This is Addendum No. 1 issued by TowerPinkster for the Gus Harrison Fire Alarm Upgrade project at the Gus Harrison Correctional Facility in Adrian, MI, on behalf of the Department of Corrections (Project No. 17-560). The addendum clarifies that the RFI cutoff date is November 8th with an addendum to be issued November 9th. The scope includes work on two food service buildings plus MSI that must be completed between 8pm and 4am. The addendum incorporates 24 drawing sheets (E-101 through E-123, and E-401) but no additional specification sections or contract conditions.
The addendum adds technical requirements including matching the facility's existing keying for all pull stations with unique keys for initiation and reset separate from panel keys. It also adds four OSY (Outside Screw and Yoke) valves, two per wing, to the upper level of six different housing units as detailed in drawings E-107, E-109, E-111, E-113, E-115, and E-117. Bidders must acknowledge receipt of this addendum on their bid form to avoid potential disqualification. No pricing terms or funding information is provided in this addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GUS Harrison Drawings 1.pdf | ||
| Advertisement 17395.pdf | ||
| Specifications 1 of 2 17395.pdf | ||
| GUS Harrison Drawings 2.pdf | ||
| Specifications 2 of 2 17395.pdf | ||
| 472.17395.RMP Agenda 2018.10.31.pdf | ||
| Sign In 2018.10.31.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Nurturing curiosity through design since 1953 • towerpinkster.com
©2018 Tower Pinkster Titus Associates, Inc.
ADDENDUM NO. 1
DATE OF ISSUANCE: November 1, 2018
PROJECT: Gus Harrison Fire Alarm Upgrade
Gus Harrison Correctional Facility
Adrian, MI
OWNER: Department of Corrections
ARCHITECT’S PROJECT NO.: 17-560
ORIGINAL CONTRACT DATE:
SCOPE OF WORK
This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract
Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the
Bid Form. Failure to do so may result in disqualification of the Bid.
DOCUMENTS INCLUDED IN THIS ADDENDUM
This Addendum includes one page of text and the following documents:
• Bidding Documents: Agenda – October 31, 2018
• Contract Conditions: None
• Specification Sections: None
• Sketches: None
• Drawings: E-101, E-102, E-103, E-104, E-105, E-106, E-107, E-108, E-109, E-110, E-111, E-112, E-113, E-
114, E-115, E-116, E-117, E-118, E-119, E-120, E-121, E-122, E-123, E-401
CHANGES TO PREVIOULSY ISSUED ADDENDA
None.
CHANGES TO BIDDING REQUIREMENTS
ADD-1 Item No. B-1 - RFI
RFI cut off will be November 8th. Addendum issued November 9th
ADD-1 Item No. B-2 - SCOPE
Two food service buildings + MSI will be done 8pm to 4am.
11.9.2018 Addendum No. 1 // Gus Harrison Fire Alarm Upgrade // 17-560 2
©2018 Tower Pinkster Titus Associates, Inc.
ADD-1 Item No. B-3 - ALL SHEETS – GENERAL NOTE
Match the facilities existing keying for all pull stations. They shall be keyed to initiate and reset. A unique key shall be used from the panel keys.
ADD-1 Item No. B-4 - E-107
Four OSY, two per wing, added to the housing unit - upper level
ADD-1 Item No. B-5 - E-109
Four OSY, two per wing, added to the housing unit - upper level
ADD-1 Item No. B-6 - E-111
Four OSY, two per wing, added to the housing unit - upper level
ADD-1 Item No. B-7 - E-113
Four OSY, two per wing, added to the housing unit - upper level
ADD-1 Item No. B-8 - E-115
Four OSY, two per wing, added to the housing unit - upper level
ADD-1 Item No. B-9 - E-117
Four OSY, two per wing, added to the housing unit - upper level
END OF ADDENDUM.