This document is a presentation that provides an update on the status of construction and renovation activities in Building 2, Building 27, and Building 27N at the Goddard Space Flight Center (GSFC) in Greenbelt, Maryland.
The presentation covers ongoing construction and renovation work in Building 2, including wall close-in inspections, drywall taping and finishing, duct installation, and electrical and fire alarm rough-in. It also provides an update on the relocation of the main gate, including the status of the pre-construction meeting for Phase 3 construction on NASA property and the concept submission for Phase 4 design on SHA property. Additionally, the presentation discusses the design progress for the new main gate sign and the existing main gate turnstiles/sally port.
The document also includes information about the utilities serving Building 2, Building 27, and Building 27N, such as communication, storm drain, sanitary line, electric, potable water, and steam lines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GSFC RFI .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Aeronautics and Space Administration www.nasa.gov
GSFC/Greenbelt Partnership Areas
Building 2 area, Building 27 area and Building 27N
Date: March 20, 2024
GSFC Greenbelt Site Map Building 27 Area
Building 2 Area
Building 27 N
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
New Main Gate Sign and Existing Main Gate Turnstiles / Sally Port Design:
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 2 Area
138,600 SQ.FT
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 2 Utilities
Communication
Storm Drain
Sanitary Line
Electric
Potable Water
Steam Line
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 27 Area
13,500 SQ.FT
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 27 Utilities
Communication
Elec Feeder 54
Communication
Steam line
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 27N
2,477 SQ.FT
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
Building 27N Utilities
Duct Bank Sewer Line
Communication
Steam line Communication
Elec Feeder 54
Presenter Presentation Notes B.17 Renovation Construction:
Wall close-in inspections ongoing, 2nd floor Drywall taping and finishing in progress, 2nd floor Completed wall framing, Mod 4 area, 2nd floor Duct installation continues, both floors Electrical and fire alarm rough-in continues, 1st floor Main Gate Relocation Phase 3 & 4:
Phase 3: Construction on NASA property – Received notification that the Contractor was ready for a pre-construction meeting. Pre-con held on 10/28/21.
Phase 4: Design on SHA property – The A-E has submitted a concept to SHA showing the ramp relocation 9/10/21. Waiting for SHA approval of concept.
All 90 % Review Comments were submitted, currently waiting for responses to the comments and to hold the 90% Design Review Meeting, the 100% Submission will follow this meeting.
| �GSFC/Greenbelt �Partnership Areas �Building 2 area, Building 27 area and Building 27N |
| Slide Number 2 |
| Slide Number 3 |
| Slide Number 4 |
| Slide Number 5 |
| Slide Number 6 |
| Slide Number 7 |
| Slide Number 8 |
File details come from the government source that posted it. Updated .