TAMPER - NORTH WEIGHT PIT CAMERA

TRANSPONDER 8 IN

DOOR - CHAPEL MAINTENANCE

TRANSPONDER 8 IN

FIRE - CHAPEL

TRANSPONDER 8 IN

NIGHT MODE - CHAPEL

TRANSPONDER 8 IN

DOOR - WARDEN/CONFERENCE ROOM

TRANSPONDER 1 IN

DOOR - BACKUP CC

TRANSPONDER 1 IN

DOOR - DEPUTY WARDEN

TRANSPONDER 1 IN

DOOR - RECORDS OFFICE

TRANSPONDER 1 IN

DOOR - PERSONNEL

TRANSPONDER 1 IN

DOOR - BUSINESS OFFICE

TRANSPONDER 1 IN

DOOR - ARSENAL

TRANSPONDER 1 IN

DOOR - WARDEN/SECRETARY SIDE

TRANSPONDER 1 IN

FIRE - 100 BUILDING

TRANSPONDER 2 IN

DOOR - 100 BUILDING MAINTENANCE

TRANSPONDER 2 IN

ZONE 341

TRANSPONDER 3 IN

ZONE 354

TRANSPONDER 3 IN

ZONE 351

TRANSPONDER 3 IN

ZONE 357

TRANSPONDER 3 IN

FIRE ALARM - 200 BUILDING

TRANSPONDER 4 IN

FIRE ALARM - 300 BUILDING

TRANSPONDER 5 IN

NIGHT MODE - 300 BUILDING

TRANSPONDER 5 IN

MECHANICAL 181

TRANSPONDER 5 IN

FIRE - 400 BUILDING MSI

TRANSPONDER 6 IN

DOOR - MSI (194)

TRANSPONDER 6 IN

MECHANICAL - MSI 202

TRANSPONDER 6 IN

MECHANICAL - MSI 201

TRANSPONDER 6 IN

MECHANICAL - MSI 203

TRANSPONDER 6 IN

FIRE - 500 BUILDING

TRANSPONDER 7 IN

MECHANICAL - 500 BUILDING 218

TRANSPONDER 7 IN

MECHANICAL - 500 BUILDING 214

TRANSPONDER 7 IN

FIRE - HU1

TRANSPONDER 9 IN

DOOR - HU1

TRANSPONDER 9 IN

MECHANICAL - 247

TRANSPONDER 9 IN

FIRE - HU2

TRANSPONDER 10 IN

DOOR - HU2

TRANSPONDER 10 IN

FIRE - HU3

TRANSPONDER 11 IN

DOOR - HU3

TRANSPONDER 11 IN

FIRE - HU4

TRANSPONDER 12 IN

DOOR - HU4

TRANSPONDER 12 IN

MECHANICAL - HU4 274

TRANSPONDER 12 IN

DOOR - HU5

TRANSPONDER 13 IN

MECHANICAL - HU5 284

TRANSPONDER 13 IN

FIRE - HU5

TRANSPONDER 13 IN

FIRE ALARM - HU6

TRANSPONDER 14 IN

TOWER 1

TOWER 2

SOUTH

MAINTENANCE

SOUTH SALLYPORT ENCLOSURE

MICRO 2

TRANSPONDER 17 IN

MICRO 1

TRANSPONDER 17 IN

TOWER SOUTH

TRANSPONDER 17 IN

TOWER NORTH

TRANSPONDER 17 IN

TOWER GATE 2

TRANSPONDER 17 IN

TOWER GATE 1

TRANSPONDER 17 IN

ZONE 511

TRANSPONDER 19 IN

ZONE 512 G/W

TRANSPONDER 19 IN

DOOR - DEPUTY WARDEN'S OFFICE

TRANSPONDER 20 IN

DOOR - OPT OFFICE

TRANSPONDER 20 IN

DOOR - ADW PROGRAMS

TRANSPONDER 20 IN

DOOR - ARSENAL

TRANSPONDER 20 IN

DOOR - TRAINING PROGRAM

TRANSPONDER 20 IN

DOOR - BUBBLE

TRANSPONDER 20 IN

DOOR - MAIL ROOM

TRANSPONDER 20 IN

DOOR - DEPUTY CONFERENCE

TRANSPONDER 20 IN

DOOR - WEST WAREHOUSE

TRANSPONDER 21 IN

DOOR - EAST WAREHOUSE

TRANSPONDER 21 IN

DOOR - ERT OVERHEAD DOOR

TRANSPONDER 21 IN

DOOR - ERT MAN DOOR

TRANSPONDER 21 IN

DOOR - LOCKSHOP

TRANSPONDER 21 IN

TAMPER - ULTRALINK 21

TRANSPONDER 21 IN

DOOR - 100 BLDG ELECTRIC ROOM

TRANSPONDER 22 IN

DOOR - 100 BLDG TELEPHONE ROOM

TRANSPONDER 22 IN

DURESS - 100 BLDG 2ND FLOOR MENS

TRANSPONDER 22 IN

DURESS - 100 BLDG 2ND FLOOR WOMENS

TRANSPONDER 22 IN

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

GUS HARRISON

CORRECTIONAL

FACILITY SITE

PLAN

17-560.00

ES 101

1" = 80'-0"

GUS HARRISON CORRECTIONAL FACILITY SITE PLAN

BUILDING NAME NO. BUILDING ID

NORTH ADMINISTRATION 100 100

NORTH FOOD SERVICES 200 200

NORTH PROGRAMS SCHOOL 300 300

MSI INDUSTRIES 400 400

NORTH MAINTENANCE WAREHOUSE 500 500

HOUSING UNIT 1 H01

CHAPEL --- CHP

HOUSING UNIT AB --- HAB

BUILDING LEGEND

HOUSING UNIT CD

HOUSING UNIT EF

HOUSING UNIT GH

SOUTH ADMINISTRATION

SOUTH FOOD SERVICE

SOUTH PROGRAMS SCHOOL

SOUTH MAINTENANCE WAREHOUSE

HCD

HEF

HGH

SAD

SFS

SPS

SMT

HOUSING UNIT 2 H02

HOUSING UNIT 3 H03

HOUSING UNIT 4 H04

HOUSING UNIT 5 H05

HOUSING UNIT 6 H06

WEIGHT PIT WGH---

INMATE STORE --- IMS

.1

.R

M P

O c to b e r

INTRUSION SYSTEM POINTS SCHEDULE - EXISTING POINTS

DESCRIPTION TRANSPONDER BUILDING

FIRE - HU1 9 IN H01

MECHANICAL - 247 9 IN H01

DOOR - HU2 10 IN H02

FIRE - HU2 10 IN H02

DOOR - HU3 11 IN H03

FIRE - HU3 11 IN H03

DOOR - HU4 12 IN H04

FIRE - HU4 12 IN H04

MECHANICAL - HU4 274 12 IN H04

DOOR - HU5 13 IN H05

FIRE - HU5 13 IN H05

MECHANICAL - HU5 284 13 IN H05

FIRE ALARM - HU6 14 IN H06

DOOR - ADW PROGRAMS 20 IN SAD

DOOR - ARSENAL 20 IN SAD

DOOR - BUBBLE 20 IN SAD

DOOR - DEPUTY CONFERENCE 20 IN SAD

DOOR - DEPUTY WARDEN'S OFFICE 20 IN SAD

DOOR - MAIL ROOM 20 IN SAD

DOOR - OPT OFFICE 20 IN SAD

DOOR - TRAINING PROGRAM 20 IN SAD

DOOR - EAST WAREHOUSE 21 IN SMT

DOOR - ERT MAN DOOR 21 IN SMT

DOOR - ERT OVERHEAD DOOR 21 IN SMT

DOOR - LOCKSHOP 21 IN SMT

DOOR - WEST WAREHOUSE 21 IN SMT

TAMPER - ULTRALINK 21 21 IN SMT

ZONE 511 19 IN SSE

ZONE 512 G/W 19 IN SSE

MICRO 1 17 IN TOWER 1

MICRO 2 17 IN TOWER 1

TOWER GATE 1 17 IN TOWER 1

TOWER GATE 2 17 IN TOWER 1

TOWER NORTH 17 IN TOWER 1

TOWER SOUTH 17 IN TOWER 1

INTRUSION SYSTEM POINTS SCHEDULE - EXISTING POINTS

DESCRIPTION TRANSPONDER BUILDING

DOOR - 100 BLDG ELECTRIC ROOM 22 IN 100

DOOR - 100 BUILDING MAINTENANCE 2 IN 100

DOOR - 100 BLDG TELEPHONE ROOM 22 IN 100

DOOR - ARSENAL 1 IN 100

DOOR - BACKUP CC 1 IN 100

DOOR - BUSINESS OFFICE 1 IN 100

DOOR - DEPUTY WARDEN 1 IN 100

DOOR - PERSONNEL 1 IN 100

DOOR - RECORDS OFFICE 1 IN 100

DOOR - WARDEN/CONFERENCE ROOM 1 IN 100

DOOR - WARDEN/SECRETARY SIDE 1 IN 100

DURESS - 100 BLDG 2ND FLOOR MENS 22 IN 100

DURESS - 100 BLDG 2ND FLOOR WOMENS 22 IN 100

FIRE - 100 BUILDING 2 IN 100

ZONE 341 3 IN 100

ZONE 351 3 IN 100

ZONE 354 3 IN 100

ZONE 357 3 IN 100

FIRE ALARM - 200 BUILDING 4 IN 200

FIRE ALARM - 300 BUILDING 5 IN 300

MECHANICAL 181 5 IN 300

NIGHT MODE - 300 BUILDING 5 IN 300

DOOR - MSI (194) 6 IN 400

FIRE - 400 BUILDING MSI 6 IN 400

MECHANICAL - MSI 201 6 IN 400

MECHANICAL - MSI 202 6 IN 400

MECHANICAL - MSI 203 6 IN 400

FIRE - 500 BUILDING 7 IN 500

MECHANICAL - 500 BUILDING 214 7 IN 500

MECHANICAL - 500 BUILDING 218 7 IN 500

DOOR - CHAPEL MAINTENANCE 8 IN CHP

FIRE - CHAPEL 8 IN CHP

NIGHT MODE - CHAPEL 8 IN CHP

TAMPER - NORTH WEIGHT PIT CAMERA 8 IN CHP

DOOR - HU1 9 IN H01

INTRUSION SYSTEM POINTS SCHEDULE - NEW POINTS

DESCRIPTION TRANSPONDER BUILDING

FIRE ALARM ALARM H05

FIRE ALARM SUPERVISORY H05

FIRE ALARM TROUBLE H05

FIRE ALARM ALARM H06

FIRE ALARM SUPERVISORY H06

FIRE ALARM TROUBLE H06

FIRE ALARM ALARM HAB

FIRE ALARM SUPERVISORY HAB

FIRE ALARM TROUBLE HAB

FIRE ALARM ALARM HCD

FIRE ALARM SUPERVISORY HCD

FIRE ALARM TROUBLE HCD

FIRE ALARM ALARM HEF

FIRE ALARM SUPERVISORY HEF

FIRE ALARM TROUBLE HEF

FIRE ALARM ALARM HGH

FIRE ALARM SUPERVISORY HGH

FIRE ALARM TROUBLE HGH

FIRE ALARM ALARM SAD

FIRE ALARM SUPERVISORY SAD

FIRE ALARM TROUBLE SAD

FIRE ALARM ALARM SFS

FIRE ALARM SUPERVISORY SFS

FIRE ALARM TROUBLE SFS

FIRE ALARM ALARM SMT

FIRE ALARM SUPERVISORY SMT

FIRE ALARM TROUBLE SMT

FIRE ALARM ALARM SPS

FIRE ALARM SUPERVISORY SPS

FIRE ALARM TROUBLE SPS

INTRUSION SYSTEM POINTS SCHEDULE - NEW POINTS

DESCRIPTION TRANSPONDER BUILDING

FIRE ALARM ALARM 100

FIRE ALARM SUPERVISORY 100

FIRE ALARM TROUBLE 100

FIRE ALARM ALARM 200

FIRE ALARM SUPERVISORY 200

FIRE ALARM TROUBLE 200

FIRE ALARM ALARM 300

FIRE ALARM SUPERVISORY 300

FIRE ALARM TROUBLE 300

FIRE ALARM ALARM 400

FIRE ALARM SUPERVISORY 400

FIRE ALARM TROUBLE 400

FIRE ALARM ALARM 500

FIRE ALARM SUPERVISORY 500

FIRE ALARM TROUBLE 500

FIRE ALARM ALARM CHP

FIRE ALARM SUPERVISORY CHP

FIRE ALARM TROUBLE CHP

FIRE ALARM ALARM H01

FIRE ALARM SUPERVISORY H01

FIRE ALARM TROUBLE H01

FIRE ALARM ALARM H02

FIRE ALARM SUPERVISORY H02

FIRE ALARM TROUBLE H02

FIRE ALARM ALARM H03

FIRE ALARM SUPERVISORY H03

FIRE ALARM TROUBLE H03

FIRE ALARM ALARM H04

FIRE ALARM SUPERVISORY H04

FIRE ALARM TROUBLE H04

ISSUED FOR DATE

O C

T O

B E

R

F

OSY

OSY

OSY

OSY

F

F

FF

F

F

F

SD

SD

F

SD

F

F

F

SD

OSY WF

SD

F

SD

F

F

F

SD

DD

SD

SDF

F

F

SD

SD

DD

F

DD

F

V

V

V

F

V

V V

F

V

SD

V V

SD

SD V

SD

SD

F

SD V

F

F F

V

F

V

V

V

F

F

SD

F

F

F

F

F

F

V

V

V

F

V

V

F

V

V

V V

OSY OSY

OSY OSY

V

F

V

OSY

WF

SD

F

SD

SD F

SD

SD

F

V

V

V

V

F

F

V

F

SDF

SD

V

F

FF

F

DD

DD

SD

R6

F

V

F

F

SD

V

FAA

FACP

OFFICE

ADMIN. SEC.

PANTRY

TOILET

WARDEN

WARDENS

CONFERENCE ROOM

INSPECTORS OFFICE

JC

KITCHEN

CONF. ROOM

18A

OFFICE

DEPUTY WARDEN

OFFICE

DEPUTY WARDEN

OFFICE

SECRETARY OFFICE

CAPTAINS OFFICE

TOILET

TOILET

PHONE/VIDEO

OFFICE

HEARINGS OFFICE

SHAKE-DOWN

VESTIBULE

ARSENAL

STORAGE

STORAGE

UTILITY CLOSET

VISITING ROOM

VISITING ROOM

STORAGE

UTILITY CLOSET

TOILET

CLOSET

VIDEO CONF.

JC

SHOWER

TOILET

TOILET

50-1

BUBBLE

MUSTER ROOM

MCO OFFICE

VISITING ROOM

STORAGE

CONTROL CENTER

EM

LOCKERS

LOBBY

NON-CONTACT

VISITING

ELEVATOR

109-2

ELEV. MACH. ROOM

FILE ROOM

WARDEN SEC

DEPUTY WARDEN

FAA

OFFICE

OFFICE

TOOL ROOM

SUPER PERSONNEL

OFFICE

TELEPHONE ROOM

110 BACK UP C.C.

ELECTRICAL

TRAINING ROOM

TOILET

JC

TOILET

RECORDS OFFICE

STORAGE

STAFF LOUNGE

H.R. PERSONNEL

STAFF

ELEVATOR

109-1

MECH. ROOM

OFFICE

MAILROOM

OFFICE

OFFICE

OFFICE

OFFICE

CONF. ROOM

BUSINESS OFFICE

OFFICE

TC-A

FACP

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING 100

"NORTH

ADMINISTRATION"

- FIRST AND

SECOND FLOOR

PLANS

17-560.00

E 101

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

1/16" = 1'-0"

BUILDING 100 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 100 SECOND FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 100 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

BUILDING 100 SECOND FLOOR FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

A-1

SD

SD

SD

FF

SD

F

SD

F

SD

F

F

SD

SD

SD

SD

F

F

OSY WF

OSY

F

SD

SD

SD

SD

SD

SD

F

SD

SD

F

SD

SD

F

F

F

SDSD

F

F

F

F F

F

F

F

F

F F

F

SDSD

SD

SD SD

SD

SD

SD

SD

F

F

OSY

WF

DD

DD

DD

DD

F

F

F

F

F

F

F

F

F F F

F

F

V

SD

F

FV

SD

V

F

V

F

F

V

F

HD

FF

F

F

F

F

F

F

V

F

V

V

V

V

V

V

F

VSD

SD V

V

V V

V V

V V

SD

HD

HD

HD

SD

SD SD

SD SDSD

SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

V SD

V SD

SD

HD

SD

V

V

SD

V

F

V

OSY

OSY

WF

SD

SD

SD

V

F

F

V

F

F

SD

SD

SD

SD

SD

SD

HD

SD

F

SD

SD

SD

SD

SD SD

F

SD

F

OSY

WF

DD

DD DD DD

SD

R1

F

F

F

FOOD

SUPPRESSION

AHU-4

AHU-3

AHU-2

AHU-1

FACP

LAUNDRY / PAPER

SUPPLY

BACK DOCK

CUTTING ROOM

OFFICE

TOOL ROOM

TOOL ROOM

JC

JC

CONTROL

HEARINGS ROOM

TOILET

73-1

LOCKER ROOM

TOOL ROOM

TOILET

JC

WALK-IN FREEZER

RUM OFFICE

RN SUPER OFFICE

PHARMACY TECH

OFFICE

SOCIAL WORK

TOILET

N. MEDICINE ROOM

MED. ROOM

MEDICAL RECORDS

MEDICAL RECORDS

DIETICIAN

P.A. OFFICE

DR. OFFICE

EXAM

OPTOMETRY

JC

TOILET

23TOILET

OTC MED. ROOM

KITCHEN

CAUSTICS STORAGE

TOILET

EMERGENCY ROOM

OFFICE

ISSUE / STOR.

SHAKE-DOWN

MECH. ROOM

HEALTH SERVICES

DRESS-IN ROOM

SHOWER

STAFF TLT & LKR

ROOM

PROPERTY ROOM

SEGREGATED

SHOWER

INTAKE SHOWER

HCP INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

HCP INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

INMATE

20 INMATE

INMATE

JC

LAB

DENTIST

POT WASHING

OFFICE CLERK

DISH WASHING

HOT FOOD

DINING ROOM

4-1

SERVERY

COMMISSARY

WALK-IN COOLER

SEC OFFICE

HUM OFFICE

X-RAY

X-RAY LAB

PRISONER HOLDING

OPT. OFFICE

SEC OFFICE

OPT PSYC OFFICE

CONF. ROOM

OPT. OFFICE

CLOSET

FAA

HOOD

SUPRESSION

ELEC. EQUIP. ROOM

MECH. EQUIP.

ROOM

MEZZANINE

FACP

TC-A

2 2

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING 200

"NORTH FOOD

SERVICES" -

FIRST AND

SECOND FLOOR

PLANS

17-560.00

E 102

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING 200 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 200 SECOND FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 200 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

BUILDING 200 SECOND FLOOR FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

SDSD

SDSD

SD

SD

SD

SD

F

F

F

F

F

F

OSY

OSY

OSY

F FF F

F

F F FF F

WF

SDF SD SD SD SD

WF

OSY

F F

F

DD

DD DD

DD

DD

DD

F

FSD SDSDSD

SD

V V

F

V

SD

SD

SD

OSY

WF

DD

DD

DD

DD DD

DD

R1

F

F

F F

FF

F

F F

F

F

F

V

F

FF

F

F F

F

F

SD

V

V

V

V

SD

V

V V

VSD

V V

F

VV

V

V V

V

V V

V

V

V

F

F

F

V

V SD

V

V

F F

V

V

V

V

V

V

SD

SD

OSY

OSY

OSY

V

V

VV

V

V

F

F

V

V

SD

WF

HD

HD

FAA

HOOD

SUPRESSION

FACP

AHU-1

AHU-2 AHU-5

AHU-3

AHU-4

MECH. ROOM

ELECTRICAL

FACP

TC-A 1

GYM

1-1

STORAGE / JC

TOILET

CPC OFFICE

JC

TOILET & SHOWER

REC THERAPY/

O.P.T. PROGRAMS

ROOM

5PROPERTY ROOM

SHOWER

REC. INMATE

LOCKER & TOILET

MECH. ROOM

C.P.C OFFICE

G.E.D.

STORAGE

TOILET

73-2

TOILET

STORAGE

STORAGE

TOILET

STORAGE

TOILET

STORAGE

TOILET

TOILET

SCHOOL PRINCIPAL

SUITE

OFFICE

OFFICE

OFFICE

STORAGE

LIBRARIAN

TOILET

50-2

BARBER

TOILET

CULINARY ARTS

CULINARY ARTS

JC

TOILET

SUPERVISOR

OFFICE

STORAGE

OPTICAL SUPT.

CLASSROOM

TOILET

STORAGE

TOILET

MSI OPTICAL LAB

STORAGE

STORAGE

TOILET

TOILET

MSI OPTICAL

CLASSROOM

OPT. OFFICE

OPT. OFFICE

OPT. OFFICE

PAROLE AGENT

MPRI OFFICE

SUBSTANCE ABUSE

OFFICE

CLASSIFICATION

OFFICE

H.I.

GREIV. OFFICE

OPT. PSYC OFFICE

OFFICE

TOOL ROOM

OPT. OFFICE

LIBRARY

CLASSROOM

CLASSROOM

CLASSROOM

CLASSROOM

CPC

H.I. GREIVANCE

HOOD

SUPRESSION

FAA

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING 300

"NORTH

PROGRAMS

SCHOOL" -

FIRST AND

SECOND FLOOR

PLANS

17-560.00

E 103

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING 300 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 300 SECOND FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 300 SECOND FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

BUILDING 300 FIRST FLOOR FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

F F

F

F

DD

OSY

OSY

WF

DD DD DD

F F

F

DD DD DD

DD

DD

F F

F

F

V

V SD F SD

V V

F

F F F

F

F F F

SD

SD

DD WF OSY

OSY

R2

V

F

F

V

F

F

V

F

F

V

DD DD DD

DD DD DD

DD

DD

FAA

FACP

HYDROLICS SUPER

400-18

MECH. ROOM

400-21

ELECTRICAL

400-20

TOOL ROOM

400-23

STORAGE

400-25

STORAGE

400-24

SCREEN PRINT

SUPER

400-14

INKING SUPER

400-26

WAREHOUSE SUPER

OFFICE

400-7

INMATE CLERK

OFFICE

400-5

OFFICERS STATION

400-2

INMATE CLERK

OFFICE

400-3

SUPT. OFFICE

400-4

INMATE CLERK

OFFICE

400-6

TOILET

400-11

CLOSET

400-10

PACKAGING DEPT.

SUPER

400-12

SHREDDER

400-1

TOOL CRIB

400-22

WAREHOUSE

400-13

TOOL & DIE ROOM

400-19

OVEN SYSTEM AREA

400-15

PRESS AREA

400-16

STOCK AREA

400-17

FAA

TC-A

FACP

2 2

2 1

PENDANT HANG DEVICES ON A STEM DOWN TO 20' ABOVE FINISHED FLOOR

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING 400

"MSI

INDUSTRIES" -

FIRST FLOOR

PLAN

17-560.00

E 104

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING 400 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 400 FIRST FLOOR FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

DD

WF

OSY

F

F

DD

F

F

F

F

F

DD

F

F

F

F

SD

FF

SD SD

F

SD

DD

DD

OSY

F

F

F

F

F

F

FFFF

SD SDFF

SD

V

V

SD

SD

V

F

V

V

F

DD

DD

DD

DD

DD

WF

OSY

R2

SD

SD

F

V

V

V

F

SD SD

SDSD

SD SD SD

VF

F

FV

OSY

HD

FF

F

F

FACP

FAA

FREEZER

500-23

COOLER

500-22

FREEZER

500-2

LOCKSHOP

500-21

LOCKSHOP

500-26

GENERATOR

500-17

MECHANICAL /

ELECTRICAL

500-1

SUPER OFFICE

500-14

JC

500-16 TOILET

500-18

TOILET

500-15

TOOL ROOM

500-20

SHOP AREA

500-4

SUPER OFFICE

500-6

S.A.T. ROOM

500-7

SEC OFFICE

500-12

SUPT. OFFICE

500-11

VESTIBULE

500-13

STAFF CLOTHING

500-24

WAREHOUSE

500-3

SUPPLIES

500-25

TOILET

500-10

TOILET

500-19

GARAGE AREA

500-5

FACP

TC-A

FAA

MEZZANINE

500-27

MEZZANINE

500-28

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDINGS 500

"NORTH

MAINTENANCE

WAREHOUSE" -

FIRST FLOOR

PLANS

17-560.00

E 105

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING 500 FIRST FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 500 FIRST FLOOR FIRE ALARM PLAN

1/16" = 1'-0"

BUILDING 500 MEZZANINE FLOOR DEMOLITION PLAN

1/16" = 1'-0"

BUILDING 500 MEZZANINE FLOOR FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

SD

SD

SD

SD

SD

SD

F

F

F

SDSD SDSDSDSD

F

F

F

F

F F

SD

SD

SD SD SD SD SD

SD

SD

SD

SD

SD

INMATE

1-113

INMATE

1-112

INMATE

1-111

INMATE

1-110

INMATE

1-109

INMATE

1-108

INMATE

1-107

INMATE

1-106

INMATE

1-105

INMATE

1-104

INMATE

1-103

INMATE

1-102

INMATE

1-101

JC

1-191

INMATE

1-160

INMATE

1-159

INMATE

1-158

INMATE

1-157

INMATE

1-156

INMATE

1-155

INMATE

1-154

HCP INMATE

1-153

INMATE

1-152

INMATE

1-151

INMATE

1-150

INMATE

1-149

INMATE

1-148

JC

1-186

SHOWER

1-193

SHOWER

1-188

TOILET

1-187

TOILET

1-192

INMATE

1-146

INMATE

1-145

INMATE

1-144

INMATE

1-143

INMATE

1-142

INMATE

1-141

HCP INMATE

1-140

INMATE

1-139

INMATE

1-138

INMATE

1-137

INMATE

1-136

INMATE

1-135

INMATE

1-134

INMATE

1-133

INMATE

1-132

INMATE

1-131

INMATE

1-147

INMATE

1-130

INMATE

1-129

INMATE

1-128

INMATE

1-127

INMATE

1-126

INMATE

1-125

INMATE

1-124

INMATE

1-123

INMATE

1-122

INMATE

1-121

INMATE

1-120

INMATE

1-119

INMATE

1-118

INMATE

1-117

INMATE

1-116

INMATE

1-115

INMATE

1-114

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING H01

"HOUSING UNIT

1" - LOWER

LEVEL PLANS

17-560.00

E 106

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING H01 "HOUSING UNIT 1" LOWER LEVEL DEMOLITION PLAN

1/16" = 1'-0"

BUILDING H01 "HOUSING UNIT 1" LOWER LEVEL FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

SD

SD

SD

SD

SD

F

F

F

SDSD SDSDSDSD

SD

SD

SD

SD

D H

D H

SD

F F

SD

F

SD

SD

SD

SD

F

SD

D D

SD F

F

F

SD

SDD

H

D H

O

SY

O

SY

W F

F

F

F

OSY

OSY

OSY

OSY

F

F

F F

SD

SD

F

HD

F

F

SD

SD

R1

SD

V

F

SD

F

DD

W F

O

SY

O

SY

SD

F

V

F

F

F

SD

SD

SD

SD

SD

SD SD SD SD SD

SD

SD

SD

SD

SD

SD

F

F

F

SD

SD

WF

WF

WF

WF

FAA

FACP

ACTIVITIES

1-176

MIDDLE ACTIVITY

ROOM

1-175

QUIET ROOM

1-173

INMATE

1-213

INMATE

1-212

INMATE

1-211

INMATE

1-210

INMATE

1-209

INMATE

1-208

INMATE

1-207

INMATE

1-206

INMATE

1-205

INMATE

1-204

INMATE

1-203

INMATE

1-202

INMATE

1-201

JC

1-267

LAUNDRY

1-179

STORAGE

1-169

INMATE

1-260

INMATE

1-259

INMATE

1-258

INMATE

1-257

INMATE

1-256

INMATE

1-255

INMATE

1-254

INMATE

1-253

INMATE

1-252

INMATE

1-251

INMATE

1-250

INMATE

1-249

INMATE

1-248

JC

1-262

MECH. ROOM

1-171

ELECTRICAL

1-170

JC

1-182

ARUS OFFICE

1-181

ARUS OFFICE

1-178

TOILET

1-177

SHOWER

1-269

SHOWER

1-264

TOILET

1-263

TOILET

1-268

RUM OFFICE

1-180

INMATE

1-246

INMATE

1-245

INMATE

1-244

INMATE

1-243

INMATE

1-242

INMATE

1-241

INMATE

1-240

INMATE

1-239

INMATE

1-238

INMATE

1-237

INMATE

1-236

INMATE

1-235

INMATE

1-234

INMATE

1-233

INMATE

1-232

INMATE

1-231

INMATE

1-247

INMATE

1-230

INMATE

1-229

INMATE

1-228

INMATE

1-227

INMATE

1-226

INMATE

1-225

INMATE

1-224

INMATE

1-223

INMATE

1-222

INMATE

1-221

INMATE

1-220

INMATE

1-219

INMATE

1-218

INMATE

1-217

INMATE

1-216

INMATE

1-215

INMATE

1-214

FAA

FACP

TC-A

10 A-1

A-1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING H01

"HOUSING UNIT

1" - UPPER

LEVEL PLANS

17-560.00

E 107

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS DEMOLITION PLAN

1/16" = 1'-0"

BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

A-1

O C

T O

B E

R

F

F

F

SD

SD

SD

SD

SD

SD

SDSDSDSDSD F

F

F

F

F F

SD

SD

SD

SD

SD

SD

SD

SD SD SD SD SD

INMATE

2-113

INMATE

2-112

INMATE

2-111

INMATE

2-110

INMATE

2-109

INMATE

2-108

INMATE

2-107

INMATE

2-106

INMATE

2-105

INMATE

2-104

INMATE

2-103

INMATE

2-102

INMATE

2-101

JC

2-191

INMATE

2-160

INMATE

2-159

INMATE

2-158

INMATE

2-157

INMATE

2-156

INMATE

2-155

INMATE

2-154

INMATE

2-153

INMATE

2-152

INMATE

2-151

INMATE

2-150

INMATE

2-149

INMATE

2-148

JC

2-186

SHOWER

2-193

SHOWER

2-188

TOILET

2-187

TOILET

2-192

INMATE

2-146

INMATE

2-145

INMATE

2-144

INMATE

2-143

INMATE

2-142

INMATE

2-141

INMATE

2-140

INMATE

2-139

INMATE

2-138

INMATE

2-137

INMATE

2-136

INMATE

2-135

INMATE

2-134

INMATE

2-133

INMATE

2-132

INMATE

2-131

INMATE

2-147

INMATE

2-130

INMATE

2-129

INMATE

2-128

INMATE

2-127

INMATE

2-126

INMATE

2-125

INMATE

2-124

INMATE

2-123

INMATE

2-122

INMATE

2-121

INMATE

2-120

INMATE

2-119

INMATE

2-118

INMATE

2-117

INMATE

2-116

INMATE

2-115

INMATE

2-114

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING H02

"HOUSING UNIT

2" - LOWER

LEVEL PLANS

17-560.00

E 108

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.

6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED

CEILINGS.

7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE

(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.

1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER

SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.

2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR

SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE

ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.

3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW

FIRE ALARM SYSTEM.

4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION

REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.

PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.

5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING

HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.

6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE

FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS

MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO

EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING

CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.

7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM

SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR

A COMPLETE INSTALLATION.

8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS

INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER

OBJECTS IN HIGH TRAFFIC AREAS.

9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT

FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.

10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL

PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW

CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A

COMPLETE INSTALLATION.

GUS HARRISON

CORRECTIONAL FACILITY

KEY PLAN

SCALE: NO SCALE

0'

10'

20'

30' 50'

GRAPHIC SCALE

H01

H02HO3

H04

CHP

SMT

HCD

SAD

SPS

SFS

H05

H06

HAB

HEF

HGH

1/16" = 1'-0"

BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL DEMOLITION PLAN

1/16" = 1'-0"

BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL FIRE ALARM PLAN

.1

.R

M P

A U

G U

S T

ISSUED FOR DATE

ADDENDUM 1 11/05/18

O C

T O

B E

R

F

F

F

SD

SD

SD

SD

D H

D H

SD

F

F

SD

F

F

SD

DD

SD

F

F

F

SD

SD

D H

D H

O

SYO

SYW

F

SD

SD

SD

SD

SD

SDSDSDSDSD

SD

SD

SD

SD

SD

F

F

F

OSY

OSY

OSY

OSY

F

F

F F

SD

SD

F F

V

SD

F

SD DD

W F

O

SY

O

SY

SD

V

R1

F

SD

F

F

F

HD

SD

F

F

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD SD SD SD SD

F

F

F

SD

SD

SD

WFWF

WFWF

FAA

FACP

ACTIVITIES

2-176

MIDDLE ACTIVITY

ROOM

2-175

QUIET ROOM

2-173

INMATE

2-213

INMATE

2-212

INMATE

2-211

INMATE

2-210

INMATE

2-209

INMATE

2-208

INMATE

2-207

INMATE

2-206

INMATE

2-205

INMATE

2-204

INMATE

2-203

INMATE

2-202

INMATE

2-201

JC

2-267

LAUNDRY

2-179

STORAGE

2-169

INMATE

2-260

INMATE

2-259

INMATE

2-258

INMATE

2-257

INMATE

2-256

INMATE

2-255

INMATE

2-254

INMATE

2-253

INMATE

2-252

INMATE

2-251

INMATE

2-250

INMATE

2-249

INMATE

2-248

JC

2-262

MECH. ROOM

2-171

ELECTRICAL

2-170

JC

2-182

ARUS OFFICE

2-181

ARUS OFFICE

2-178

TOILET

2-177

SHOWER

2-269

SHOWER

2-264

TOILET

2-263

TOILET

2-268

RUM OFFICE

2-180

INMATE

2-246

INMATE

2-245

INMATE

2-244

INMATE

2-243

INMATE

2-242

INMATE

2-241

INMATE

2-240

INMATE

2-239

INMATE

2-238

INMATE

2-237

INMATE

2-236

INMATE

2-235

INMATE

2-234

INMATE

2-233

INMATE

2-232

INMATE

2-231

INMATE

2-247

INMATE

2-230

INMATE

2-229

INMATE

2-228

INMATE

2-227

INMATE

2-226

INMATE

2-225

INMATE

2-224

INMATE

2-223

INMATE

2-222

INMATE

2-221

INMATE

2-220

INMATE

2-219

INMATE

2-218

INMATE

2-217

INMATE

2-216

INMATE

2-215

INMATE

2-214

FACP

TC-A

FAA

A-1

A-1

F

IL

E N

U M

B E

R

S T

A T

E I N

D E

X N

U M

B E

R S

C o ns tr uc tio n

F in a l R e co rd

Is su e d f o r

P re lim in a ry

D a te

D E

S

IG

N A

N D

C O

N S

T R

U C

T

IO

N D

IV

IS

IO

N

D E

P A

R T

M E

N T

O F

T E

C H

N O

L O

G Y

M

A N

A G

E M

E N

T A

N D

B U

D G

E T

S T

A T

E O

F M

IC

H

IG

A

N

R O

B E

R T

C H

A L L R

A N

C A

R B

D

IR

E

C T

O R

S T

A T

E F

A C

IL

IT

IE

S

A D

M

IN

IS

T

R A

T

IO

N

Tower Pinkster Titus Associates Inc.

242 East Kalamazoo Avenue, Suite 200

Kalamazoo, Michigan 49007-5828

269.343.6133 PHONE 269.343.6633 FAX

TOWERPINKSTER.COM

ALL RIGHTS RESERVED2018©

DATE

PROJECT TITLE

SHEET TITLE

SHEET NUMBER

4 East Fulton Street, Suite 200

Grand Rapids, Michigan 49503

616.456.9944 PHONE 616.456.5936 FAX

OCTOBER 2, 2018

GUS HARRISON

CORRECTIONAL

FACILITY FIRE

ALARM

UPGRADE

Adrian, Michigan

BUILDING H02

"HOUSING UNIT

2" - UPPER

LEVEL PLANS

17-560.00

E 109

GENERAL ELECTRICAL NOTES

ELECTRICAL KEYED NOTES

1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND

NOT REPLACED.

2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED

EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,

ADJUST CIRCUIT SIZE AS REQUIRED.

3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.

4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST

CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.

MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.

5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY

SUPPORT ALL CONDUIT AND LOW…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .