GUS Harrison Drawings 1.pdf
PDF 3 MB Posted
- Solicitation number
- RFQ-171-190000000017-2
- Issued by
- Kalamazoo County, Michigan
About this file
This is a set of architectural and engineering drawings for a fire alarm upgrade project at the Gus Harrison Correctional Facility in Adrian, Michigan, prepared by TowerPinkster for the State of Michigan Department of Corrections. The drawings, which are at 90% review stage as of October 2018, detail plans for upgrading fire alarm systems across multiple buildings including administration buildings, food services, programs school, MSI industries, maintenance warehouse, and multiple housing units. The project includes 23 drawing sheets covering site plans, floor plans for individual buildings, and fire alarm riser diagrams, all designed in accordance with the 2011 National Electrical Code with Michigan amendments.
The drawings indicate extensive modifications to fire alarm and intrusion detection systems throughout the facility, including new fire alarm control panels, smoke detectors, heat detectors, manual pull stations, and associated wiring. The plans show detailed layouts for both existing and new fire alarm devices across multiple floors in various buildings, including housing units that contain inmate cells, administrative areas, and support facilities. The drawings include schedules of existing intrusion system points that will be maintained as well as new points to be added, indicating a comprehensive upgrade of both fire detection and security systems throughout the correctional complex.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement 17395.pdf | ||
| Specifications 1 of 2 17395.pdf | ||
| GUS Harrison Drawings 2.pdf | ||
| Specifications 2 of 2 17395.pdf | ||
| 472.17395.RMP Agenda 2018.10.31.pdf | ||
| Sign In 2018.10.31.pdf | ||
| Gus Harrison Addendum 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
DESIGN TEAM
ARCHITECT/ENGINEER
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
COVER SHEET
17-560.00
G 001
GUS HARRISON CORRECTIONAL FACILITY FIRE ALARM UPGRADE
STATE OF MICHIGAN DEPARTMENT OF
CORRECTIONS
Adrian, Michigan
90% REVIEW DOCUMENTS
REFERENCED CODES
MAPDRAWING INDEX
2011 NATIONAL ELECTRICAL CODE WITH MICHIGAN AMENDMENTS
242 EAST KALAMAZOO
SUITE 200
KALAMAZOO, MICHIGAN 49007
PHONE: 269.343.6133
FAX: 269.343.6633
SITE ADDRESS
GUS HARRISON CORRECTIONAL FACILITY
2727 E BEECHER ST
ADRIAN, MI 49221
GENERAL
G 001 COVER SHEET
ELECTRICAL
ES 101 GUS HARRISON CORRECTIONAL FACILITY SITE PLAN
ELECTRICAL
E 101 BUILDING 100 "NORTH ADMINISTRATION" - FIRST AND SECOND FLOOR PLANS
E 102 BUILDING 200 "NORTH FOOD SERVICES" - FIRST AND SECOND FLOOR PLANS
E 103 BUILDING 300 "NORTH PROGRAMS SCHOOL" - FIRST AND SECOND FLOOR PLANS
E 104 BUILDING 400 "MSI INDUSTRIES" - FIRST FLOOR PLAN
E 105 BUILDINGS 500 "NORTH MAINTENANCE WAREHOUSE" - FIRST FLOOR PLANS
E 106 BUILDING H01 "HOUSING UNIT 1" - LOWER LEVEL PLANS
E 107 BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS
E 108 BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL PLANS
E 109 BUILDING H02 "HOUSING UNIT 2" - UPPER LEVEL PLANS
E 110 BUILDING H03 "HOUSING UNIT 3" - LOWER LEVEL PLANS
E 111 BUILDING H03 "HOUSING UNIT 3" - UPPER LEVEL PLANS
E 112 BUILDING H04 "HOUSING UNIT 4" - LOWER LEVEL PLANS
E 113 BUILDING H04 "HOUSING UNIT 4" - UPPER LEVEL PLANS
E 114 BUILDING H05 "HOUSING UNIT 5" - LOWER LEVEL PLANS
E 115 BUILDING H05 "HOUSING UNIT 5" - UPPER LEVEL PLANS
E 116 BUILDING H06 "HOUSING UNIT 6" - LOWER LEVEL PLANS
E 117 BUILDING H06 "HOUSING UNIT 6" - UPPER LEVEL PLANS
E 118 BUILDINGS SMT, AND SPS - FIRST FLOOR PLANS
E 119 BUILDING HAB "HOUSING UNIT AB" - FLOOR PLAN
E 120 BUILDING HCD "HOUSING UNIT CD" - FLOOR PLAN
E 121 BUILDINGS HEF AND HGH "HOUSING UNIT EF AND GH" - FIRST FLOOR PLANS
E 122 BUILDINGS SAD "SOUTH ADMINISTRATION" AND SFS "SOUTH FOOD SERVICE" - FIRST FLOOR PLANS
E 123 BUILDING CHP "CHAPEL" - FIRST AND SECOND FLOOR PLANS
E 401 FIRE ALARM RISER DIAGRAM
SITE LOCATION
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
O C
T O
B E
R
Z Z
Z
Z Z
Z
Z Z
Z
Z Z
Z
Z Z
Z
Z
Z
Z
Z Z
Z
ZZ Z
Z Z
Z
Z
Z Z
Z
Z
Z
Z
Z
Z
Z Z Z Z
Z Z
Z
Z
Z
Z
Z Z Z Z Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z Z
Z
Z
Z Z Z Z Z Z
Z
Z
Z Z
Z
Z Z
Z
Z Z
Z
Z Z Z Z Z ZZ Z
Z Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z
Z Z
Z
Z
Z
Z Z
HEF - "HOUSING UNIT EF"
HCD - "HOUSING UNIT CD"
HAB - "HOUSING UNIT AB"
HGH - "HOUSING UNIT GH"
SPS - "SOUTH PROGRAMS SCHOOL"
SFS - "SOUTH FOOD SERVICE"
WGH - "WEIGHT PIT"
SAD - "SOUTH ADMIN"
CHP - "CHAPEL"
H05 - "HOUSING
UNIT 5"
H04 - "HOUSING
UNIT 4"
H03 - "HOUSING
UNIT 3"
H02 - "HOUSING
UNIT 2"
H01 - "HOUSING
UNIT 1"
H06 - "HOUSING
UNIT 6"
100 - "NORTH
ADMIN"
200 - "FOOD
SERVICE"
300 - "NORTH
PROGRAMS
SCHOOL"
400 - "MSI
INDUSTRIES"
500 - "NORTH
MAINTENANCE
WAREHOUSE"
TAMPER - NORTH WEIGHT PIT CAMERA
TRANSPONDER 8 IN
DOOR - CHAPEL MAINTENANCE
TRANSPONDER 8 IN
FIRE - CHAPEL
TRANSPONDER 8 IN
NIGHT MODE - CHAPEL
TRANSPONDER 8 IN
DOOR - WARDEN/CONFERENCE ROOM
TRANSPONDER 1 IN
DOOR - BACKUP CC
TRANSPONDER 1 IN
DOOR - DEPUTY WARDEN
TRANSPONDER 1 IN
DOOR - RECORDS OFFICE
TRANSPONDER 1 IN
DOOR - PERSONNEL
TRANSPONDER 1 IN
DOOR - BUSINESS OFFICE
TRANSPONDER 1 IN
DOOR - ARSENAL
TRANSPONDER 1 IN
DOOR - WARDEN/SECRETARY SIDE
TRANSPONDER 1 IN
FIRE - 100 BUILDING
TRANSPONDER 2 IN
DOOR - 100 BUILDING MAINTENANCE
TRANSPONDER 2 IN
ZONE 341
TRANSPONDER 3 IN
ZONE 354
TRANSPONDER 3 IN
ZONE 351
TRANSPONDER 3 IN
ZONE 357
TRANSPONDER 3 IN
FIRE ALARM - 200 BUILDING
TRANSPONDER 4 IN
FIRE ALARM - 300 BUILDING
TRANSPONDER 5 IN
NIGHT MODE - 300 BUILDING
TRANSPONDER 5 IN
MECHANICAL 181
TRANSPONDER 5 IN
FIRE - 400 BUILDING MSI
TRANSPONDER 6 IN
DOOR - MSI (194)
TRANSPONDER 6 IN
MECHANICAL - MSI 202
TRANSPONDER 6 IN
MECHANICAL - MSI 201
TRANSPONDER 6 IN
MECHANICAL - MSI 203
TRANSPONDER 6 IN
FIRE - 500 BUILDING
TRANSPONDER 7 IN
MECHANICAL - 500 BUILDING 218
TRANSPONDER 7 IN
MECHANICAL - 500 BUILDING 214
TRANSPONDER 7 IN
FIRE - HU1
TRANSPONDER 9 IN
DOOR - HU1
TRANSPONDER 9 IN
MECHANICAL - 247
TRANSPONDER 9 IN
FIRE - HU2
TRANSPONDER 10 IN
DOOR - HU2
TRANSPONDER 10 IN
FIRE - HU3
TRANSPONDER 11 IN
DOOR - HU3
TRANSPONDER 11 IN
FIRE - HU4
TRANSPONDER 12 IN
DOOR - HU4
TRANSPONDER 12 IN
MECHANICAL - HU4 274
TRANSPONDER 12 IN
DOOR - HU5
TRANSPONDER 13 IN
MECHANICAL - HU5 284
TRANSPONDER 13 IN
FIRE - HU5
TRANSPONDER 13 IN
FIRE ALARM - HU6
TRANSPONDER 14 IN
TOWER 1
TOWER 2
SOUTH
MAINTENANCE
SOUTH SALLYPORT ENCLOSURE
MICRO 2
TRANSPONDER 17 IN
MICRO 1
TRANSPONDER 17 IN
TOWER SOUTH
TRANSPONDER 17 IN
TOWER NORTH
TRANSPONDER 17 IN
TOWER GATE 2
TRANSPONDER 17 IN
TOWER GATE 1
TRANSPONDER 17 IN
ZONE 511
TRANSPONDER 19 IN
ZONE 512 G/W
TRANSPONDER 19 IN
DOOR - DEPUTY WARDEN'S OFFICE
TRANSPONDER 20 IN
DOOR - OPT OFFICE
TRANSPONDER 20 IN
DOOR - ADW PROGRAMS
TRANSPONDER 20 IN
DOOR - ARSENAL
TRANSPONDER 20 IN
DOOR - TRAINING PROGRAM
TRANSPONDER 20 IN
DOOR - BUBBLE
TRANSPONDER 20 IN
DOOR - MAIL ROOM
TRANSPONDER 20 IN
DOOR - DEPUTY CONFERENCE
TRANSPONDER 20 IN
DOOR - WEST WAREHOUSE
TRANSPONDER 21 IN
DOOR - EAST WAREHOUSE
TRANSPONDER 21 IN
DOOR - ERT OVERHEAD DOOR
TRANSPONDER 21 IN
DOOR - ERT MAN DOOR
TRANSPONDER 21 IN
DOOR - LOCKSHOP
TRANSPONDER 21 IN
TAMPER - ULTRALINK 21
TRANSPONDER 21 IN
DOOR - 100 BLDG ELECTRIC ROOM
TRANSPONDER 22 IN
DOOR - 100 BLDG TELEPHONE ROOM
TRANSPONDER 22 IN
DURESS - 100 BLDG 2ND FLOOR MENS
TRANSPONDER 22 IN
DURESS - 100 BLDG 2ND FLOOR WOMENS
TRANSPONDER 22 IN
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
GUS HARRISON
CORRECTIONAL
FACILITY SITE
PLAN
17-560.00
ES 101
1" = 80'-0"
GUS HARRISON CORRECTIONAL FACILITY SITE PLAN
BUILDING NAME NO. BUILDING ID
NORTH ADMINISTRATION 100 100
NORTH FOOD SERVICES 200 200
NORTH PROGRAMS SCHOOL 300 300
MSI INDUSTRIES 400 400
NORTH MAINTENANCE WAREHOUSE 500 500
HOUSING UNIT 1 H01
CHAPEL --- CHP
HOUSING UNIT AB --- HAB
BUILDING LEGEND
HOUSING UNIT CD
HOUSING UNIT EF
HOUSING UNIT GH
SOUTH ADMINISTRATION
SOUTH FOOD SERVICE
SOUTH PROGRAMS SCHOOL
SOUTH MAINTENANCE WAREHOUSE
HCD
HEF
HGH
SAD
SFS
SPS
SMT
HOUSING UNIT 2 H02
HOUSING UNIT 3 H03
HOUSING UNIT 4 H04
HOUSING UNIT 5 H05
HOUSING UNIT 6 H06
WEIGHT PIT WGH---
INMATE STORE --- IMS
.1
.R
M P
O c to b e r
INTRUSION SYSTEM POINTS SCHEDULE - EXISTING POINTS
DESCRIPTION TRANSPONDER BUILDING
FIRE - HU1 9 IN H01
MECHANICAL - 247 9 IN H01
DOOR - HU2 10 IN H02
FIRE - HU2 10 IN H02
DOOR - HU3 11 IN H03
FIRE - HU3 11 IN H03
DOOR - HU4 12 IN H04
FIRE - HU4 12 IN H04
MECHANICAL - HU4 274 12 IN H04
DOOR - HU5 13 IN H05
FIRE - HU5 13 IN H05
MECHANICAL - HU5 284 13 IN H05
FIRE ALARM - HU6 14 IN H06
DOOR - ADW PROGRAMS 20 IN SAD
DOOR - ARSENAL 20 IN SAD
DOOR - BUBBLE 20 IN SAD
DOOR - DEPUTY CONFERENCE 20 IN SAD
DOOR - DEPUTY WARDEN'S OFFICE 20 IN SAD
DOOR - MAIL ROOM 20 IN SAD
DOOR - OPT OFFICE 20 IN SAD
DOOR - TRAINING PROGRAM 20 IN SAD
DOOR - EAST WAREHOUSE 21 IN SMT
DOOR - ERT MAN DOOR 21 IN SMT
DOOR - ERT OVERHEAD DOOR 21 IN SMT
DOOR - LOCKSHOP 21 IN SMT
DOOR - WEST WAREHOUSE 21 IN SMT
TAMPER - ULTRALINK 21 21 IN SMT
ZONE 511 19 IN SSE
ZONE 512 G/W 19 IN SSE
MICRO 1 17 IN TOWER 1
MICRO 2 17 IN TOWER 1
TOWER GATE 1 17 IN TOWER 1
TOWER GATE 2 17 IN TOWER 1
TOWER NORTH 17 IN TOWER 1
TOWER SOUTH 17 IN TOWER 1
INTRUSION SYSTEM POINTS SCHEDULE - EXISTING POINTS
DESCRIPTION TRANSPONDER BUILDING
DOOR - 100 BLDG ELECTRIC ROOM 22 IN 100
DOOR - 100 BUILDING MAINTENANCE 2 IN 100
DOOR - 100 BLDG TELEPHONE ROOM 22 IN 100
DOOR - ARSENAL 1 IN 100
DOOR - BACKUP CC 1 IN 100
DOOR - BUSINESS OFFICE 1 IN 100
DOOR - DEPUTY WARDEN 1 IN 100
DOOR - PERSONNEL 1 IN 100
DOOR - RECORDS OFFICE 1 IN 100
DOOR - WARDEN/CONFERENCE ROOM 1 IN 100
DOOR - WARDEN/SECRETARY SIDE 1 IN 100
DURESS - 100 BLDG 2ND FLOOR MENS 22 IN 100
DURESS - 100 BLDG 2ND FLOOR WOMENS 22 IN 100
FIRE - 100 BUILDING 2 IN 100
ZONE 341 3 IN 100
ZONE 351 3 IN 100
ZONE 354 3 IN 100
ZONE 357 3 IN 100
FIRE ALARM - 200 BUILDING 4 IN 200
FIRE ALARM - 300 BUILDING 5 IN 300
MECHANICAL 181 5 IN 300
NIGHT MODE - 300 BUILDING 5 IN 300
DOOR - MSI (194) 6 IN 400
FIRE - 400 BUILDING MSI 6 IN 400
MECHANICAL - MSI 201 6 IN 400
MECHANICAL - MSI 202 6 IN 400
MECHANICAL - MSI 203 6 IN 400
FIRE - 500 BUILDING 7 IN 500
MECHANICAL - 500 BUILDING 214 7 IN 500
MECHANICAL - 500 BUILDING 218 7 IN 500
DOOR - CHAPEL MAINTENANCE 8 IN CHP
FIRE - CHAPEL 8 IN CHP
NIGHT MODE - CHAPEL 8 IN CHP
TAMPER - NORTH WEIGHT PIT CAMERA 8 IN CHP
DOOR - HU1 9 IN H01
INTRUSION SYSTEM POINTS SCHEDULE - NEW POINTS
DESCRIPTION TRANSPONDER BUILDING
FIRE ALARM ALARM H05
FIRE ALARM SUPERVISORY H05
FIRE ALARM TROUBLE H05
FIRE ALARM ALARM H06
FIRE ALARM SUPERVISORY H06
FIRE ALARM TROUBLE H06
FIRE ALARM ALARM HAB
FIRE ALARM SUPERVISORY HAB
FIRE ALARM TROUBLE HAB
FIRE ALARM ALARM HCD
FIRE ALARM SUPERVISORY HCD
FIRE ALARM TROUBLE HCD
FIRE ALARM ALARM HEF
FIRE ALARM SUPERVISORY HEF
FIRE ALARM TROUBLE HEF
FIRE ALARM ALARM HGH
FIRE ALARM SUPERVISORY HGH
FIRE ALARM TROUBLE HGH
FIRE ALARM ALARM SAD
FIRE ALARM SUPERVISORY SAD
FIRE ALARM TROUBLE SAD
FIRE ALARM ALARM SFS
FIRE ALARM SUPERVISORY SFS
FIRE ALARM TROUBLE SFS
FIRE ALARM ALARM SMT
FIRE ALARM SUPERVISORY SMT
FIRE ALARM TROUBLE SMT
FIRE ALARM ALARM SPS
FIRE ALARM SUPERVISORY SPS
FIRE ALARM TROUBLE SPS
INTRUSION SYSTEM POINTS SCHEDULE - NEW POINTS
DESCRIPTION TRANSPONDER BUILDING
FIRE ALARM ALARM 100
FIRE ALARM SUPERVISORY 100
FIRE ALARM TROUBLE 100
FIRE ALARM ALARM 200
FIRE ALARM SUPERVISORY 200
FIRE ALARM TROUBLE 200
FIRE ALARM ALARM 300
FIRE ALARM SUPERVISORY 300
FIRE ALARM TROUBLE 300
FIRE ALARM ALARM 400
FIRE ALARM SUPERVISORY 400
FIRE ALARM TROUBLE 400
FIRE ALARM ALARM 500
FIRE ALARM SUPERVISORY 500
FIRE ALARM TROUBLE 500
FIRE ALARM ALARM CHP
FIRE ALARM SUPERVISORY CHP
FIRE ALARM TROUBLE CHP
FIRE ALARM ALARM H01
FIRE ALARM SUPERVISORY H01
FIRE ALARM TROUBLE H01
FIRE ALARM ALARM H02
FIRE ALARM SUPERVISORY H02
FIRE ALARM TROUBLE H02
FIRE ALARM ALARM H03
FIRE ALARM SUPERVISORY H03
FIRE ALARM TROUBLE H03
FIRE ALARM ALARM H04
FIRE ALARM SUPERVISORY H04
FIRE ALARM TROUBLE H04
ISSUED FOR DATE
O C
T O
B E
R
F
OSY
OSY
OSY
OSY
F
F
FF
F
F
F
SD
SD
F
SD
F
F
F
SD
OSY WF
SD
F
SD
F
F
F
SD
DD
SD
SDF
F
F
SD
SD
DD
F
DD
F
V
V
V
F
V
V V
F
V
SD
V V
SD
SD V
SD
SD
F
SD V
F
F F
V
F
V
V
V
F
F
SD
F
F
F
F
F
F
V
V
V
F
V
V
F
V
V
V V
OSY OSY
OSY OSY
V
F
V
OSY
WF
SD
F
SD
SD F
SD
SD
F
V
V
V
V
F
F
V
F
SDF
SD
V
F
FF
F
DD
DD
SD
R6
F
V
F
F
SD
V
FAA
FACP
OFFICE
ADMIN. SEC.
PANTRY
TOILET
WARDEN
WARDENS
CONFERENCE ROOM
INSPECTORS OFFICE
JC
KITCHEN
CONF. ROOM
18A
OFFICE
DEPUTY WARDEN
OFFICE
DEPUTY WARDEN
OFFICE
SECRETARY OFFICE
CAPTAINS OFFICE
TOILET
TOILET
PHONE/VIDEO
OFFICE
HEARINGS OFFICE
SHAKE-DOWN
VESTIBULE
ARSENAL
STORAGE
STORAGE
UTILITY CLOSET
VISITING ROOM
VISITING ROOM
STORAGE
UTILITY CLOSET
TOILET
CLOSET
VIDEO CONF.
JC
SHOWER
TOILET
TOILET
50-1
BUBBLE
MUSTER ROOM
MCO OFFICE
VISITING ROOM
STORAGE
CONTROL CENTER
EM
LOCKERS
LOBBY
NON-CONTACT
VISITING
ELEVATOR
109-2
ELEV. MACH. ROOM
FILE ROOM
WARDEN SEC
DEPUTY WARDEN
FAA
OFFICE
OFFICE
TOOL ROOM
SUPER PERSONNEL
OFFICE
TELEPHONE ROOM
110 BACK UP C.C.
ELECTRICAL
TRAINING ROOM
TOILET
JC
TOILET
RECORDS OFFICE
STORAGE
STAFF LOUNGE
H.R. PERSONNEL
STAFF
ELEVATOR
109-1
MECH. ROOM
OFFICE
MAILROOM
OFFICE
OFFICE
OFFICE
OFFICE
CONF. ROOM
BUSINESS OFFICE
OFFICE
TC-A
FACP
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING 100
"NORTH
ADMINISTRATION"
- FIRST AND
SECOND FLOOR
PLANS
17-560.00
E 101
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
1/16" = 1'-0"
BUILDING 100 FIRST FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 100 SECOND FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 100 FIRST FLOOR FIRE ALARM PLAN
1/16" = 1'-0"
BUILDING 100 SECOND FLOOR FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
A-1
SD
SD
SD
FF
SD
F
SD
F
SD
F
F
SD
SD
SD
SD
F
F
OSY WF
OSY
F
SD
SD
SD
SD
SD
SD
F
SD
SD
F
SD
SD
F
F
F
SDSD
F
F
F
F F
F
F
F
F
F F
F
SDSD
SD
SD SD
SD
SD
SD
SD
F
F
OSY
WF
DD
DD
DD
DD
F
F
F
F
F
F
F
F
F F F
F
F
V
SD
F
FV
SD
V
F
V
F
F
V
F
HD
FF
F
F
F
F
F
F
V
F
V
V
V
V
V
V
F
VSD
SD V
V
V V
V V
V V
SD
HD
HD
HD
SD
SD SD
SD SDSD
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
V SD
V SD
SD
HD
SD
V
V
SD
V
F
V
OSY
OSY
WF
SD
SD
SD
V
F
F
V
F
F
SD
SD
SD
SD
SD
SD
HD
SD
F
SD
SD
SD
SD
SD SD
F
SD
F
OSY
WF
DD
DD DD DD
SD
R1
F
F
F
FOOD
SUPPRESSION
AHU-4
AHU-3
AHU-2
AHU-1
FACP
LAUNDRY / PAPER
SUPPLY
BACK DOCK
CUTTING ROOM
OFFICE
TOOL ROOM
TOOL ROOM
JC
JC
CONTROL
HEARINGS ROOM
TOILET
73-1
LOCKER ROOM
TOOL ROOM
TOILET
JC
WALK-IN FREEZER
RUM OFFICE
RN SUPER OFFICE
PHARMACY TECH
OFFICE
SOCIAL WORK
TOILET
N. MEDICINE ROOM
MED. ROOM
MEDICAL RECORDS
MEDICAL RECORDS
DIETICIAN
P.A. OFFICE
DR. OFFICE
EXAM
OPTOMETRY
JC
TOILET
23TOILET
OTC MED. ROOM
KITCHEN
CAUSTICS STORAGE
TOILET
EMERGENCY ROOM
OFFICE
ISSUE / STOR.
SHAKE-DOWN
MECH. ROOM
HEALTH SERVICES
DRESS-IN ROOM
SHOWER
STAFF TLT & LKR
ROOM
PROPERTY ROOM
SEGREGATED
SHOWER
INTAKE SHOWER
HCP INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
HCP INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
INMATE
20 INMATE
INMATE
JC
LAB
DENTIST
POT WASHING
OFFICE CLERK
DISH WASHING
HOT FOOD
DINING ROOM
4-1
SERVERY
COMMISSARY
WALK-IN COOLER
SEC OFFICE
HUM OFFICE
X-RAY
X-RAY LAB
PRISONER HOLDING
OPT. OFFICE
SEC OFFICE
OPT PSYC OFFICE
CONF. ROOM
OPT. OFFICE
CLOSET
FAA
HOOD
SUPRESSION
ELEC. EQUIP. ROOM
MECH. EQUIP.
ROOM
MEZZANINE
FACP
TC-A
2 2
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING 200
"NORTH FOOD
SERVICES" -
FIRST AND
SECOND FLOOR
PLANS
17-560.00
E 102
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING 200 FIRST FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 200 SECOND FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 200 FIRST FLOOR FIRE ALARM PLAN
1/16" = 1'-0"
BUILDING 200 SECOND FLOOR FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
SDSD
SDSD
SD
SD
SD
SD
F
F
F
F
F
F
OSY
OSY
OSY
F FF F
F
F F FF F
WF
SDF SD SD SD SD
WF
OSY
F F
F
DD
DD DD
DD
DD
DD
F
FSD SDSDSD
SD
V V
F
V
SD
SD
SD
OSY
WF
DD
DD
DD
DD DD
DD
R1
F
F
F F
FF
F
F F
F
F
F
V
F
FF
F
F F
F
F
SD
V
V
V
V
SD
V
V V
VSD
V V
F
VV
V
V V
V
V V
V
V
V
F
F
F
V
V SD
V
V
F F
V
V
V
V
V
V
SD
SD
OSY
OSY
OSY
V
V
VV
V
V
F
F
V
V
SD
WF
HD
HD
FAA
HOOD
SUPRESSION
FACP
AHU-1
AHU-2 AHU-5
AHU-3
AHU-4
MECH. ROOM
ELECTRICAL
FACP
TC-A 1
GYM
1-1
STORAGE / JC
TOILET
CPC OFFICE
JC
TOILET & SHOWER
REC THERAPY/
O.P.T. PROGRAMS
ROOM
5PROPERTY ROOM
SHOWER
REC. INMATE
LOCKER & TOILET
MECH. ROOM
C.P.C OFFICE
G.E.D.
STORAGE
TOILET
73-2
TOILET
STORAGE
STORAGE
TOILET
STORAGE
TOILET
STORAGE
TOILET
TOILET
SCHOOL PRINCIPAL
SUITE
OFFICE
OFFICE
OFFICE
STORAGE
LIBRARIAN
TOILET
50-2
BARBER
TOILET
CULINARY ARTS
CULINARY ARTS
JC
TOILET
SUPERVISOR
OFFICE
STORAGE
OPTICAL SUPT.
CLASSROOM
TOILET
STORAGE
TOILET
MSI OPTICAL LAB
STORAGE
STORAGE
TOILET
TOILET
MSI OPTICAL
CLASSROOM
OPT. OFFICE
OPT. OFFICE
OPT. OFFICE
PAROLE AGENT
MPRI OFFICE
SUBSTANCE ABUSE
OFFICE
CLASSIFICATION
OFFICE
H.I.
GREIV. OFFICE
OPT. PSYC OFFICE
OFFICE
TOOL ROOM
OPT. OFFICE
LIBRARY
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CPC
H.I. GREIVANCE
HOOD
SUPRESSION
FAA
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING 300
"NORTH
PROGRAMS
SCHOOL" -
FIRST AND
SECOND FLOOR
PLANS
17-560.00
E 103
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING 300 FIRST FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 300 SECOND FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 300 SECOND FLOOR FIRE ALARM PLAN
1/16" = 1'-0"
BUILDING 300 FIRST FLOOR FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
F F
F
F
DD
OSY
OSY
WF
DD DD DD
F F
F
DD DD DD
DD
DD
F F
F
F
V
V SD F SD
V V
F
F F F
F
F F F
SD
SD
DD WF OSY
OSY
R2
V
F
F
V
F
F
V
F
F
V
DD DD DD
DD DD DD
DD
DD
FAA
FACP
HYDROLICS SUPER
400-18
MECH. ROOM
400-21
ELECTRICAL
400-20
TOOL ROOM
400-23
STORAGE
400-25
STORAGE
400-24
SCREEN PRINT
SUPER
400-14
INKING SUPER
400-26
WAREHOUSE SUPER
OFFICE
400-7
INMATE CLERK
OFFICE
400-5
OFFICERS STATION
400-2
INMATE CLERK
OFFICE
400-3
SUPT. OFFICE
400-4
INMATE CLERK
OFFICE
400-6
TOILET
400-11
CLOSET
400-10
PACKAGING DEPT.
SUPER
400-12
SHREDDER
400-1
TOOL CRIB
400-22
WAREHOUSE
400-13
TOOL & DIE ROOM
400-19
OVEN SYSTEM AREA
400-15
PRESS AREA
400-16
STOCK AREA
400-17
FAA
TC-A
FACP
2 2
2 1
PENDANT HANG DEVICES ON A STEM DOWN TO 20' ABOVE FINISHED FLOOR
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING 400
"MSI
INDUSTRIES" -
FIRST FLOOR
PLAN
17-560.00
E 104
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING 400 FIRST FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 400 FIRST FLOOR FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
DD
WF
OSY
F
F
DD
F
F
F
F
F
DD
F
F
F
F
SD
FF
SD SD
F
SD
DD
DD
OSY
F
F
F
F
F
F
FFFF
SD SDFF
SD
V
V
SD
SD
V
F
V
V
F
DD
DD
DD
DD
DD
WF
OSY
R2
SD
SD
F
V
V
V
F
SD SD
SDSD
SD SD SD
VF
F
FV
OSY
HD
FF
F
F
FACP
FAA
FREEZER
500-23
COOLER
500-22
FREEZER
500-2
LOCKSHOP
500-21
LOCKSHOP
500-26
GENERATOR
500-17
MECHANICAL /
ELECTRICAL
500-1
SUPER OFFICE
500-14
JC
500-16 TOILET
500-18
TOILET
500-15
TOOL ROOM
500-20
SHOP AREA
500-4
SUPER OFFICE
500-6
S.A.T. ROOM
500-7
SEC OFFICE
500-12
SUPT. OFFICE
500-11
VESTIBULE
500-13
STAFF CLOTHING
500-24
WAREHOUSE
500-3
SUPPLIES
500-25
TOILET
500-10
TOILET
500-19
GARAGE AREA
500-5
FACP
TC-A
FAA
MEZZANINE
500-27
MEZZANINE
500-28
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDINGS 500
"NORTH
MAINTENANCE
WAREHOUSE" -
FIRST FLOOR
PLANS
17-560.00
E 105
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING 500 FIRST FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 500 FIRST FLOOR FIRE ALARM PLAN
1/16" = 1'-0"
BUILDING 500 MEZZANINE FLOOR DEMOLITION PLAN
1/16" = 1'-0"
BUILDING 500 MEZZANINE FLOOR FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
SD
SD
SD
SD
SD
SD
F
F
F
SDSD SDSDSDSD
F
F
F
F
F F
SD
SD
SD SD SD SD SD
SD
SD
SD
SD
SD
INMATE
1-113
INMATE
1-112
INMATE
1-111
INMATE
1-110
INMATE
1-109
INMATE
1-108
INMATE
1-107
INMATE
1-106
INMATE
1-105
INMATE
1-104
INMATE
1-103
INMATE
1-102
INMATE
1-101
JC
1-191
INMATE
1-160
INMATE
1-159
INMATE
1-158
INMATE
1-157
INMATE
1-156
INMATE
1-155
INMATE
1-154
HCP INMATE
1-153
INMATE
1-152
INMATE
1-151
INMATE
1-150
INMATE
1-149
INMATE
1-148
JC
1-186
SHOWER
1-193
SHOWER
1-188
TOILET
1-187
TOILET
1-192
INMATE
1-146
INMATE
1-145
INMATE
1-144
INMATE
1-143
INMATE
1-142
INMATE
1-141
HCP INMATE
1-140
INMATE
1-139
INMATE
1-138
INMATE
1-137
INMATE
1-136
INMATE
1-135
INMATE
1-134
INMATE
1-133
INMATE
1-132
INMATE
1-131
INMATE
1-147
INMATE
1-130
INMATE
1-129
INMATE
1-128
INMATE
1-127
INMATE
1-126
INMATE
1-125
INMATE
1-124
INMATE
1-123
INMATE
1-122
INMATE
1-121
INMATE
1-120
INMATE
1-119
INMATE
1-118
INMATE
1-117
INMATE
1-116
INMATE
1-115
INMATE
1-114
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING H01
"HOUSING UNIT
1" - LOWER
LEVEL PLANS
17-560.00
E 106
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING H01 "HOUSING UNIT 1" LOWER LEVEL DEMOLITION PLAN
1/16" = 1'-0"
BUILDING H01 "HOUSING UNIT 1" LOWER LEVEL FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
SD
SD
SD
SD
SD
F
F
F
SDSD SDSDSDSD
SD
SD
SD
SD
D H
D H
SD
F F
SD
F
SD
SD
SD
SD
F
SD
D D
SD F
F
F
SD
SDD
H
D H
O
SY
O
SY
W F
F
F
F
OSY
OSY
OSY
OSY
F
F
F F
SD
SD
F
HD
F
F
SD
SD
R1
SD
V
F
SD
F
DD
W F
O
SY
O
SY
SD
F
V
F
F
F
SD
SD
SD
SD
SD
SD SD SD SD SD
SD
SD
SD
SD
SD
SD
F
F
F
SD
SD
WF
WF
WF
WF
FAA
FACP
ACTIVITIES
1-176
MIDDLE ACTIVITY
ROOM
1-175
QUIET ROOM
1-173
INMATE
1-213
INMATE
1-212
INMATE
1-211
INMATE
1-210
INMATE
1-209
INMATE
1-208
INMATE
1-207
INMATE
1-206
INMATE
1-205
INMATE
1-204
INMATE
1-203
INMATE
1-202
INMATE
1-201
JC
1-267
LAUNDRY
1-179
STORAGE
1-169
INMATE
1-260
INMATE
1-259
INMATE
1-258
INMATE
1-257
INMATE
1-256
INMATE
1-255
INMATE
1-254
INMATE
1-253
INMATE
1-252
INMATE
1-251
INMATE
1-250
INMATE
1-249
INMATE
1-248
JC
1-262
MECH. ROOM
1-171
ELECTRICAL
1-170
JC
1-182
ARUS OFFICE
1-181
ARUS OFFICE
1-178
TOILET
1-177
SHOWER
1-269
SHOWER
1-264
TOILET
1-263
TOILET
1-268
RUM OFFICE
1-180
INMATE
1-246
INMATE
1-245
INMATE
1-244
INMATE
1-243
INMATE
1-242
INMATE
1-241
INMATE
1-240
INMATE
1-239
INMATE
1-238
INMATE
1-237
INMATE
1-236
INMATE
1-235
INMATE
1-234
INMATE
1-233
INMATE
1-232
INMATE
1-231
INMATE
1-247
INMATE
1-230
INMATE
1-229
INMATE
1-228
INMATE
1-227
INMATE
1-226
INMATE
1-225
INMATE
1-224
INMATE
1-223
INMATE
1-222
INMATE
1-221
INMATE
1-220
INMATE
1-219
INMATE
1-218
INMATE
1-217
INMATE
1-216
INMATE
1-215
INMATE
1-214
FAA
FACP
TC-A
10 A-1
A-1
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING H01
"HOUSING UNIT
1" - UPPER
LEVEL PLANS
17-560.00
E 107
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS DEMOLITION PLAN
1/16" = 1'-0"
BUILDING H01 "HOUSING UNIT 1" - UPPER LEVEL PLANS FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
A-1
O C
T O
B E
R
F
F
F
SD
SD
SD
SD
SD
SD
SDSDSDSDSD F
F
F
F
F F
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD
INMATE
2-113
INMATE
2-112
INMATE
2-111
INMATE
2-110
INMATE
2-109
INMATE
2-108
INMATE
2-107
INMATE
2-106
INMATE
2-105
INMATE
2-104
INMATE
2-103
INMATE
2-102
INMATE
2-101
JC
2-191
INMATE
2-160
INMATE
2-159
INMATE
2-158
INMATE
2-157
INMATE
2-156
INMATE
2-155
INMATE
2-154
INMATE
2-153
INMATE
2-152
INMATE
2-151
INMATE
2-150
INMATE
2-149
INMATE
2-148
JC
2-186
SHOWER
2-193
SHOWER
2-188
TOILET
2-187
TOILET
2-192
INMATE
2-146
INMATE
2-145
INMATE
2-144
INMATE
2-143
INMATE
2-142
INMATE
2-141
INMATE
2-140
INMATE
2-139
INMATE
2-138
INMATE
2-137
INMATE
2-136
INMATE
2-135
INMATE
2-134
INMATE
2-133
INMATE
2-132
INMATE
2-131
INMATE
2-147
INMATE
2-130
INMATE
2-129
INMATE
2-128
INMATE
2-127
INMATE
2-126
INMATE
2-125
INMATE
2-124
INMATE
2-123
INMATE
2-122
INMATE
2-121
INMATE
2-120
INMATE
2-119
INMATE
2-118
INMATE
2-117
INMATE
2-116
INMATE
2-115
INMATE
2-114
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING H02
"HOUSING UNIT
2" - LOWER
LEVEL PLANS
17-560.00
E 108
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW VOLTAGE WIRING AS REQUIRED PER NEC.
6 REMOVE CEILINGS AND GRID AS REQUIRED. REPLACE ANY DAMAGED
CEILINGS.
7 PULL STATIONS SHALL BE SINGLE ACTION, METAL, KEYED TO INITIATE
(MATCHING THE FACILITIES EXISTING KEYING) AND ALLEN WRENCH TO RESET.
1 CONNECT NEW FIRE ALARM SYSTEM TO EXISTING FLOW SWITCH AND TAMPER
SWITCH. PROVIDE ALL REQUIRED EQUIPMENT FOR A COMPLETE INSTALLATION.
2 PROVIDE NEW DUCT TYPE SMOKE DETECTOR IN PLACE OF EXISTING. DETECTOR
SHALL SHUT DOWN MECHANICAL UNIT UPON DETECTION OF SMOKE. PROVIDE
ALL REQUIRED EQUIPMENT AND WIRING FOR A COMPLETE INSTALLATION.
3 ALL EXISTING MAGNETIC DOOR HOLDERS SHALL BE CONNECTED TO THE NEW
FIRE ALARM SYSTEM.
4 TIE ELEVATOR INTO NEW FIRE ALARM SYSTEM. COORDINATE INSTALLATION
REQUIREMENTS WITH PRISON SECURTIY AND ELEVATOR CONTRACTOR.
PROVIDE ALL NECESSARY EQUIPMENT FOR A COMPLETE INSTALLATION.
5 NOTIFICATION DEVICES SHALL BE PENDANT MOUNTED. FINAL MOUNTING
HEIGHT SHALL BE 20' ABOVE FINISH FLOOR.
6 PROVIDE NEW FIRE ALARM CONTROL PANEL (F.A.C.P.). OWNER TO PROVIDE
FIRE WATCH AS REQUIRED. CONTRATOR TO MINIMIZE DOWN TIME BY DOING AS
MUCH WORK AHEAD OF TIME AS POSSIBLE. CONNECT NEW F.A.C.P. TO
EXISTING 120V FIRE ALARM CIRCUIT. PROVIDE BREAKER LOCK FOR EXISTING
CIRCUIT BREAKER. PROVIDE CONDUIT AND WIRE AS REQUIRED.
7 CONNECT EXISTING KITCHEN HOOD SUPPRESION SYSTEM TO NEW FIRE ALARM
SYSTEM. PROVIDE ALL EQUIPMENT, WIRING AND PROGRAMMING REQUIRED FOR
A COMPLETE INSTALLATION.
8 PROVIDE WALL MOUNTED PROTECTION FOR PULL STATIONS. PROTECTION IS
INTENDED TO MINIMIZE DAMAGE TO PULL STATIONS FROM CARTS AND OTHER
OBJECTS IN HIGH TRAFFIC AREAS.
9 PROVIDE ULTRA LINKS AND ALL ASSOCIATED PROGRAMMING TO CONNECT
FUTURE ALARM POINTS TO THE STARNET 2 SYSTEM.
10 CONNECT EXISTING RELAYS TO NEW FIRE ALARM SYSTEM. RELAYS CONTROL
PURGE SYSTEM. ADD A SWITCH/LED BOARD TO THE ANNUNCIATOR TO ALLOW
CONTROL OF THE PURGE SYSTEM. PROVIDE ALL REQUIRED EQUIPMENT FOR A
COMPLETE INSTALLATION.
GUS HARRISON
CORRECTIONAL FACILITY
KEY PLAN
SCALE: NO SCALE
0'
10'
20'
30' 50'
GRAPHIC SCALE
H01
H02HO3
H04
CHP
SMT
HCD
SAD
SPS
SFS
H05
H06
HAB
HEF
HGH
1/16" = 1'-0"
BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL DEMOLITION PLAN
1/16" = 1'-0"
BUILDING H02 "HOUSING UNIT 2" - LOWER LEVEL FIRE ALARM PLAN
.1
.R
M P
A U
G U
S T
ISSUED FOR DATE
ADDENDUM 1 11/05/18
O C
T O
B E
R
F
F
F
SD
SD
SD
SD
D H
D H
SD
F
F
SD
F
F
SD
DD
SD
F
F
F
SD
SD
D H
D H
O
SYO
SYW
F
SD
SD
SD
SD
SD
SDSDSDSDSD
SD
SD
SD
SD
SD
F
F
F
OSY
OSY
OSY
OSY
F
F
F F
SD
SD
F F
V
SD
F
SD DD
W F
O
SY
O
SY
SD
V
R1
F
SD
F
F
F
HD
SD
F
F
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD SD SD SD SD
F
F
F
SD
SD
SD
WFWF
WFWF
FAA
FACP
ACTIVITIES
2-176
MIDDLE ACTIVITY
ROOM
2-175
QUIET ROOM
2-173
INMATE
2-213
INMATE
2-212
INMATE
2-211
INMATE
2-210
INMATE
2-209
INMATE
2-208
INMATE
2-207
INMATE
2-206
INMATE
2-205
INMATE
2-204
INMATE
2-203
INMATE
2-202
INMATE
2-201
JC
2-267
LAUNDRY
2-179
STORAGE
2-169
INMATE
2-260
INMATE
2-259
INMATE
2-258
INMATE
2-257
INMATE
2-256
INMATE
2-255
INMATE
2-254
INMATE
2-253
INMATE
2-252
INMATE
2-251
INMATE
2-250
INMATE
2-249
INMATE
2-248
JC
2-262
MECH. ROOM
2-171
ELECTRICAL
2-170
JC
2-182
ARUS OFFICE
2-181
ARUS OFFICE
2-178
TOILET
2-177
SHOWER
2-269
SHOWER
2-264
TOILET
2-263
TOILET
2-268
RUM OFFICE
2-180
INMATE
2-246
INMATE
2-245
INMATE
2-244
INMATE
2-243
INMATE
2-242
INMATE
2-241
INMATE
2-240
INMATE
2-239
INMATE
2-238
INMATE
2-237
INMATE
2-236
INMATE
2-235
INMATE
2-234
INMATE
2-233
INMATE
2-232
INMATE
2-231
INMATE
2-247
INMATE
2-230
INMATE
2-229
INMATE
2-228
INMATE
2-227
INMATE
2-226
INMATE
2-225
INMATE
2-224
INMATE
2-223
INMATE
2-222
INMATE
2-221
INMATE
2-220
INMATE
2-219
INMATE
2-218
INMATE
2-217
INMATE
2-216
INMATE
2-215
INMATE
2-214
FACP
TC-A
FAA
A-1
A-1
F
IL
E N
U M
B E
R
S T
A T
E I N
D E
X N
U M
B E
R S
C o ns tr uc tio n
F in a l R e co rd
Is su e d f o r
P re lim in a ry
D a te
D E
S
IG
N A
N D
C O
N S
T R
U C
T
IO
N D
IV
IS
IO
N
D E
P A
R T
M E
N T
O F
T E
C H
N O
L O
G Y
M
A N
A G
E M
E N
T A
N D
B U
D G
E T
S T
A T
E O
F M
IC
H
IG
A
N
R O
B E
R T
C H
A L L R
A N
C A
R B
D
IR
E
C T
O R
S T
A T
E F
A C
IL
IT
IE
S
A D
M
IN
IS
T
R A
T
IO
N
Tower Pinkster Titus Associates Inc.
242 East Kalamazoo Avenue, Suite 200
Kalamazoo, Michigan 49007-5828
269.343.6133 PHONE 269.343.6633 FAX
TOWERPINKSTER.COM
ALL RIGHTS RESERVED2018©
DATE
PROJECT TITLE
SHEET TITLE
SHEET NUMBER
4 East Fulton Street, Suite 200
Grand Rapids, Michigan 49503
616.456.9944 PHONE 616.456.5936 FAX
OCTOBER 2, 2018
GUS HARRISON
CORRECTIONAL
FACILITY FIRE
ALARM
UPGRADE
Adrian, Michigan
BUILDING H02
"HOUSING UNIT
2" - UPPER
LEVEL PLANS
17-560.00
E 109
GENERAL ELECTRICAL NOTES
ELECTRICAL KEYED NOTES
1 ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND
PATCHING REQUIRED FOR NEW WORK OR WHERE DEVICES ARE REMOVED AND
NOT REPLACED.
2 PROVIDE FINAL CONNECTION TO ALL OWNER/CONTRACTOR PROVIDED
EQUIPMENT. COORDINATE RECEPTACLE SIZES AND TYPE WITH EQUIPMENT,
ADJUST CIRCUIT SIZE AS REQUIRED.
3 PATCH ALL PENETRATIONS AS REQUIRED TO MAINTAIN FIRE RATING.
4 ALL CONDUITS SHALL RUN AS NEAR TO DECK AS PERMITTED BY CODE. MOST
CONDUITS WILL BE EXPOSED AND SHALL BE RUN IN A NEAT MANNER.
MAINTAIN THE SAME SPACING WHEN CONDUITS ARE RUN TOGETHER.
5 WHEN CEILINGS ARE REMOVED ELECTRICAL CONTRACTOR SHALL PROPERLY
SUPPORT ALL CONDUIT AND LOW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .