SCOPE

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation GS-11-P-17-MK-C-0009, Hitchcock Hall, Adaptive Reuse Building 37, St Elizabeths West Campus, SE, Wash., DC

Hitchcock Hall / Bldg. 37 October 27, 2016

PROJECT IDENTIFICATION

A. PROJECT TITLE: St. Elizabeths : Phase 2, Adaptive Reuse

B. BUILDING: Hitchcock Hall, Building 37

C. LOCATION: 2701 Martin Luther King Jr. Ave, SE Washington, DC (West Campus)

BACKGROUND

In 2005, the General Services Administration (GSA) and the Department of Homeland Security (DHS) began working on plans to consolidate DHS headquarters functions into a single campus location. As a result, the West Campus of St. Elizabeths is being redeveloped into a secure federal campus for elements of DHS. The entire St.

Elizabeths Hospital campus is a National Historic Landmark (NHL). The redevelopment involves the rehabilitation and reuse of existing historic buildings in addition to new construction.

Hitchcock Hall, a 28,700 gsf historic building, will serve as the primary facility in which the Secretary of Homeland Security will hold formal press briefings with the media. The building will also be used to hold conferences and meetings. The rehabilitation of Hitchcock Hall originally began in 2011 as part of the Phase 1 construction and was subsequently placed on hold. The project currently exists in a partially completed state.

1.0 SCOPE OF SERVICES

The Contractor shall provide all construction services, supervision, management oversight and coordination needed to provide DHS and GSA with a complete project as described within the project plans and specifications developed by Perkins+Will Architects. This includes, but is not limited to, site work, interior and exterior demolition work, concrete work, structural repairs, new masonry work, masonry restoration, architectural restoration / repair work, plaster work, interior millwork, partitions and architectural finishes, roofing, aluminum storefront, curtain wall system, window restoration, historic doors, stage rigging system, audience seating, hydraulic elevator installation, mechanical electrical and plumbing systems, fire protection systems, pathways for communications systems, and rough-in work for audio visual and security systems.

2.0 PERFORMANCE OF WORK

2.1 The Contractor shall participate in a pre-construction survey with Government representatives to review and document the existing conditions surrounding the project premises prior to the start of any construction activity.

Hitchcock Hall / Bldg. 37 October 27, 2016

2.2 The Contractor shall participate in regularly scheduled progress meetings with Government representatives. Participation in separate coordination meetings with Government contractors will be needed throughout the course of the project.

2.3 All work shall be performed in accordance to with the project construction documents, applicable codes, construction industry standards, procedures and regulations issued by authorities having jurisdiction.

2.4 The Contractor is responsible for collecting and submitting the names and information for all employees who are assigned to work on site and needing a badge. This will include employees working for each of the subcontractors. The Contractor is also responsible for coordinating the required visitor’s badges for drivers making construction related deliveries.

2.5 The Contractor shall notify and coordinate any planned outages in a timely manner. The request for all planned outages impacting building systems must be submitted and approved 72 hours (three full business days) in advance of the requested event. This project notification requirement also applies to road closures (full or partial) and special gate access needs.

2.6 The Contractor shall verify the quantities for government furnished property which is turned over for Contractor installation. Various building materials intended for project use were purchased under a prior contract and are currently stored throughout the building.

A material inventory log is included as part of the project specifications.

2.7 The Contractor shall provide all required submittals, shop drawings, samples and coordination drawings in a timely manner so not to delay or negatively impact the project schedule.

2.8 The Contractor shall provide mock-up installations for the architect’s approval as required by the project specifications.

2.9 The Contractor shall provide all necessary materials, equipment, tools, scaffolding, hoisting, transportation, storage (on-site and/or off-site), labor, supervision and management needed to successfully complete the project.

2.10 The Contractor shall provide all necessary project coordination between subcontractors, and government contractors for furniture installation, IT, physical security and audio visual systems.

2.11 The Contractor shall take all necessary precautions to prevent injury to the public, occupants and workforces. The Contractor shall be responsible for compliance with all applicable codes, standards and regulations pertaining to the health and safety of personnel during the duration of construction.

2.12 The Government is currently occupying a portion of the building. The Government will retain occupancy of the basement level Demarc Room for the duration of construction.

Throughout the entire period of construction, the Contractor is responsible for protecting the Demarc Room and its contents. The Contractor shall notify the GSA Project

Hitchcock Hall / Bldg. 37 October 27, 2016

Manager of any work impacting operations of the room. When access into the room is needed, the Contractor shall provide at least a 48 hour notice in advance.

2.13 The Contractor shall take all necessary precautions to protect surrounding areas and government property from damage.

2.14 The Contractor is responsible for daily clean-up and removal of debris created during the performance of the work.

2.15 Overall parking is limited on the St. Elizabeths West Campus. No on-site parking outside of the LOD (limits of disturbance) will be provided for the Contractor employees’ personal or work vehicles. The LOD can accommodate limited parking for a number of company vehicles, but off-site parking will be needed for Contractor employees.

3.0 PROJECT CLOSE-OUT

3.1 The Contractor is responsible for completing all punch list items in their entirety within a period of one month.

3.2 The Contractor shall be responsible for obtaining experienced workers or professional cleaners for the final cleaning. Final cleaning includes both the building interior and site.

3.3 As part of the project close-out procedure, the Contractor is responsible for submitting the required project record documents which includes as-built drawings which should be maintained and properly updated throughout the course of the construction activities.

3.4 The Contractor shall submit the required operation and maintenance manuals in addition to providing equipment and systems training sessions for Government operations and maintenance personnel.

3.5 Warranties and guarantees shall not begin until after substantial completion. Warranties and guarantees from the Contractor also apply to all Government furnished equipment.

3.6 The Contractor shall provide all necessary project coordination with the project’s Commissioning Authority as required throughout the project. The contractor shall perform commissioning team activities as referenced by the project specifications.

3.7 As part of the project close-out procedure, the Contractor is responsible for submitting all extra-stock material as required by the project specifications.