ARRA PV Ground SF 30 Amend 0001 Continued.doc

DOC document 69 KB Posted

Attached to
RECOVERY Grid Tied Ground Mounted and Carport PV Systems, Denver Federal Center, Lakewood, CO
Solicitation number
GS-08P-10-JA-C-0TBD
Issued by

About this file

Amendment 0001 dated February 19 2010 Continuation Pages questions/answers and Pre-Proposal Conference/Site Visit Agenda

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Standard Form 30 - Continuation Sheet Amendment 0001

Request for Proposal GS-08P-10-JA-C-0016

RECOVERY Grid Tied Ground Mounted and Carport PV Systems

IMPORTANT NOTICE TO CONTRACTORS: This amendment and any future amendments must be acknowledged to be responsive to the solicitation.

A. Refer to the Agenda at the end of this documents, entitled, Proposal Conference/Site Visit, dated February 10, 2010. More specifically, refer to the Environmental Issues portion, second bullet, which has been changed to:

"As part of the remediation, the current mounds in Fields 1 & 2 will be removed prior to Contractor's availability to the site."

B. Due to the remediation activities that will be performed in PV Fields 1 and 2, Offerors are hereby advised that a Notice to Proceed for the PV Fields will not be feasible until on or about July 1, 2010. If requested, an earlier Notice to Proceed can be issued for the carport portion of the construction work.

C. Offerors are advised that the selected NAICS Code annotated in the Request for Proposal and in the Pre-Proposal Conference/Site Visit Agenda must be included in the associated CCR to be eligible for an award.

D. PV Watts is required for all pricing; however, other systems may be submitted in addition to PV Watts.

E. It was confirmed at the conference that the technical six page limitation does not include the reference pages.

Written Questions:

F. Can the GSA provide the existing utility drawings for each carport location showing all utilities including water lines, irrigation lines, gas, electrical, storm and sanitary sewer?

The Contractor is responsible for all locates.

G . In section 2 Statement of Work section 9.1.5 states that a temporary bridge and Gravel Service Road is to be removed, can the GSA provide more information of what the temporary bridge and service road will be constructed out of.

Assume the bridge will be at a minimum of one or two 36 corrugated metal pipe (CMP) large enough to allow flow through the ditch with dirt rock base cover capable of allowing up to 20 trucks a day weighing approximately 80,000 lbs. This may require concrete abutments to ensure the single lane bridge does not erode during flow.

H. In section 2 of the Statement of work section 2.2.2 it states that the gutters from the carports shall drain into subsurface water infiltration basin or a vegetated 'rain garden' (swale). Is the GSA expecting this swale to be installed in the parking lot or can we install the swale somewhere else as to not jeopardize the existing parking lot layout?

The Contractor must install the required Best Management Practices (BMPs) and Low Impact Development Designs (LIDs) beyond the limits of existing paved parking lots, downstream of the carport mounted PV Arrays. The Contractor must limit the area of disturbance within the parking lot to a minimum. The proposed BMPS and LIDs will help achieve the EISA requirements for the overall project for volume reductions and greatly enhance the runoff water quality I. Do the roofs on the carports need to be water tight and not allow water to impede between solar panels?

The panels must be adjacent to each other so there are no gaps or minimal leaks. This may require some sort of gasket.

J. Will RTD’s Light Rail construction plans be made available to the successful bidder during the design phase to confirm no conflicts will occur (supports, shading, run-off, etc.)?

The RTD Light Rail Bridge is currently erected for viewing. The Contractor will be required to determine impacts during the design process. The cars will eventually be crossing the bridge that will be approximately 10 feet tall.

K. Is there a local stormwater pond that we can plan to incorporate into our environmental plans?

Basin #3 located north of North Avenue and west of Agricultural Ditch could be utilized for managing storm water from PV Field #2. However, there are no storm water ponds near PV Field #1. The Contractor may propose a storm water basin to meet the EISA requirements.

L. What is the finish specification for the new carports? Can they be galvanized, do they need to be painted or coated?

The carports must be corrosion resistant. Galvanized is acceptable; however, it is not the only acceptable material.

M. Is there a specification for the LED lighting to be provided for the carports?

The lighting must be comparable to the rest of the parking area with a one (1) foot candle minimum under and around the carports as if the existing lighting had not been removed.

N. Can the medium voltage work be performed by us, or does it have to be performed by Sturgeon Electric?

It is permissible for the Contractor to self perform the work; however, Sturgeon Electric, Inc. is the current Operation and Maintenance Contractor on site for assistance/support as a paid subcontractor.

O. Will GSA be providing locations pertaining to the meter communications tie in to the GSA LAN for each array, for pricing purposes?

The Contractor will be able to tie into the Cat 6 Lan at the closes location within the building available. It is the Contractor's responsibility to price this item as it deems appropriate.

P. Will we have full access to each building for the purpose of conduit routing and tie in to existing switchgear?

The Contractor will have the necessary access.

Q. Where will we be able to access water for temporary irrigation?

There is an existing domestic fire hydrant (located just north of the wellness center) that the contractor can use to fill a water truck.

R. Who is responsible for maintaining the public website over the 10 year duration?

The Contractor is responsible for the website.

S. Do any wetlands exist in the locations planned for the ground arrays?

No formal determination for any of the areas in which construction is being performed work has been established. However, for bidding purposes assume that no wetlands are present in any of the project areas. The Agricultural Ditch has wetlands. The retention pond near PV Field 2 is preamble water and not a wetland.

T. Are the prairie dogs an issue during construction? Is any action required by us?

Prairie Dogs will be removed from the area prior to the construction portion of the work. No action will be required by contractor.

U. Will coyotes impact the project?

There is a coyote den located near the Agricultural Ditch. The coyotes will adapt and move to another area until the construction activity is completed.

V. What is the compaction after grading?

No information is available.

W. Can you use the excess soils as backfill in each area?

Excess soils which meet engineering criteria and are deemed clean can be used as backfill.

X. How do we comply with XCELS Solar Reward Large Program and have a 5% tilt on the carports?

The Solar Rewards Program is not incorporated into this project.

Y. All the references below are with regard to Section 2, entitled, Statement of Work.

i. In Section 2 entitled Objective, Paragraph 2.1 entitled Objective; delete the second sentence;

"PV Field areas 1 & 2 (Approximately 2 Megawatts) and Buildings 20, 25, 53 and 810 Carport PV system ranging from 46kw to 99kw DC. (Up to 10 building carport systems)."

Substitute with the following sentence;

" PV Field areas 1 & 2 (Approximately 2 Megawatts) and Buildings 20, 25, 53 and 810 Carport PV system ranging from 38kw to 144kw DC. (Up to 10 building carport systems)". Changes are bolded.

ii. In Section 2 entitled, Objective under Paragraph 2 entitled Background delete the following;

Section 2.2.1.12 All roof access points shall be securely locked at the end of each day. Language to be deleted is bolded.

iii. In Section 2 entitled Objective under Paragraph 2 entitled Background in 2.2.2 delete the sentence that states;

"This lighting shall be LED and allow for adjustable times for illumination with photocell controls to turn on the lights at dusk for variable times and turn the lights on in the morning prior to daylight".

Substitute with the following sentence;

"This lighting shall be LED and allow for adjustable times for illumination with photocell controls to turn on the lights at dusk for variable times and turn the lights off in the morning prior to daylight". The change is bolded.

iv. In Section 8 entitled Solar Electric Module Array 8.1.10 delete the sentence that states;

"Warranty: Provide a panel manufacturer’s warranty that will provide as a minimum: No module will generate less than 90% of its specified minimum power when purchased. PV modules shall have a 25-year limited warranty guarantying a minimum performance of at least 80% of the original power for at least twenty (20) years".

Substitute with the following sentence;

"Warranty: Provide a panel manufacturer’s warranty that will provide as a minimum: No module will generate less than 90% of its specified minimum power when purchased. PV modules shall have a 25-year limited warranty guarantying a minimum performance of at least 80% of the original power for at least twenty five (25) years". The change is bolded.

Agenda

Pre-Proposal Conference/Site Visit Request for Proposal GS-08P-10-JA-C-0016 RECOVERY Grid Tied Ground Mounted and Carport PV Systems Denver Federal Center, Lakewood, Colorado February 10, 2010 - 1:00 P.M., MST

Welcome/Introductions

1. Request for Proposal (RFP) - Posted on FedBizOpps - January 29, 2010

a. RFP - Proposal due date March 5, 2010, 10:00 A.M., MST

b. Attachment 1 - Section 00800 - Proposal Submission and Evaluation Factors for Award

c. Attachment 2 - Offerors Proposal Sheets

d. Attachment 3 - Scope of Work, Standard Operating Procedures and Dig Permit

e. Attachment 4 - Sensitive But Unclassified - Obtain CD Drawings

2. Standard Form 1442 - Solicitation, Offer and Award - IMPORTANT NOTICES

TO CONTRACTORS

a. Based on initial proposals, the Government reserves the right to award without discussions. Please be advised, caveats and exclusions may negatively impact the proposal. GSA anticipates award by the middle March 2010.

b. This procurement is a Total Small Business Set-Aside.

c. Funds Available: $18,407,735

3. North American Industry Classification Code

a. 334413 - Semiconductor and Related Device Manufacturing - SBA participated in the selection of the NAICS Code

b. Size Standard - 500 employees

c. FAR Part 19.102, Size Standards

4. Section 00700, Paragraph 126. FAR 52.236-1 - Performance of Work by the Contractor

" . . . Work equivalent to at least 30% of the total amount of work to be performed . . ."

5. Section 00800, Attachment 1, Proposals Shall Include the Following, Page 71 of 94

a. Submit Items A. - L. to be responsive to the solicitation

b. Written questions are due COB, Tuesday, February 16, 2010 - Submit written questions to Diane Byers, Contracting Officer, by electronic means at diane.byers@gsa.gov

c. Proposal shall be submitted in two separate parts:

Part One - Technical Proposal

Part Two - Price Proposal

Note: Do NOT include any price information in the technical proposal envelope and do NOT include any technical information in the price envelope.

6. Refer to Section 00800 Local Clauses - Page 45 of 94

a. Post Construction Retainage - Upon substantial completion of the work, there will be a 1% retainage to insure the post-construction activities are completed, in accordance with the Dig Permit. The retainage will be released upon the termination of the Dig Permit and the closure of the Notice of Intent with Environmental Protection Agency.

b. Basis of Award - Review this paragraph in its entirety to fully understand the award of the base work and potential alternates. Review the best value information within the local clause.

7. Amendment 0001 will be issued to include:

a. Technical Clarifications

b. Pre-Proposal Conference/Site Visit Agenda, Sign-in Sheets, Questions and Answers

c. Annotate the delayed notice to proceed - Remediation of the PV Array Fields will be completed on or about July 1, 2010.

Project Specifications:

· This is a design-build total turnkey project.

· The base work includes ground mounted PV systems in Fields 1 & 2, and carport PV systems at Buildings 20, 25, 53, & 810 with up to three additional “alternate” PV carports at Buildings 20 and 25.

· The project Includes interconnection with either existing building electrical or 13.8kV distribution system.

· 420 calendar day performance period

· MAY require use of GSA provided Electronic Project Management (ePM) system. GSA will provide training and web-based access to system.

· Approximately 3 megawatts for the Base Fields and Carport PV Systems.

· A technical clarification regarding Base PV production and the Alternates PV production will be issued in Amendment 0001.

· Concept information, drawings and proposed production information required with proposal. Refer to Project Specifications, Section 2, Paragraph 3, entitled, Concept Drawings and Specifications.

· Contractor is responsible for obtaining the interconnection agreement from the Xcel.

· Refer to Project Specifications, Section 2, Paragraph 8.4, entitled, PV Monitoring, for connection to GSA’s R-8 Advanced Metering System is required.

· Refer to Project Specifications, Section 2, Paragraph 9.1.5, with regard to a temporary bridge and gravel service road for access to field one staging area. The Contractor will be required to remove the bridge and gravel road at the end of the project.

· Environmental Issues:

· GSA will remediate Field 1 and 2 prior to start of PV work, however, the Statement of Work includes a number of Standard Operating Procedures, which describes permitting and other environment requirements should the Contractor encounter any unforeseen site conditions.

· As part of the remediation, the current mound in Field 1 will be removed prior to Contractor's availability to the site.

· Dig Permit:

· The Dig Permit shall be followed, specifically Page 9 which discusses the use of a Certified Asbestos Building Inspector. Read entire permit, and refer to the waste management requirements.

· Refer to Project Specifications, Section 2, Paragraph 11.12, entitled, Wells. Please be cognizant of the monitoring wells on the facility.

· EISA/Dig Permit

1. Notice of Intent (NOI): Contractor is required to file for NOI with EPA for project.

1. Copy of NOI to be provided to the Contracting Officer prior to start of work at site.

2. Notice of Termination (NOT)/Post Construction Inspection

1. EPA under GSA's Municipal Separate Storm Sewer Systems (MS4) permit requires a NOT to be issued to close all new NOI, this is done as part of the post closure inspection which documents the establishment of the Best Management Practices (BMP)s listed in the Storm Water Management Plan (SMP) and/or NOI.

2. Energy Independence and Security Act (EISA) Section 43:

1. Under EISA, GSA as a federal entity and holder of MS4 permit is required to meet EISA requirements. The main requirement is that any construction project that disturbs an area greater than 5000 sq ft, design the project to improve the storm water runoff to historical values. Historical values are defined as conditions prior to development (e.g., 1870 plains).

2. Storm Water Modeling (SWM). To obtain the CD for the modeling, a sensitive but unclassified document must be signed and accepted. This CD is a storm water model of the site based on the requirements of EISA. This model provides a means to determine if the proposed design and landscape design improve the quality and quantity of storm water run off. The GSA requires that EPA Storm Water Management Model (SWMM) 5.0 model is used.

3. Most if not all environmental consultants should have an individual that is familiar with this new Executive Order and the model provided by GSA. To aid the process, GSA has had its consultant provide some technical alternatives to show how the site may be designed.

Note:

GSA’s consultant, GeoSyntec, the generator of the model’s, shall not be eligible to participate in the procurement process and cannot answer questions.

Site Visit:

· Adjourn to tour Fields # 1 and 2 and the parking lots of Bldgs 20, 25, 53, and 810 for the site visit.

· Walk to Bldg-53 Parking Lot

· Drive to Field # 2

· Drive to B-20

· Walk to B-25 Parking Lot and Field # 2 Closing Remarks: Please do not ask questions on the tour. Submit written questions to the Contracting Officer by COB February 16, 2010.

Note:

Nothing stated at the site visit is to be substituted for written information in the Project Specifications and Amendment 0001.

THANK YOU FOR YOUR INTEREST IN THE GOVERNMENT'S REQUIREMENT