Gus Harrison Addendum 1.pdf

PDF 522 KB Posted

Attached to
472/17395. RMP Fire Alarm Project - Gus Harrison CF
Solicitation number
RFQ 171 190000000017 2
Issued by
Michigan

About this file

This is Addendum No. 1 issued by Tower Pinkster Titus Associates, Inc., the architect for the Michigan Department of Corrections, dated November 1, 2018, for the Gus Harrison Fire Alarm Upgrade project at Gus Harrison Correctional Facility in Adrian, Michigan (Project No. 17-560). The addendum modifies bidding requirements and project specifications for the fire alarm system installation. Key changes include establishing November 8, 2018, as the Request for Information (RFI) cutoff date, with the addendum to be issued November 9, 2018. Work in two food service buildings and the Main Support Installation (MSI) must be completed during extended hours from 8:00 p.m. to 4:00 a.m. on November 9, 2018. All pull stations must match the facility's existing keying system, with a unique key required for both initiation and reset functions separate from panel keys. The addendum incorporates 23 electrical drawing sheets (E-101 through E-123 and E-401) as contract documents.

The addendum specifies four additional Occupancy Sensor and Yoke (OSY) units, with two per wing, to be added to the upper level of housing units across six different building sections (identified on drawings E-107, E-109, E-111, E-113, E-115, and E-117). Bidders must acknowledge receipt of this addendum on the bid form to avoid disqualification. No changes to contract conditions or specification sections are included in this addendum, and no previous addenda required modification.

View the file

Other files

File Type Posted
Specifications 1 of 2 17395.pdf PDF
472.17395.RMP Agenda 2018.10.31.pdf PDF
Sign In 2018.10.31.pdf PDF
Advertisement 17395.pdf PDF
GUS Harrison Drawings 1.pdf PDF
GUS Harrison Drawings 2.pdf PDF
Specifications 2 of 2 17395.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Nurturing curiosity through design since 1953 • towerpinkster.com

©2018 Tower Pinkster Titus Associates, Inc.

ADDENDUM NO. 1

DATE OF ISSUANCE: November 1, 2018

PROJECT: Gus Harrison Fire Alarm Upgrade

Gus Harrison Correctional Facility

Adrian, MI

OWNER: Department of Corrections

ARCHITECT’S PROJECT NO.: 17-560

ORIGINAL CONTRACT DATE:

SCOPE OF WORK

This Addendum includes changes to, or clarifications of, the original Bidding Documents and any previously issued addenda, and shall be included in the Bid. All of these Addendum items form a part of the Contract

Documents. The Bidder shall acknowledge receipt of this Addendum in the appropriate space provided on the

Bid Form. Failure to do so may result in disqualification of the Bid.

DOCUMENTS INCLUDED IN THIS ADDENDUM

This Addendum includes one page of text and the following documents:

• Bidding Documents: Agenda – October 31, 2018

• Contract Conditions: None

• Specification Sections: None

• Sketches: None

• Drawings: E-101, E-102, E-103, E-104, E-105, E-106, E-107, E-108, E-109, E-110, E-111, E-112, E-113, E-

114, E-115, E-116, E-117, E-118, E-119, E-120, E-121, E-122, E-123, E-401

CHANGES TO PREVIOULSY ISSUED ADDENDA

None.

CHANGES TO BIDDING REQUIREMENTS

ADD-1 Item No. B-1 - RFI

RFI cut off will be November 8th. Addendum issued November 9th

ADD-1 Item No. B-2 - SCOPE

Two food service buildings + MSI will be done 8pm to 4am.

11.9.2018 Addendum No. 1 // Gus Harrison Fire Alarm Upgrade // 17-560 2

©2018 Tower Pinkster Titus Associates, Inc.

ADD-1 Item No. B-3 - ALL SHEETS – GENERAL NOTE

Match the facilities existing keying for all pull stations. They shall be keyed to initiate and reset. A unique key shall be used from the panel keys.

ADD-1 Item No. B-4 - E-107

Four OSY, two per wing, added to the housing unit - upper level

ADD-1 Item No. B-5 - E-109

Four OSY, two per wing, added to the housing unit - upper level

ADD-1 Item No. B-6 - E-111

Four OSY, two per wing, added to the housing unit - upper level

ADD-1 Item No. B-7 - E-113

Four OSY, two per wing, added to the housing unit - upper level

ADD-1 Item No. B-8 - E-115

Four OSY, two per wing, added to the housing unit - upper level

ADD-1 Item No. B-9 - E-117

Four OSY, two per wing, added to the housing unit - upper level

END OF ADDENDUM.

File details come from the government source that posted it. Updated .