Attachment_3_CD_Pickup_Instructions.pdf
PDF 222 KB Posted
- Solicitation number
- GS-11P-15-YM-C-0084
About this file
Attachment 3 - CD Pickup Instructions
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 3 – Solicitation No. GS-11P-15-YM-C-0084
INSTRUCTIONS TO OBTAIN 100% CONSTRUCTION BID
DOCUMENTS FOR GENERAL CONSTRUCTION SERVICES FOR IRM
Office Project (SA-7B, SI Division):
The Construction Documents are available on CD and will be issued on the following dates and times:
Thursday, April 9th, 2015 from 9 am to 12 pm and 1 pm to 4 pm.
Friday, April 10th, 2015 from 9 am to 12 pm and 1 pm to 3 pm.
Monday, April 13th, 2015 from 9 am to 12 pm and 1 pm to 3 pm.
Tuesday, April 14th, 2015 from 8 am to 12 pm and 1 pm to 4 pm.
Wednesday, April 15th, 2015 from 9 am to 12 pm and 1 pm to 4 pm.
Pre-Solicitation/Site Visit on Thursday, April 16 th, 2015 from 11-12 noon.
You can email your forms in advance of the site visit and pick up the CD then.
After these dates, CD’s will be available by appointment. Please contact the Contract Specialist, Tracy Parker at tracy.parker@gsa.gov.
Those firms needing to obtain the CD must complete the attached Document Security Form and provide a copy of the firm’s Business License. The person picking up the CD must have a valid government-issued photo ID for identification and will need to show a form of company ID or proof of employment with that firm.
NOTE: All Drawings and Specifications documents pertaining to this project are at a minimum Sensitive but Unclassified (SBU) and shall be protected in accordance with Department of State and GSA standards. The Offeror shall turn over to GSA, all SBU documents received during the Solicitation Phase after the contract awards have been issued.
The Offeror shall NOT make any copies of the drawings or specifications without the expressed written permission of Diplomatic Security and GSA.
mailto:tracy.parker@gsa.gov
DOCUMENT SECURITY
NOTICE TO PROSPECTIVE BIDDERS/OFFERORS
This solicitation includes Sensitive But Unclassified (SBU) building information. SBU documents provided under this solicitation are intended for use by authorized users only. In support of this requirement, GSA requires bidders/offerors to exercise reasonable care when handling documents relating to SBU building information per the solicitation.
REASONABLE CARE:
1. Limiting dissemination to authorized users. Dissemination of information shall only be made upon determination that the recipient is authorized to receive it. The criterion to determine authorization is need-to-know.
Those with a need-to-know are those who are specifically granted access for the conduct of business on behalf of or with GSA. This includes all persons or firms necessary to do work at the request of the Government, such as architects and engineers, consultants, contractors, sub-contractors, suppliers, and others that the contractor deems necessary in order to submit an offer/bid or to complete the work or contract, as well as maintenance and repair contractors and equipment service contractors.
NOTE: It is the responsibility of the person or firm disseminating the information to assure that the recipient is an authorized user and to keep records or recipients.
Authorized users shall provide identification as set forth below:
Valid identification for non-Government users. Authorized non-Government users shall provide valid identification to receive SBU building information. The identification shall be presented and verified for each dissemination. Valid identification shall be all items (a) through (c), below, and including item (d), as necessary.
(a) A copy of a valid business license or other documentation granted by the state or local jurisdiction to conduct business. The license at a minimum shall provide the name, address, phone number of the company, state of incorporation, and the name of the individual legally authorized to act for the company. The business must be of the type required to do the work. A general contractor's license may be substituted for the business license in states that issue such licenses. In the rare cases where a business license is not available from the jurisdiction, the information shall be provided and testified to by the submitter; and
(b) Verification of a valid DUNS Number against the company name listed on the business license or certifications. Verification may be obtained through http://www.fpdc.gov, or by calling Dun &
Bradstreet at 703-807-5078 to set up an account; and
(c) A Valid IRS Tax ID Number of the company requesting the information; and, as necessary,
(d) A Valid picture state driver's license shall be required of person(s) picking up SBU documents.
Phone verification must be made to a previously validated authorized user that the individual(s) picking up the documentation is authorized to do so by the company obtaining the documents. SBU documents will not be released to any individual or firm who has not, either previously or at the time of pickup, supplied the required documentation as outlined in paragraphs (a) though (c), above.
2. Retaining and destroying documents. The efforts required above shall continue throughout the entire term of the contract and for whatever specific time thereafter as may be necessary. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning or shredding hardcopy, and/'or physically destroying CD's, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
http://www.fpdc.gov/
3. Term of Effectiveness. The efforts required above shall continue throughout the entire term of contract and for what specific time thereafter as may be necessary, as determined by the Government. Necessary record copies for legal purposes (such as those retained by the architect, engineer, or contractor) must be safeguarded against unauthorized use for the term of retention.
4. Written agreement of disposal. For all contracts using SBU building information, the contractor shall provide a written statement that he and his subcontractors have properly disposed of the SBU building documents, with the exception of the contractor's record copy, at the time of Release of Claims to obtain final payment. Documents no longer needed shall be destroyed (such as after contract award, after completion of any appeals process or completion of the work). Destruction shall be done by burning, or shredding hardcopy, and/or physically destroying CDs, deleting and removing files from the electronic recycling bins, and removing material from computer hard drives using a permanent erase utility or similar software.
The recipient acknowledges the requirement to use reasonable care, as outlined above, to safeguard the documents and, if not awarded, the contract (and at the completion of any protest/appeal process) will make every reasonable and prudent effort to return to GSA, destroy or render useless all SBU information received during the solicitation.
I agree that I will abide by this agreement and will only disseminate Sensitive But Unclassified (SBU) building information to other authorized users under the conditions set forth above.
Signature:
Firm Name:
Title:
Date:
Copy of business license attached
** I will submit a valid copy of my firm/company's business license to Tracy Parker in person or via email at tracy.parker@gsa.gov.
DUNS Number:
Verified: Yes No.
IRS Tax ID Number_ mailto:%20tracy.parker@gsa.gov.
mailto:%20tracy.parker@gsa.gov.
File details come from the government source that posted it. Updated .