05-08-20 Gull Lake Ryan - Paging System - Bid Specs and Drawings.pdf
PDF 3 MB Posted
- Attached to
- Ryan Intermediate Paging System Upgrades
- Solicitation number
- RFP GLCS 200000001727 1
- Issued by
- Michigan
About this file
This is a Bid Specifications and Drawings document for the Gull Lake Community Schools District in Richland, Michigan, soliciting proposals for a Paging System Upgrades project at Ryan Intermediate School. The project involves the installation of an upgraded audio and video paging system with integrated bell functionality, including new speakers, cabling, and headend equipment throughout the school building. The system must support two-way talkback capability for each classroom, programmable bell schedules with multiple simultaneous schedules, PC-based control interface, and integration with the existing telephone system. Bids were due on May 22, 2020, at 2:00 PM, with all questions to be submitted by May 15, 2020, at 3:00 PM to Commtech Design representative Bret Emerson. No pre-bid meeting was scheduled. The completion date for the paging and bell system installation throughout the entire building is August 4, 2020. Work access is available from 7:30 AM to 5:00 PM Monday through Friday, with all classroom and hallway work to be completed during summer or non-school hours.
The base bid price should include all equipment, labor, installation, configuration, warranty, and testing with costs submitted in a sealed envelope. Bidders must submit a 5% bid bond and, for projects valued at $50,000 or more, provide Performance, Labor, and Material Bonds for the full contract amount. Required insurance includes Workers Compensation with $500,000 limits, General Liability with $1,000,000 combined single limit, and Umbrella Insurance with $2,000,000 limits. Contractors must be fully licensed and insured, authorized by the manufacturer, and employ certified technicians. The project requires completion of comprehensive as-built documentation, training for school staff on system operation, and a one-year warranty beginning at substantial completion. Payments will be issued within 21 days of invoicing on AIA G702/G703 forms, with the owner retaining 10% of project costs until final completion. Approved manufacturers for the paging/bell system include Carehawk System, with requests for other alternatives to be submitted to the designer prior to bid.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Gull Lake Schools - Ryan Intermediate - Paging Upgrades - Advertisement for bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Documents For
RYAN INTERMEDIATE
PAGING SYSTEM UPGRADES
Gull Lake Community Schools
District Offices 10100 E. D Ave
Richland, MI 49083
#1297-01
Distributed by:
Contact Bret Emerson
616-863-8132 emersonb@commtechdesign.com
May 8, 2020 mailto:emersonb@commtechdesign.com
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-1 Paging System Upgrades
SECTION 28 0500 – FRONT END
PART 1 - GENERAL
1.01 INTRODUCTION
A. Gull Lake Community Schools invites qualified contractors to provide proposals for a Paging
Systems Upgrade at the Ryan Intermediate School. This work includes:
1. The base bid is the cost for the installation of all the audio and video systems including classroom AV system and cabling, etc. All work shall include all equipment, labor, installation and testing.
B. The Contractor shall pay all costs of the Work including, but not limited to, labor, materials, equipment, tools, transportation, freight, taxes, royalties, patent fees, support facilities, construction equipment, water, heat, utilities, supervision, overhead, and all other items necessary for the proper execution and completion of the Work.
1.02 CONTACTS
A. The contact for all questions and any addendums during bidding shall be:
Commtech Design Bret Emerson 616-863-8132 emersonb@commtechdesign.com
B. The owner as referred to in this bid is:
Gull Lake Community Schools 10100 E. D Ave Richland, MI 49083
1.03 DUE DATES
A. Bids are due on May 22nd, 2020 at 2:00 PM
Email to the following:
Bret@commtechdesign.com mstephayn@gulllakecs.org
Email Title Shall say “Gull Lake Ryan Paging System Bid Response”
B. There is no Pre-Bid meeting for this project
C. All questions shall be submitted to the owner no later than May 15th, 2020 at 3:00PM. All questions shall be sent via email to Bret Emerson of Commtech Design.
Bret Emerson bret@Commtechdesign.com 616-863-8132
1.04 BUILDING SITES
A. Work to be completed as part of this bid will be done at the sites as detailed in the drawings and specifications:
B. Access to the sites shall be from 7:30 AM to 5:00 PM Monday thru Friday in the additions and during the summer / school hiatus.
1. Arrangements can be made for additional time on site during each day as scheduled with the owner.
mailto:emersonb@commtechdesign.com mailto:Bret@commtechdesign.com mailto:mstephayn@gulllakecs.org mailto:bret@Commtechdesign.com
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-2
2. All work in the classrooms or hallway shall be completed during the summer or during non-school hours.
1.05 OWNERS RIGHTS
A. The owner reserves the right to waive any formalities to bid, to reject any or all bids and to accept the bid that is most favorable to the Owner.
B. The owner does not incur any responsibility for Bidder’s costs in preparing the bid proposal.
C. Bidder recognizes that the owner is subject to the Freedom of Information Act. Per formal request the owner will make bid documents available for public review following contract with a successful bidder.
1.06 BID RESPONSE FORMAT
A. The owner requires that all responses include the information listed below.
B. All bid responses shall be submitted in a three-ring binder or bound folder
1. Provide two copies of the bid response. One shall be marked as the ORIGINAL. The ORIGINAL shall be signed by a duly designated officer of the company.
C. Bid responses shall be provided in the following format with section dividers.
1. Bid Form –See Bid Documents
2. Description of the bidder’s company
3. Description of the bidder’s response and the services they will provide.
a. Include information about any manufacturer required on-going maintenance costs for software or hardware or upgrades.
4. Spreadsheet detailing all equipment being submitted per building.
5. Any information the bidder wishes to include that was not specifically required.
1.07 DOCUMENTS
A. The following drawings are part of the bid package.
1. Refer to the table below to determine which drawings are included in each bid category. Some drawings refer to multiple bid categories.
DWG.
Drawing Name
TC701 Paging Legends, Schedules & Details
TC801 First Floor Paging Plan Unit 100
TC802 First Floor Paging Plan Unit 200
TC803 First Floor Paging Plan Unit 300
TC804 First Floor Paging Plan Unit 400
TC805 First Floor Paging Plan Unit 500
TC806 First Floor Paging Plan Unit 600
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-3
B. The following specifications are part of the bid package.
1. The following specifications are part of the bid package.
2. Refer to the table below to determine which specification sections are included in each bid category. Some sections refer to all bid categories
PART 2 - PERSONNEL
2.01 BIDDER
A. Minimum Bidder Qualifications:
1. Bidder must be fully licensed and insured.
2. Bidder must be fully authorized by the manufacturer being proposed to install and configure the equipment.
3. Shall have technicians that are fully certified to install and configure the equipment being provided as part of the bid.
B. Bidder shall address each item in this package as specified. All required labor and equipment must be quoted. Any exception must be noted and explained. All bids must include the entire section bid to be considered.
C. The Contractor can withdraw their bid at any time prior to opening the bids.
D. Work shall be coordinated with the owner’s technology coordinator, architect, construction manager and the technology designer
2.02 PERSONNEL
A. All personnel working on the project shall be certified by the manufacturer to install, configure and connect the equipment as per the owner’s requirements and the manufacturer’s specifications.
B. The contractor shall assign a Project Manager to the project who will have ultimate authority to make decisions, schedule work and fix or repair any non-conforming equipment.
1. Provide a list of the projects of similar size and scope to the work they will be doing as part of this project. Include examples of three projects with similar scope that the PM has worked on in the last three years.
2. The project manager will be the primary contact for this project
3. The project manager shall attend all project meetings and be fully aware of all work going on as part of the project.
2.03 BACKGROUND CHECKS
A. Contractor’s staff may be required to pass a security clearance check conducted by the
Owner.
B. The Contractor shall authorize the investigation of its personnel proposed to have access to facilities and systems on a case-by-case basis.
Specification
28 0000 Coversheet
28 0500 Front End
Bid Form
Familial Disclosure
Iran Form
28 1000 Communications Overview
28 1800 Paging and Bell System
28 7200 Technology Submittals
28 7600 Technology Labeling
28 7700 Technology Testing
28 7800 Technology Warranty
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-4
1. The scope of the background check is at the discretion of the owner and the results will be used to determine Contractor’s personnel eligibility for working within the facilities and systems.
2. Such investigations will include Michigan State Police Background checks (ICHAT) and may include the National Crime Information Center (NCIC) Fingerprints.
3. Proposed Contractor personnel may be required to complete and submit an RI-8 Fingerprint Card for the NCIC Fingerprint Check.
4. Any request for background checks will be initiated by the owner or construction manager and will be reasonably related to the type of work requested.
PART 3 - WORK REQUIREMENTS
3.01 DOCUMENTS
A. The contractor shall review all bid documents including specifications and the drawings. The specifications and documents and any addenda detail the requirements of the chosen contractor.
B. It is mandatory that items of material and equipment conform to the Contract Documents and meet the quality standards in every respect.
C. Where any specifications or drawings are not in agreement the higher value or more stringent requirement shall apply, and shall be included in the bid pricing.
3.02 PRODUCTS
A. All products shall be of the latest manufacture. No remanufactured or used equipment shall be provided as part of the bid.
B. All equipment shall be provided in the manufacturers shipping container. Provide copy of the shipping lists as part of the project documentation.
3.03 PRODUCT DELIVERY AND LIABILITY
A. The contractor shall be responsible for the complete installation of new and un-damaged products.
B. The contractor shall be liable for all equipment until it is formally accepted by the owner in writing. This shall include the equipment when it is in the contractor’s facility and when it is in the owner’s facility until it is formally accepted.
3.04 DAMAGE
A. The contractor shall be responsible for all damage made to the building or any of the building’s contents during their work as part of this project.
B. The contractor shall not disturb any hazardous material or materials that they are not authorized to work with.
3.05 INCIDENTAL WORK AND PERMITS
A. The contractor shall be responsible for requesting, obtaining and paying for any and all permits required for their work by the local, county, state and federal authorities having jurisdiction (AHJ) over the work being performed.
B. Provide any and all work or equipment required by the Authority Having Jurisdiction (AHJ) that may or may not be specifically noted in these documents.
3.06 INSPECTION OF THE WORK
A. The contractor shall keep up to date as-builts on site for the duration of the project. The engineer may request to see the as-built documents at any time.
B. The Contractor shall promptly facilitate inspection and testing of the Work regardless of expense as necessary or as requested by the Owner, regardless of whether or not the Work in question is his own or that of a subcontractor.
C. If such tests or inspections reveal deficiencies as measured by Construction documents or an independent consultant/testing agency or the owner/engineer, the Contractor shall bear all costs incurred to correct such deficiencies, and the cost to reconstruct any work to meet the contract documents.
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-5
3.07 PROJECT MEETINGS
A. The contractor shall attend project meeting as designated by the owner or engineer.
Attendance is mandatory.
PART 4 - WORK SCHEDULES
4.01 PROJECT SCHEDULE
A. It is the intention of the owner to take possession of the Work by the established completion date or earlier, within the shortest time possible consistent with good construction practices.
B. The Completion Date Shall be:
1. Paging and bell system shall be completed in the entire building by 8/4/2020 C. Upon award of the contract the contractor shall provide a complete schedule for their work.
This shall reference dates in the document and be coordinated with the schedule of any other contractors.
1. Include start date
2. Products installed
3. Punch list work complete
4. Substantial Completion
5. Final Completion after system has been working for 30 days with no outages or failures
D. If the work is delayed through the fault of the owner (or of any separate contractor employed by the owner)
1. The Contractor shall notify the owner, in writing, of any condition or situation that in the
Contractor's opinion warrants an extension of Contract Time.
2. The Contractor shall not be entitled to additional compensation or damages due to delays, interference’s or interruptions to the Work or the Project, but shall be entitled only to an appropriate extension of time in accord with the General Conditions of the Contract for Construction.
PART 5 - DEFICIENT WORK
5.01 PRODUCT AND INSTALLATION DEFICIENCIES
A. The Contractor shall expediently correct all deficiencies brought to his attention in writing or verbally by the owner. If, in the opinion of the owner and the technology design or construction manager, the Contractor fails to correct deficiencies, or fails to act expeditiously to correct deficiencies, the owner may:
1. Accept the deficiencies in the Work and reduce the Contract Sum of the Contractor at fault by a unilateral Change Order issued and signed by the owner in an amount to be determined by the owner.
2. Have the deficiencies removed in any reasonable manner available to the Owner and charge the Contractor at fault for the costs incurred or reduce that Contractor's Contract Sum by a unilateral Change Order issued by the Owner for the costs incurred.
B. The Contractor shall pay all costs of the Work including, but not limited to, labor, materials, equipment, tools, transportation, freight, taxes, royalties, patent fees, support facilities, construction equipment, water, heat, utilities, supervision, overhead, and all other items necessary for the proper execution and completion of the Work.
PART 6 - GENERAL
6.01 LEGAL REQUIREMENTS
A. The Contractor shall comply fully with all laws, statutes, ordinances, rules, regulations, codes, and lawful orders applicable to their work, including employment regulations, unless specifically exempted from compliance by the Contract Documents. Where local codes differ from codes of broader jurisdictions, the more stringent code shall apply. The Contractor shall
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-6 promptly notify the Owner in writing of items in the plans or specifications for this project that violate any applicable codes.
6.02 CLEAN SITE
A. The contractor shall clean the site daily.
B. The contractor shall be responsible for disposal and removal from the site any and all waste and debris generated from their work.
C. All dust or ceiling debris generated as part of the work shall be cleaned each day.
6.03 TAXES
A. The bidder is responsible to apply all tax information within their proposal. Contractor is responsible for applying such tax with each request for payment and complying with Federal, State and local laws.
B. All tax costs shall be included in the base bid price.
6.04 PAYMENTS
A. The contractor shall submit an invoice on the AIA form G702/G703 each month. The invoice shall include only work completed at the time of submission.
B. The contractor can be paid for equipment in storage at the owner’s site as long as the owner is provided with proof of insurance for the equipment.
C. The owner will provide payment on the invoice within 21 days of a signed invoice by the engineer and contractor.
D. The owner will retain 10% of the total cost of the project until the system is considered finally complete as detailed in the project documents.
PART 7 - REVIEW OF BIDS
7.01 OWNER REVIEW
A. The Owner reserves the right to waive any formalities to bid, to reject any or all bids, or to accept the bid that is most favorable to the Owner. The Owner does not incur any responsibility for Bidder’s costs in preparing the bid proposal.
7.02 BID BOND
A. Provide with the bid response a 5% Bid Bond which is required for all proposals. The bond must be in the form of a certified check or a bond executed by a surety company authorized by the State of Michigan. The amount of the bond shall be forfeited if the Contractor, after being awarded the bid, fails to enter into an appropriate contract with the Owner within (30) days.
7.03 PERFORMANCE BOND
A. Successful bidders, for work valued at $50,000 or more, will be required to secure
Performance, Labor and Material Bonds issued for the full amount (100% value) of the contract by a company licensed to do business in the State of Michigan and having an A.M.
Best rating of A- or better. The cost of these bonds is to be included in the proposal amount.
7.04 INSURANCE
A. Contractors must have the proper insurance forms submitted prior to start of their Work. The required insurance shall be written for not less than the limits shown below, or greater if required by law. Contractors will require all subcontractors to maintain similar coverage limits.
The Contractor shall name the Owner as additional insured.
1. Standard Workers Compensation and Employers Liability Employers Liability
a. $500,000 Bodily Injury by Accident—each accident
b. $500,000 Bodily Injury by Disease—each employee
c. $500,000 Bodily Injury by Disease—policy limit
2. General Liability Combined Single Limit Liability
a. $1,000,000 each occurrence
b. Or Split Limit Liability
c. $500,000 Bodily Injury—each occurrence
d. $500,000 Property Damage—each occurrence
Gull Lake Schools/Ryan Intermediate FRONT END 28 0500-7
3. Aggregates
a. $1,000,000 General Aggregate
b. $1,000,000 Products-completed operations
c. Automobile Liability Combined Single Limit Liability
d. $500,000 each accident Or
e. Split Income Liability
f. $500,000 Bodily injury—each person
g. $500,000 Bodily injury—each accident
h. $500,000 Property Damage—each accident
4. Umbrella Insurance
a. $2,000,000 Limit over primary insurance
7.05 REVIEW OF BIDS
A. Bids will be reviewed based on the following criteria:
1. Compliance with bidding documents
2. Price
3. Responsiveness to owner’s requirements
4. Experience and references with similar projects
5. Manufacturers relationships and personnel that are certified in the manufacturer’s equipment.
6. Any on-going costs associated with the equipment or installation.
7. The owner reserves the right to make any decision which they deem to be in their best interest regardless of price or experience of the bidders.
END OF SECTION 28 0500
BID FORM
Gull Lake Schools
Ryan Intermediate - Paging System upgrade
Paging System
Ryan Intermediate School
TO: Gull Lake Schools
10100 E D Ave
Richland, MI 49083
Company Name:
hereinafter called "Contractor", does agree to provide equipment and labor as described in the specifications and drawings.
Total Base Bid $ (in numbers)
The base bid is the cost to provide and install the audio paging system including cabling, speakers and coordination with the existing system.
Work shall include all equipment, labor, installation, configuration, warranty and testing.
Authorized Signature:
Name (printed):
Date:
Email:
Telephone:
Addenda
The Contractor acknowledges receipt of the following addenda and has included their costs in the Total Base Bid price shown above.
Addendum # Dated: Addendum # Dated:
Contractor Address: Phone:
Fax:
E-mail:
Bid Form - Gull Lake Ryan Paging Page 1 of 2
BID FORM
Gull Lake Schools
Ryan Intermediate - Paging System upgrade
Voluntary Alternates:
Voluntary alternates are allowed and may be considered at the discretion of the owner. For each voluntary alternate, provide a brief written description and attach additional information as requried to fully describe intent. All alternates shall be completely inclusive and shall not require any additional work by other trades.
1.
Descripton
Add / Deduct (circle one) $
2.
Descripton
Add / Deduct (circle one) $
Unit Costs:
Provide pricing for the described work or the described product as a single unit cost.
The unit cost shall include any travel, equipment labor, overhead and tax required for purchase and installation of the product or service.
1 Provide, install and test one (1) new paging system speaker. This shall be for a cable that is 225' long. Assume cable is existing.
Unit Cost: $
Bid Form - Gull Lake Ryan Paging Page 2 of 2
STATEMENT REGARDING FAMILIAL RELATIONSHIP
AFFIDAVIT OF _______________________________
(name of affiant)
STATE OF MICHIGAN
COUNTY OF _______________
______________________________makes this Affidavit under oath and states as follows:
1. I am a/the President Vice-President Chief Executive Officer Member Partner Owner Other (please specify) __________________________________
Of ____________________________________, a bidder on a construction project for (insert name of contractor)
_______________________________________ that involves, at least in part, construction (insert name of school district) of a new school building or an addition to or repair or renovation of an existing school building.
2. I have personal knowledge and/or I have personally verified that the following are all of the familial relationships existing between the owner(s) and employees(s) of the aforementioned contractor and the school district’s superintendent and/or board members
3. I have authority to bind the aforementioned contractor with the representations contained herein, and I am fully aware that the school district will rely on my representations in evaluating bids for the construction project.
4. I declare the above information to be true to the best of my knowledge, information and belief. I could completely and accurately testify regarding the information contained in this affidavit if requested to do so.
(signature of affiant)
Dated ___________________
Subscribed and sworn before me in ________________County, Michigan, on the ______day of _________________, 200__
______________________________________(signature)
_______________________________________(printed)
Notary public, State of Michigan, County of _______________
My commission expires on _____________________________
Acting in the County of ________________________________
Iran Economic Sanctions Act Certification
I am the _____________________ of ____________________________________, or I (title) (Bidder Company) am bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the
Paging System Upgrades and Additions at Gull Lake Schools – Ryan Intermediate. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran
Economic Sanctions Act, MCL 129.311, et seq. ("Act"). I am fully aware that the school district will rely on my representations in evaluating bids.
I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.
(signature)
(printed)
(date)
Gull Lake Schools/Ryan Intermediate COMMUNICATIONS OVERVIEW 28 1000-1
SECTION 28 1000 – COMMUNICATIONS OVERVIEW
1.01 SECTION INCLUDES
A. This section provides a project overview and general project and Contractor requirements for technology work.
B. The “Contractor” as referred to in these specifications, shall be the bidder whose bid is eventually chosen as the winner.
C. The “Engineer” as referred to in these specifications, shall be Commtech Design and its representative on this project.
D. The “Owner” as referred to in these specifications, shall be Gull Lake Schools and its representatives.
E. In the detailed specifications and on the contract drawings, the phrases “or equivalent,”
“approved equivalent,” “approved equal,” “or equal” and “engineer approved equivalent” shall be used interchangeably and shall mean the same thing.
F. All equals, equivalents, or alternates shall be approved by the Engineer prior to ordering or installation. Without approval, deviation from the products listed in the specifications and on the drawings, shall be presumed to be nonconforming and shall be removed and replaced at the direction of the Engineer and at the Contractor’s expense.
1.02 DESCRIPTION OF PROJECT
A. Paging System
1. The audio and video systems in the building shall consist of but not be limited to:
a. Paging and Bell system additions
2. Re-use existing speakers and add new as shown.
3. Test all existing speakers to verify system prior to installation
4. Remove existing system.
5. Connect to speakers in the new sections that are previously installed. Extend cables to the new paging system.
6. The extent of the work shall be as shown on the drawing and detailed in these specifications B. Post installation documentation
1. Provide post installation documentation as per the specifications. Shall include but not be limited to:
a. Red-lined as-built drawings
b. As-built detailed connectivity of paging zones and speakers
c. As-built cable locations and cable labels at each location.
d. Mark all splice locations
e. Spreadsheet (hard copy and Excel file) for all network, Wireless, telephones and cameras detailing:
A) Mfg. Part number B) IP Address C) MAC Address D) Device number (Camera #, Telephone # etc)
1.03 STORAGE OF MATERIALS
A. All materials shall be secured when not in use by the Contractor.
B. It shall be the Contractor’s responsibility to secure all equipment including all material to be installed as part of the contract. No changes shall be made to the contract due to loss or theft of equipment and materials not officially accepted by the Owner.
1.04 PERMITS
Gull Lake Schools/Ryan Intermediate COMMUNICATIONS OVERVIEW 28 1000-2
A. The State of Michigan requires that the Contractor apply for and obtain permits for data telecommunication installation.
B. This is required under State of Michigan Public Act 230. The inspector at the State of Michigan states that the code never exempted data telecommunications from permits and previous rules had overstepped their bounds. Only exemptions to the permit requirements are found in Public Act 230 MCL125.1528a.
1. There is not a license required to apply for a permit per Public Act 407
MCL339.5737(3)(o).
C. The Permit is required under Public Act 230. The permit is under 2017 Michigan Electrical
Code rules Part 8.
D. People who can obtain the permit include the Owner of the building or a company representing the owner. See Public Act 230 MCL125.1510.
1. Contractor shall be required to apply for and obtain the permit
2. Contractor shall be required to install the data telecommunications system to fully meet all code requirements and requirements of the Inspector and Authority Having Jurisdiction (AHJ)
E. State inspector has noted that the inspection process for data telecommunications is the same as any other inspection.
1. Do not cover or conceal any wiring without approval.
2. Electrical Inspectors will be conducting the inspections.
3. Contractor shall be responsible for scheduling the inspections and attending the inspections with the inspector F. State inspector has noted that the inspectors will be inspecting for code compliance including manufacture’s installation instructions for the cables and terminations.
G. An installation may not pass inspection if there is any Non-compliance with the code.
1.05 REFERENCE SPECIFICATIONS-CABLING
A. All work applicable shall conform to the following standards:
B. ANSI/TIA-568-C.0, “Generic Telecommunications Cabling for Customer Premises”, C. ANSI/TIA-568-C.1, “Commercial Building Telecommunications Cabling Standard”, D. ANSI/TIA-568-C.2, “Balanced Twisted-Pair Telecommunication Cabling and Components
Standard”, ANSI/TIA-568-C.3, “Optical Fiber Cabling Components Standard”, E. ANSI/TIA-568-C.4, “Broadband Coaxial Cabling and Components Standard”, F. ANSI/TIA/EIA-569-B Commercial Building Standard for Telecommunications Pathways and
Spaces G. IA-606-B: Administration Standard for the Telecommunications Infrastructure of Commercial
Buildings including all Updates and Addenda.
H. TIA-607-C: Generic Telecommunications Bonding and Grounding (Earthing) for Customer
Premises.
I. EIA-472 General Specification for Fiber Optic Cable J. EIA-472A Sectional Specification for Fiber Optic Communication Cables for Outside Aerial K. EIA-472B Sectional Specification for Fiber Optic Communication Cables for Underground and
Buried Use L. EIA-472C Sectional Specification for Fiber Optic Communication Cables for Indoor Use M. EIA-472D Sectional Specification for Fiber Optic Communication Cables for Outside
Telephone Plant Use N. NEC, 2015, or latest edition available O. IEEE 802.3af PoE • Ratified in 2003 • 15.4W at the PSE, with min of 12.95W available to the
PD
P. IEEE 802.3at PoE+ • Ratified in 2009 • 34.2W at the PSE, with min of 25.5W available to the
PD
Q. IEEE 802.3bt-2018 - IEEE Standard for Ethernet Amendment 2: Physical Layer and
Management Parameters for Power over Ethernet over 4 pairs
1.06 CONTRACTOR-ALL
Gull Lake Schools/Ryan Intermediate COMMUNICATIONS OVERVIEW 28 1000-3
A. Each contractor shall be responsible for inspecting their own work and ensuring it meets the project requirements.
B. Contractor shall have a project manager who will be responsible for all work, workers, equipment, cabling and project management for their work. The project manager shall have the authority to make decisions for the contractor and schedule all workers.
C. Contractor shall attend all project meetings throughout the project.
D. All work on the project shall meet all applicable state, federal, local and industry codes and be installed according to the requirements of the Authority Having Jurisdiction (AHJ).
PART 2 - PRODUCTS
2.01 FIRESTOPPING
A. Each contractor shall be responsible for firestopping around their cables and the raceways.
B. Shall be completed inside and around all conduits after cable installation.
C. Firestop for the area between the cable and the edge of the conduit shall be Nelson No. FSP, CLK or LBS+. Contractor shall install the best firestop for each individual installation.
1. Firestop shall be installed with regard to local and national building codes.
2. The firestop shall be a putty like substance that expands under heat and will not allow flame to pass for a designated period of time.
3. Firestop shall conform to all NEC, NFPA, and UL requirements.
4. Some wall pass-thru’ s are shown on the drawings. The Contractor shall utilize these where possible.
5. Where the contractor must install cables through a wall where there is no pass-thru already provided, the Contractor shall be responsible for installing a fire-rated pass-thru and fire-stopping the conduit after cable installation.
D. Firestopping is required at all riser conduits and all pass thru’s.
1. Each cable tray penetration of a wall shall be firestopped after cable installation. Use pillow type firestop to allow additional cables to be installed in the future.
2. Where riser conduits pass through floors, the area between the concrete and the conduit shall be firestopped. This shall be completed with a putty or liquid firestop product. Fill in the space with mineral wool, and then install the firestop on top. All firestop shall be of sufficient thickness to secure the rating required by code.
3. After final cable installation, install a putty firestop around all cables where they enter and exit conduit pass thru’s and conduit risers.
4. All firestop shall be installed to provide the fire rating as described by local fire code.
5. It shall be the responsibility of the Contractor to verify that all conduits, walls, and raceways required to be firestopped have been firestopped.
6. Contractor shall provide a label at each penetration and firestop location detailing the
UL rated fireproofing solution that was used in the specific application.
a. Apply sticker to the wall near the firestopped conduit.
b. Provide a sample of the label to the designer for review as part of the submittals.
PART 3 - EXECUTION
3.01 INSTALLATION
A. Contractor shall be familiar with the location(s) where the work will be done. No additional compensation will be made for items the Contractor claims he was not aware of during bidding.
B. Work Area:
1. All work areas shall be cleaned at the end of each day. All debris shall be cleaned and removed from the site and disposed of in the approved container for the site.
2. All equipment shall be moved out of common areas and stored in the Contractor’s lay down area, or in other approved storage locations on site.
3. Any work that is low hanging or may otherwise impede the general use of the space, and cannot be removed, shall be flagged and cordoned off by the Contractor.
Gull Lake Schools/Ryan Intermediate COMMUNICATIONS OVERVIEW 28 1000-4
C. All equipment and parts shall be installed in a neat and workmanlike manner. Good installation principles shall be used throughout the project.
D. All cables routed above the drop ceiling or in the ceiling area shall be installed square to the building. Diagonal cable runs are not permissible.
E. All cut edges of conduits, boxes, raceway, etc., shall be trimmed and filed so that no burrs or rough edges will damage cable as it is installed.
F. All surface raceways, including conduits in exposed areas shall be painted to match the existing colors of the surrounding area.
G. If, in the course of the work, the Contractor damages, marks, or misplaces any ceiling tiles, the Contractor shall repair, and/or replace the ceiling tile to the original condition.
1. The Engineer shall decide if ceiling tiles have been damaged. Based on the
Contractors proposed fixes, the Engineer shall decide the best course of action to repair any damage done by the Contractor to the ceiling tiles.
H. It shall be the responsibility of the Contractor to repair any damage done to the structure or finishes in the building by the Contractor. The building shall be returned to its original condition prior to final sign off of the project.
I. Firestop shall be installed to meet national and local codes.
3.02 DOCUMENTS
A. The Contractor shall fully read the contract documents including the detailed specifications, and the detailed drawings.
B. No additional compensation shall be made for any portion of the project which the Contractor did not know of or understand prior to providing the bid response.
C. In the case of any discrepancies between the detailed drawings and the detailed specifications, the Contractor shall provide the higher quality or more stringent requirement.
3.03 WORK PLAN-POST BID (CHOSEN CONTRACTOR ONLY)
A. Along with the submittals the Contractor shall provide a work plan for the implementation of the telephone switch and data/wireless network. The plan shall include scheduled dates for major milestones, and all phases required for completion prior to final cutover.
B. The work plan shall list all items that must be completed by the Contractor or Owner to provide a smooth install of the telephone system and data network. The Contractor shall be responsible for all costs associated with the planning and cutover. The Owners only responsibility is to act as a liaison between the Contractor and the users.
C. The work plans shall include a timeline and a cutover date for the systems within each building. Contractor shall be responsible for all aspects of scheduling the work, including notification of the users, the administration, and the telephone service provider.
D. The work shall commence within 10 days of award of the contract. The Contractor shall be responsible for attending weekly project meetings at the Owner’s site to report on progress and keep the project team informed of the work being done
E. The work plan will be reviewed at each weekly meeting for compliance and updates.
F. Work shall immediately begin on site surveys to determine the existing infrastructure and determining placement of new system electronics. The Contractor shall be responsible for moving, relocating, and reconnecting any and all existing equipment required for the installation of the new systems.
G. After work plan and system approval by the Engineer the Contractor can begin work on infrastructure work that does not impede users.
H. The Contractor shall be responsible for working with the Owner’s Information Technology staff and administrators.
END OF SECTION 28 1000
Gull Lake Schools/Ryan Intermediate PAGING & BELL SYSTEM 28 1800-1
SECTION 28 1800 – PAGING AND BELL SYSTEM
A. This section provides detailed specifications for the upgrade of the existing audio Paging/Bell system in the building.
1.02 DESCRIPTION OF PROJECT
A. The school shall have an upgraded paging/bell system.
1. The system shall consist of, but not be limited to speakers, cabling, additional headend equipment.
2. System shall be a two-way with talkback for each classroom.
3. Integral to the system shall be a programmable bell system that will work through the paging system speakers. The bell system shall allow multiple bell schedules and programming of bell schedules by the owner.
4. Speakers shall be installed where shown on the drawings. The different paging zones shall be wired individually for occupied spaces.
5. Control of the zones and bells and other configuration parameters shall be via a Windows or Apple based PC interface. The control system shall allow dynamic change of paging and bell groupings as well as the bell schedule.
6. The paging system shall be fully integrated into the telephone system so that announcements can be made from any phone within the school.
7. The paging system shall derive its time from the internet or from a national standard time device. The paging system shall be set to exactly the same time as the clock system.
B. The school has an existing Simplex 5100 Series paging system that shall be replaced.
1. The headend system shall be replaced
2. Connect all existing paging speakers and call buttons to the new system.
3. Extend the existing cabling to the new system head end.
4. Install new speakers and cabling to support those speakers
1.03 SHOP DRAWINGS
A. Shop drawings shall be submitted by the Contractor for approval prior to installation of the work. The shop drawings shall show all data relating to the structural, electrical, wiring diagrams, etc.
1. Create a one-line diagram showing connectivity.
B. The wiring and connectivity to be added to any racks and wallfields shall further be shown.
Changes shall be reflected on existing layouts where applicable. For all new racks or wallfields required, the Contractor shall show a total elevation view of the layout.
C. Shop drawing shall specifically detail speaker zones and their associated zone designations.
1.04 CONTRACTOR
A. The Contractor shall accept complete responsibility for the installation, certification, and support of the system. Contractor must show proof that they have the certifying manufacturer's support on all of these issues.
B. All work shall be performed and supervised by technicians and project managers who are qualified to install Integrated paging/bell systems and cabling and to perform related tests as required by the manufacturer in accordance with the manufacturer's methods.
C. The vendor (including Subcontractor(s) if any) shall have a proven track record in paging and bell system configuration and installation. This must be shown by the inclusion of details of at least 3 projects involving the installation of like sized systems that have been completed by the vendor in the last 2 years.
Gull Lake Schools/Ryan Intermediate PAGING & BELL SYSTEM 28 1800-2
2.01 MANUFACTURERS
A. The manufacturer of the paging/bell system shall have been designing, manufacturing, and installing systems for a period of no less than 5 years.
B. Approved manufacturers,
1. Carehawk System
2. Others as submitted and approved prior to bid. Submit a request for an approved alternate to bret@commtechdesign.com
2.02 MATERIALS
A. The paging system and associated bell system shall provide at a minimum the following functions and features:
1. The integrated paging/bell system shall allow administrators to make announcements or sound tone events to any individually wired group of speakers, or any electronically combined group of speakers or any individual classroom.
2. Shall be a talk-back, two-way system that supports calling from the telephone system and allows two-way communications between the caller and person in the room. This communication shall be through the ceiling speaker.
3. Administrators shall be able to access the speakers through any telephone tied directly into the telephone system or designated paging system handset.
4. System shall interface with any telephone system, thus allowing an upgrade or replacement of the telephone system without suffering a requirement to replace, or lose any feature of, their paging system. Any system that limits system features based upon any selected telephone system, and/or is proprietary to one or only a few telephone systems shall not be acceptable.
5. Pass codes shall be available to restrict access to the system if the owner deems them necessary.
6. Speaker zones shall be software assignable to different owner required groups. These groups shall be independent of the time/bell groups.
7. Provide time/bell schedules with the ability to automatically administer 8 or more schedules at any given time.
a. Each scheduled event shall be capable of utilizing any one of 5-user defined internal tones/auxiliary sources. Automatically administered schedules shall be capable of simultaneous operation.
b. Schedule administration, modification and creation functions must be available through administration PC software.
c. Systems that do not allow the management of schedules with PC software shall not be acceptable.
d. Bell tones shall be through Windows Media files or equal and shall be fully customizable.
8. Distribution of general announcements shall be possible from any administrative telephone, staff telephone, or classroom telephone. The system shall be capable of providing all-call, group call, multiple group call, individual classroom calls or dial-on-the-fly page groups.
9. The system shall provide for the distribution of emergency announcement(s) from any authorized telephone to all areas furnished with a loudspeaker. Emergency announcements shall have the highest system priority
10. The system shall be capable of providing up to four (4) simultaneous amplified-voice intercom paths. One amplified intercom path shall automatically be provided with each increment of 24 stations of system capacity.
a. All hardware, etc., required to achieve the maximum number of amplified-voice intercom channels for this system shall be included in this submittal.
mailto:bret@commtechdesign.com
Gull Lake Schools/Ryan Intermediate PAGING & BELL SYSTEM 28 1800-3
11. Amplified-voice intercom channels shall provide voice-activated switching. Systems requiring the use of a push-to-talk switch on administrative or enhanced staff telephones shall not be acceptable.
B. The electronics of the paging/bell system shall have the following capabilities:
1. The system shall be microprocessor based and shall be capable of handling up to 48 points or more as the system connectivity requires. See drawing for zone and classroom requirements
2. System shall be modular in design and capable of expanding in increments for flexibility and expandability.
3. Programmable features shall be stored in non-volatile memory and shall not be lost due to power failures.
4. System functionality must include the capability to manually distribute any number of tones or pre-recorded files via pushbuttons, contact closure, or dial up tones from any administrative telephone. These tones shall be customizable with respect to cadence, type, and duration. Dial up tones must only be accessible by authorized users.
5. The system shall have the ability to control all system relays. Relays shall be DTMF controlled, automatically cycle at a programmed time of day, follow time schedule events, follow time group events, follow security calls, and follow emergency and ADA calls. All relays must be software programmable with the flexibility to change as required.
6. The system shall provide at least three simultaneously operating, non-restrictive program distribution channels. The audio program material shall be controlled and distributed with administration PC software allowing simple and easy changes.
Systems that require manual operated switch-banks or DTMF telephone codes for distribution shall not be acceptable.
7. The system shall be capable of adding auxiliary inputs such as an Ipod, MP3 player or CD player to play over any group of speakers at a certain time. The auxiliary input shall be assignable just like bell tones and announcements.
a. Shall be assignable to play during passing time between classes.
8. See the drawings for the paging zones required.
9. Shall tie to the national time clock to keep the bell system on the correct national time.
Provide equipment and cabling required to keep the bell system on the correct time.
C. The interface for control of the time events and paging groups shall be via a PC with an
Ethernet connection to the network.
1. Control software shall be installed and reside on three (3) administrator’s PC’s. The software shall guide the user through the setup and control of all aspects of the paging and bell system.
2. Provide a 1, 2, 3, or 4 digit numbering plan, thus allowing the zone to be custom numbered as per the owner’s requirements.
3. Individual groups of speakers wired in sequence shall be assignable to a distinct number. The system shall have the capability of assigning numerous groups of wired speakers to one dialing group. All groups shall be programmed by the Contractor prior to acceptance of the system.
4. The control software shall be a Windows-based, GUI interface that allows the owner to control zones and the bell schedule.
D. The actual system electronics shall be capable of being mounted in a standard 19-inch relay rack or being mounted on a communications wallfield.
1. Power shall be from a standard 110V AC outlet or UPS system.
2. System shall have a ground connection that can be attached directly to a telecommunications ground bar.
3. If the system is to be installed in a 19” communications rack or cabinet, the contractor shall provide that cabinet.
2.03 SPEAKERS
A. Speakers for all drop-ceiling areas, unless otherwise noted shall be 8 inch speakers that fit directly into the drop ceiling tile.
Gull Lake Schools/Ryan Intermediate PAGING & BELL SYSTEM 28 1800-4
1. Speaker shall be an 8 inch loudspeaker with a painted white baffle.
2. Each speaker shall have a 6oz. magnet.
3. Sensitivity shall be 95dB at 4ft/1W.
4. Speaker voltage shall be 25 or 70 volt.
5. Provide a tile bridge with each speaker for installation in a standard drop ceiling.
6. Provide a backcan for each speaker.
7. Speaker shall have taps at 1/8W, 1/4W, 1/2W, 1, 2 and 4 watts.
8. Shall be capable of talkback through intercom/paging system.
9. Each speaker shall have an individual volume control on the speaker.
10. Paging system speakers for drop ceilings shall be Atlas Sound # SD72W or equal.
11. Where the speaker shall be mounted flush into the drywall the contractor shall provide a backbox for the speaker.
B. Speakers for exterior, gymnasium, and mechanical spaces shall be horn type speakers:
1. Horns for the exterior of the building shall be 15-watt horns that are weather-resistant.
2. Each horn shall be capable of being mounted to a standard double-gang backbox.
Speaker cables shall route through the base of the speaker and shall not be exposed.
3. All horns shall be white in color and be capable of being positioned anywhere in a 360-degree axis.
4. Exterior 30-watt horns shall be Atlas Sound GA-30T or equal.
C. Speakers for indoor areas where there is no drop ceiling shall be installed inside a backbox that provides support for the speaker when mounted directly to the building structure.
1. Speaker shall be an 8-inch loudspeaker with a painted white baffle and backbox.
2. Each speaker shall have a 10oz. magnet.
3. Sensitivity shall be 92dB at 1M/1W.
4. Speaker primary voltage shall be 70Volt.
5. Shall be capable of talkback through intercom/paging system.
6. Provide all mounting hardware required to attach speaker and backbox to the building structure.
7. Speaker shall have 70 volt taps at .25, .5, 1.2 and 4 watts.
8. Paging system speakers for drop ceilings shall be Atlas Sound # SBMS or equal.
2.04 AUXILIARY EQUIPMENT
A. Auxiliary audio input (combination CD Player or MP3 player) for the paging system:
1. The paging system has the ability to take an auxiliary audio input for playing audio through the paging system speakers.
2. Install a wire and faceplate in the school office to allow auxiliary input. Label for paging system input.
B. Desktop microphone for paging system:
1. The microphone shall be a desktop model that has a locking mechanism on the control bar.
2. Pickup of the microphone shall be omni-directional while being tailored for speech pick-up.
3. Frequency response shall be 200-5,000Hz.
4. Microphone shall have a cable that terminates in an XLR connector and is compatible with the XLR connector at the microphone faceplate.
5. The desktop microphone shall be a Shure # 522 or Engineer approved equivalent.
C. Cables:
1. The contractor shall install all cables required for connectivity of each new speaker zone throughout the building. All cabling routed above the drop ceiling shall be plenum rated. See drawings for new speakers and associated zones.
2. Install cabling required for connection of the paging/bell system to a control PC in the administration office.
3. All cabling required for complete system functionality and control and interface with the telephone system shall be installed, labeled and terminated by the contractor.
4. Label the cables with a wrap-around label at each speaker and at the paging system.
Label it for the zone to which it is connected.
Gull Lake Schools/Ryan Intermediate PAGING & BELL SYSTEM 28 1800-5
D. Existing cabling
1. There is an existing paging system at room 114. This system shall be removed from the building.
2. Re-use the cables from the existing system and the existing zones.
3. Install a backbox and terminal strip to terminate the existing cables above the ceiling or in an inconspicuous location.
4. Terminate all existing cables. Tone each cable to determine the zone and room it connects to.
5. Install new cables for each zone from the 66 block to the new paging system location.
Shall be plenum rated cables.
6. Label the new cables at the new paging system with the zone to which they connect
PART 3 - EXECUTION
3.01 INSTALLATION
A. Contractor shall be familiar with the location(s) where the work will be done. No additional compensation will be made for items the Contractor claims he was not aware of during bidding.
B. Work Area:
1. All work areas shall be cleaned at the end of each day. All debris shall be cleaned and removed from the site and disposed of in the approved container for the site.
2. All equipment shall be moved out of common areas and stored in the Contractor’s lay down area, or in other approved storage locations on site.
3. Any work that is low hanging or may otherwise impede the general use of the space and cannot be removed shall be flagged and cordoned off by the Contractor.
C. All equipment and parts shall be installed in a neat and workman like manner.