PGS-P-10-16-LT-7001_PA_Amend_0003.pdf

PDF 19 KB Posted

Attached to
Port Angeles Federal Building Fire Alarm Replacement Project
Solicitation number
GS-P_10-16-LT-C-7001_PA
Issued by

About this file

SF 30 for Amendment 003.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer (Type or Print) 16A. Name and title of Contracting Officer (Type or Print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States of America

(Signature of Contracting Officer)

16C. Date Signed

(Signature of person authorized to sign)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)

PREVIOUS EDITIONS UNUSABLE Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. Contract ID Code Page of Pages

1 2

2. Amendment/Modification No. 3. Effective Date 4. Requisition/Purchase Req. No. 5. Project No. (if applicable)

0003 09/13/2016

6. Issued By 7. Administered By (If other than Item 6) Code General Services Administration Acquisition Division, Construction Acquisition Branch (10PQC)

See Block 6

400 15th St SW Auburn, WA 98001 Keith Goodsell (253)931-7775

8. Name and Address of Contractor (No., Street, County, and Zip Code) (X) 9A. Amendment of Solicitation No.

X

GS-P-10-16-LT-7001 PA

9B. Date (See Item 11)

07/29/2016 10A. Modification of Contract/Order No.

10B. Date (See Item 13)

Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers x is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG-

MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT

IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to: (Specify authority) The changes set forth in item 14 are made in the Contract Order No. in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.)

Set fourth item 14, pursuant to the authority of FAR 43.103 (b)

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 3 copies to the issuing office.

14. Description of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Design Build Contract for Project Port Angeles Federal Building Fire Alarm Replacement

Solicitation: GS-P-10-16-LT-7001 PA Amendment 0003

1. The Solicitation is hereby amended as follows

a. The Agreement, dated 07/27/2016, is replaced with the Agreement, dated 09/13/2016.

The changes include update of the wage determination, inclusion of documents incorporated in previous amendments.

b. There is a conflict noted in Submittal requirements for Factor 3 (a) Description and Factor 3 (a) 1. Iv.

Which is resolved by adding the following in Blue:

Only one individual for each key position shall be submitted (with the exception noted in

iv. Regarding DBM acting as CPM and FASD) – if more than one resume is provided for a Key Personnel position, the Government may deem this Factor to be deficient.

iv. The DBM may also serve as the Construction Project Manager and/or Fire Alarm System Designer.

2. The date and time receipt of revised electronic technical proposals 09/14/2016 at 8:00 p.m. Pacific time. Hard copy proposals are due the within twenty-four hours if pricing has changed.

File details come from the government source that posted it. Updated .