Gull Lake Schools - Ryan Intermediate - Paging Upgrades - Advertisement for bid.pdf

PDF 68 KB Posted

Attached to
Ryan Intermediate Paging System Upgrades
Solicitation number
RFP GLCS 200000001727 1
Issued by
Michigan

About this file

This is an Advertisement for Bids issued by Gull Lake Community Schools for paging system upgrades at Ryan Intermediate School. The project is being designed by CommTech Design. Bids are due electronically no later than 2:00 PM EDT on May 22, 2020, with submissions directed to bret@commtechdesign.com and mstephanyayan@gulllakecs.org. RFP documents became available on May 8, 2020, through the Michigan SIGMA portal at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService. No pre-bid meeting was scheduled for this project.

The advertisement does not specify pricing terms, contract duration, renewal options, or funding sources. The owner reserves the right to accept or reject any bids based on criteria deemed to be in their best interest. Contractors are notified that no additions or exceptions will be granted for site conditions of which they were not previously aware.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADVERTISEMENT FOR BIDS

DATE: May 8, 2020

PROJECT: Ryan Intermediate – Paging System Upgrades

OWNER: Gull Lake Community Schools 10100 E. D Ave Richland, Mi 49083

DESIGNER: CommTech Design 6581 Belding Rd, N.E.

Rockford, MI 49341 Phone: 616-863-8132

BID DUE DATE: The Owner will receive electronic bids for the work as set forth in the Bid specifications and proposal forms at:

bret@commtechdesign.com AND mstephayan@gulllakecs.org

Bids are Due no later than: 2:00 PM EDT on mat 22nd, 2020

There will no pre-bid meeting

Bids received after the above date and time will not be accepted. The owner reserves the right to accept or reject bids for reasons the owner deems to be in their best interest.

RFP documents will be available on May 8th, 2020 and can be obtained by at:

https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

No additions or exceptions will be made to the contractors that were not aware of site conditions.

mailto:bret@commtechdesign.com mailto:mstephayan@gulllakecs.org https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService

File details come from the government source that posted it. Updated .