SF_30_(AM0003).pdf
PDF 111 KB Posted
- Solicitation number
- GS-10-P-17-LS-C-0002
About this file
SF 30 (AM0003)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30_(AM0004).pdf | ||
| SF_30_(AM0002).pdf | ||
| 7._Fire_Safety_Survey_Worksheet.docx | DOCX document | |
| SF_30_(AM0001).pdf | ||
| RFQ_Pkg.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
AM0003
Please see attached.
GSA Northwest Arctic Region 10 Public Buildings Service Acquisition Management Division 400 15th St SW, Auburn, WA 98001
EQ10PME-17-2020 ~ 2023
GS-10-P-17-LS-C-0002
1 3
05/31/2017
05/17/2017
Sue Saucier, Supervisory Contracting Officer
The purpose of this Amendment 0003 to RFQ GS-10-P-17-LS-C-0002 is to provide answers to the questions GSA received on May 30, 2017 and May 31, 2017 (answers are in blue font).
Questions and Answers
Q1. I have a couple of quick question regarding the survey reporting requirements as outlined in the subject solicitations. Specifically, the PWS includes the need to prepare an “Annual Fire Safety Survey” worksheet for each building surveyed. The PWS indicates that worksheet is attached. Are we correct in assuming that this requirement is actually referring to the NFPA’s “Fire Safety Evaluation System (FSES) worksheet for Business Occupancies” that was included with the solicitation package? We just wish to ensure that another specific document was not included with the solicitation package;
since the worksheet name included in the solicitation does not match that which was included in the package.
[A1] Refer to the attachment titled “7. Fire Safety Survey Worksheet” in Amendment 1.
Q2. Secondly, given that a newer edition (2016) of NFPA 101A exists, the Guide whereby this worksheet resides, are we to continue to utilize the 2013 edition of this worksheet; as this was the edition included in the package for each solicitation, or should we plan on utilizing the most recent edition published by NFPA? I thank you in advance for your assistance in this matter.
[A2] Offerors shall plan to utilize 2013 edition of NFPA 101A.
Q3. Answer A1b in Amendment 1 stated that “the offeror must have a minimum of 10 years as a registered fire protection engineer or a minimum of 10 years experience in the 0804 series within the Federal Government.” Does this mean all individuals performing the survey must have ten years of experience AFTER obtaining their FPE license? For example, one of our registered fire protection engineers is in their tenth year of experience, but only five of those years came after the individual obtained their license. Would that person satisfy the experience requirement?
[A3] All individuals performing the surveys must have a minimum of 10 years experience after obtaining their FPE license.
Q4. I have some questions about level of detail to which these surveys are taken, and seeing an acceptable previous example may answer those instead of me submitting another bunch of RFIs.
● PWS Paragraph 5.2.4 states that “A copy of a previous Fire Safety and Environmental Survey Report or Fire Safety Survey Report will be made available upon request to use as an example of what is expected for the written report.” Please provide a copy of a previous Fire Safety Survey Report.
[A4] Due to the proprietary nature of the report, a copy of the previous Fire Safety Survey Report will only be provided to the Awardee(s) after the award(s) is(are) made.
File details come from the government source that posted it. Updated .