AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
03/14/2017
REQUISITION/PURCHASE REQ. NO.
EQWPMA-17-0028
PROJECT NO. (If applicable)
NDC00256
6. ISSUED BY CODE WPHBA 7. ADMINISTERED BY (If other than Item 6) CODE WPC
GSA, NCR, PBS,
Ofc of Acquisition (WPHBA) 301 7th Streets, SW Washington, DC 20407
GSA, NCR, PBS,
Property Development Division (WPC) 301 7th Streets, SW
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
9.A. AMENDMENT OF SOLICITATION NO.
ALL PROSPECTIVE SMALL BUSINESS OFFERORS
(X)
GS-11-P-17-MK-C-0009
9B. DATED (SEE ITEM 11)
03/08/2017
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning. copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return _____ copies to the issuing office with proposal.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
The Request for Quotations is hereby amended as follows:
The following changes, clarifications, additions and supplements are hereby incorporated into this
RFQ in their entirety as submitted. Continued on Page 2 of this Amendment Except as provided herein, all terms and conditions of the document reference in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Bonnie Echoles, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY _______________ .
(Signature of Contracting Officer)
16C. DATE SIGNED
03/14/2017
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
CONTINUATION OF SF 30: AMENDMENT OF
SOLICITATION/MODIFICATION OF CONTRACT
GS-11-P-17-MK-C-0009 - RFP
Amendment No. 2
RFP GS-11-P-17-MK-C-0009, Hitchcock Hall, Adaptive Reuse Building 37, St Elizabeths West Campus, SE, Wash., DC
REQUEST FOR PROPOSAL
ITEM A: PROPOSAL RECEIPT DATE, TIME and PLACE remain UNCHANGED as follows:
Tuesday, April 11, 2017 by 12:00 PM, LOCAL General Services Administration, NCR Regional Office Building – Property Development Division (WPC) 301 7th Street, SW, Room 4606
ITEM B: DELETE para. (1) Experience on Similar Projects of para. II.D. Technical Proposal and para. (a) Factor 1 - Experience on Similar Projects of para. VI.B. Lowest Price Technically Acceptable Evaluation Process, as issued in Solicitation Volume, in their entirety, and INSERT the following revised paragraphs in lieu thereof.
II.D. Technical Proposal
The Technical Proposal shall include the information requested below for the non-price factors described in Section VI.
(1) Experience on Similar Projects This factor evaluates the extent of the Offeror’s past experience as a firm in providing similar construction services to determine the firm’s experience in completing the tasks detailed in the performance work statement.
The Offeror must demonstrate successful experience as a General Construction (GC) Contractor responsible for the construction of at least two (2) similar projects (maximum
5) substantially completed within the last eight (8) years. Projects shall be considered “similar” if they meet five (5) of the following characteristics:
● Project involved the renovation or the modernization of a comparably sized structure;
● Project was performed in an occupied and functioning office building;
● Project involved all of the following disciplines - architectural, civil, structural, HVAC, plumbing, electrical, fire alarm, elevator, and telecommunications;
● Project included historic restoration and repair of a building listed or eligible to be listed on the National Register of Historic Places;
● Project included Hazardous Material abatement (e.g., asbestos, lead, PCBs, mold, etc).
GS-11-P-17-MK-C-0009 - RFP
● Project included requirements for noise control
● The total project construction cost at award of the construction contract(s) was not less than $10 million.
VI.B. Lowest Price Technically Acceptable Evaluation Process
(1) The Government will evaluate all technical proposals on a pass/fail basis to determine all offers that meet the minimum technically acceptable requirements. Failure to meet a requirement may result in an offer being determined technically unacceptable.
An unacceptable rating for any one factor makes the entire proposal unacceptable. Any costs incurred by offerors in preparing or submitting offers are the offerors' sole responsibility; the United States will not reimburse any offeror for any proposal preparation costs.
(2) Award will be made on the basis of the lowest evaluated price of proposals meeting the acceptability standards for non-price factors.
(3) The following non-price factors will be evaluated for acceptability:
(a) Factor 1 - Experience on Similar Projects
Evaluation Criteria: This factor evaluates the extent of the Offeror’s past experience as a firm in providing similar construction services to determine the firm’s experience in completing the tasks detailed in the performance work statement.
Acceptability Standard (Pass): The Offeror must demonstrate successful experience as a General Construction (GC) Contractor responsible for the construction of at least two (2) similar projects substantially completed within the last eight (8) years. Projects shall be considered “similar” if they meet five (5) of the following characteristics:
● Project involved renovation or the modernization of a comparably sized structure;
● Project was performed in an occupied and functioning office building;
● Project involved all of the following disciplines - architectural, civil, structural, HVAC, plumbing, electrical, fire alarm, elevator, and telecommunications;
● Project included historic restoration and repair of a building listed or eligible to be listed on the National Register of Historic Places;
● Project included Hazardous Material abatement (e.g., asbestos, lead, PCBs, mold, etc).
● Project included requirements for noise control
GS-11-P-17-MK-C-0009 - RFP
● The total project construction cost at award of the construction contract(s) was not less than $10 million.
ITEM C: The US Department of Homeland Security (DHS) intends to contract directly with General Dynamics Information Technology (GDIT) to procure services for the audio/visual and cabling for Hitchcock Hall.
ITEM D: Offerors must acknowledge any and all amendments, giving amendment number and date, on offer form.
END OF AMENDMENT NO. TWO
| 2017-03-14T13:40:12-0400 | |
| BONNIE ECHOLES |
File details come from the government source that posted it. Updated .