472.17395.RMP Agenda 2018.10.31.pdf

PDF 492 KB Posted

Attached to
472/17395. RMP Fire Alarm Project - Gus Harrison CF
Solicitation number
RFQ-171-190000000017-2
Issued by
Kalamazoo County, Michigan

About this file

This is a project agenda from the Michigan Department of Technology, Management and Budget's Design & Construction Division for a Fire Alarm Upgrade project at the Gus Harrison Correctional Facility in Adrian, MI. The project (File No. 472.17395.RMP) involves upgrading fire alarm systems across multiple buildings, with bids due November 14, 2018 at 2:00 PM. The construction duration is set at 150 calendar days, with RFI cutoff on November 11th and addendum issuance on November 12th. The work includes installation of new fire alarm systems that will report through the Starnet 2 system, with specific requirements for security features including tamper-proof screws and single action metal pull stations.

The project includes a $50,000 allowance and is designated as non-prevailing wage. There is a deductive alternate for the Starnet 2 upgrade. Technical specifications require ¾" minimum conduit, security-type mounting hardware, and no surface raceway or knockout boxes. Work scheduling allows for either 4-10 hour days or 5-8 hour days, with four escorts provided. The Food Service building work must be completed between 8:00 PM and 4:00 AM. System downtime is limited to 48 hours per building due to fire watch requirements, and all construction changes require 48-hour advance notification to the facility.

View the file

Other files

File Type Posted
GUS Harrison Drawings 1.pdf PDF
Advertisement 17395.pdf PDF
Specifications 1 of 2 17395.pdf PDF
GUS Harrison Drawings 2.pdf PDF
Specifications 2 of 2 17395.pdf PDF
Sign In 2018.10.31.pdf PDF
Gus Harrison Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

Facilities and Business Services Administration

Design & Construction Division

General Service Building, 3B

P.O. Box 30026

Lansing, Michigan 48909

Agenda

Date: October 31, 2018

Progress Mtg. No.: 4

Location: Gus Harrison Correctional Facility, Adrian, MI

Project: Department: Department of Corrections

Agency: DOC/Gus Harrison

Project Name: Fire Alarm Upgrade

File No.: 472.17395.RMP

Index No.: 24590

Contract No.:

Issued For Construction:

Bid Date: November 14, 2018

Start Date:

Project Completion Date:

Anticipated Completion Date:

Attendance: See Attached

1. Non-prevailing wage.

2. Bid day is November 14 at 2:00 pm. Does this need to be extended at all?

3. RFI cut off will be November 11th. Addendum issued November 12th.

4. Construction Duration is 150 Calendar Days.

5. Deductive Alternate for the Starnet 2 upgrade.

6. Allowance is $50,000

7. 4-10 hour days or 5-8 hour days is acceptable. But needs to be determined before work starts and will be that way through construction. Four escorts will be provided.

8. Permits. All buildings have BCC. Housing units are BFS and submitted by the fire alarm vendor. Include costs in your bids to do so.

9. Painting and patching are all by the contractor. Match existing materials.

427.17395.RMP – Gus Harrison Fire Alarm Upgrade -2- 10/31/18

10. All new conduit, ¾” minimum. 2-hole straps 12” from every junction and 3’ on center. No knockout boxes anywhere.

11. All straps and supports need to use security type screws or mounting.

12. No surface raceway.

13. All screws shall be tamper-proof, including the devices.

14. The devices need to have security screw fasteners. This is not a standard with some manufacturers.

15. Tying the new system in for each building will require a down time. This needs to be limited to 48 hours since the facility is required to do fire watch.

16. All buildings will report back through the Starnet 2 system.

17. Food Service building will be done 8:00 pm to 4:00 am

18. Attic stock.

19. Pull stations shall be single action, metal, keyed to initiate (shall match the existing key) and Allen Wrench to reset.

20. pCoordinate all construction with the team. The facility needs to be notified 48 prior to any changes.

21. All questions need to be addressed in an RFI to Tower Pinkster. This is important for all documentation. Changes will be followed up with a Bulletin.

File details come from the government source that posted it. Updated .