Gus Harriosn Correctional Facility Smoke Purge System Repair Repalce Addendum 2.pdf
PDF 116 KB Posted
- Solicitation number
- RFQ 171 260000000384 3
- Issued by
- Michigan
About this file
This Construction Bid Addendum No. 2 is issued by the Department of Technology, Management and Budget, State Facilities Administration Design & Construction Division for the Gus Harrison Correctional Facility Smoke Purge System Repair/Replace project (File Number 472/25081.GSA). The professional managing the project is Matrix Consulting Engineers, with David Lenz serving as Project Director. The addendum was issued on July 29, 2026, with a bid opening date of August 5, 2026. Bidders are required to acknowledge receipt of this addendum in their bid submission; failure to do so may result in bid rejection.
The addendum contains three clarifications to the bidding documents: the Siemens Controls contact person is Mike Schellenboom (Phone: 616-279-9759); the contractor is responsible for removing water from existing manholes as necessary to complete the Building 500 electrical scope of work; and temporary lighting is required for the project with all temporary lighting to be connected to the control desk lighting controls. The addendum was approved by Project Director David Lenz on July 29, 2026, and becomes part of the Contract Documents upon issuance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTMB-0414 (Rev 6/25)
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND
BUDGET
State Facilities Administration Design & Construction Division
CONSTRUCTION BID ADDENDUM NO. 2
This form identifies an Addendum to Bidding Documents, and incorporates interpretations or clarifications, modifications, acceptance of proposed “or equal” materials, and other information into the Bidding Documents. Addenda will be numbered by the Professional and distributed through www.michigan.gov/SIGMAVSS as an attachment.
TO:
ALL BIDDERS
DATE ISSUED
7/29/2026
PROJECT NAME
Gus Harrison Correctional Facility – Smoke Purge System Repair/ Replace
FILE NUMBER
472/25081.GSA
PROFESSIONAL
Matrix Consulting Engineers
PROJECT DIRECTOR
David Lenz
BID OPENING DATE:
8/5/2026
ADDENDUM ITEMS:
1. Clarification: Siemens Controls contact is Mike Schellenboom, Phone: 616-279-9759.
2. Clarification: Contractor is responsible for removing water from the existing manholes as required to complete the Building 500 electrical scope of work.
3. Clarification: Temporary lighting is required for the project. All temporary lighting is required to be tied to the control desk lighting controls.
ACKNOWLEDGEMENT: This Addendum must be acknowledged by the Bidder in the space provided in the Bid Summary and Bid Form. Failing to acknowledge Addenda may be cause for the Bid to be rejected. Addenda will become part of the Contract Documents.
PROFESSIONAL: Troy Thelen, Matrix DATE: 7/29/2026
APPROVED BY:
PROJECT DIRECTOR: David Lenz
DATE: 7/29/2026