Amendment #5- GS11P14MKC0066- 3.10.15
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF
PAGES
2. AMENDMENT/MODIFICATION NO.
Amendment 5
3. EFFECTIVE DATE
3/10/2015 REQUISITION/PURCHASE REQ. NO. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
General Services Administration, NCR Repair and Alterations-West (WPHBD) th & D Streets, SW, Room 2021
Washington, DC 20407
General Services Administration, NCR Repair and Alterations-West (WPHBD) th & D Streets, SW, Room 2021
Washington, DC 20407
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9.A. AMENDMENT OF SOLICITATION NO.
GS-11P-14-MK-C-0066
PROSPECTIVE OFFERORS X 9B. DATED (SEE ITEM 11)
2/13/15
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the followin
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of separate letter or telegraph which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF Y amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGE paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43
c. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return __1__ copies to the issuin
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter whe
Amendment 5 is being posted to FBO only. Please see Page 2.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OF
Denise Avery-Craft, Contracting Officer
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE
SIGNED
16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDAR
Prescribed
FAR (48 C
r is not extended.
g methods:
the offer submitted; or (c) By
TO BE RECEIVED AT THE
OUR OFFER. If by virtue of this makes reference to the
M 14 ARE MADE IN THE
S (such as changes in .103(b).
g office.
X
X re feasible).
FICER (Type or print)
16C. DATE SIGNED
D FORM 30 (REV. 10-83)
by GSA
FR) 53.243
Amendment #5- GS11P14MKC0066- 3.10.15
1) The following clarification is being provided for Question 31 of the Questions and Answers issued via Amendment #4 on 3/9/15.
Question 31 provided in Amendment 4 is as seen below:
31. Regarding Key Personnel PPQs, please confirm that the three (3) PPQs to be completed for each individual may be from the same relevant project. For example, if the Project Manager worked on the required one (1) relevant project, he/she may request Key Personnel PPQs from three (3) separate client references from that particular project?
ANSWER: The Past Performance Questionnaires for the two key personnel to be submitted should have experience on at least two (2) projects that meet the minimum criteria listed under Evaluation Factor 1-Experience of the Firm on Projects. It does not necessarily have to be exact same projects that the firm is using under that factor. The intent is to show that they are capable of handling projects of this size. The solicitation will be changed to reflect this update under II.D.5. “Submittal Required by Offeror,” for Evaluation Factor 5, to the following:
“The Offeror must submit two (2) Key Personnel Past Performance Questionnaires (PPQ) (Included in the solicitation as Attachment 2), on at least two (2) projects that meet the minimum criteria listed under Evaluation Factor 1- Experience of the Firm on Projects, completed by the applicable client for each Key Personnel included in its proposal for Factor 5, that meet the minimum characteristics herein.”
Additional clarification is being provided for the answer to Question 31:
Each Offeror must submit two (2) PPQs for each key personnel, the PPQs must apply to two (2) different projects that meet the minimum criteria listed under Evaluation Factor 1- Experience of the Firm on Projects.
2) The following clarification is being provided:
Specification Section 083473 calls for Sound Control Door Assemblies. There is only one door of this type that has to be sound rated with an STC of 50, “IC CONFERENCE” room 4-102.
3) The page limits are going to be increased from 80 numbered pages to 91 numbered pages. The proposal must not be greater than 91 numbered pages or (46) double-sided pages.
The page limits are as follows:
Evaluation Factor 1- 25 pages Evaluation Factor 2- 20 pages Evaluation Factor 3- 20 pages Evaluation Factor 4- 10 pages Evaluation Factor 5- 16 pages
4) The proposal due date is being extended to Thursday, March 19 th , 2015 by 2:00PM. The location for submission remains unchanged.