LAREDO_-_Revised_Bldg.Info_for_J L(3).xls
XLS spreadsheet 36 KB Posted
- Attached to
- Full Maintenance Services, 8(a) competitive Set-Aside, Laredo, TX, covering numerous locations in this area
- Solicitation number
- GS-07P-16-JU-D-7003
About this file
Revised Building spec sheet for Facility Lincoln-Juarez Port of Entry - Building 07020841 - (J.3)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| LAREDO_Sec._L(Revised).docx | DOCX document | |
| LAREDO-QUES._(3).doc | DOC document | |
| LAREDO_-_PP_sign-in_sheet.pdf | ||
| LAREDO_-_FIGURE_L-1_(revised)_Mod_5.xlsx | XLSX spreadsheet | |
| LAREDO_-_7003_-_L.docx | DOCX document | |
| LAREDO_-7003_-_Note_to_FBO.docx | DOCX document | |
| Laredo_7003_Questions_(3)cp.docx | DOCX document | |
| LAREDO_-Fig.B-3_revised_(2).xlsx | XLSX spreadsheet | |
| LAREDO_-_7003_-_Past_Perf._Questionnaire_-_Figure_L-3.docx | DOCX document | |
| LAREDO_-_PM_Changes_in_CMMS-7003_(2).xlsx | XLSX spreadsheet | |
| LAREDO_Equip_Inventory_(1)-_7003.xlsx | XLSX spreadsheet | |
| LAREDO_-_2_YR_WO_(3)_-_7003.xlsx | XLSX spreadsheet | |
| LAREDO_-_Amend__1-_Inventory.docx | DOCX document | |
| LAREDO_-_FIG._L-1.xlsx | XLSX spreadsheet | |
| LAREDO_-_FIG._B3_-_7003.xlsx | XLSX spreadsheet | |
| LAREDO_-FIG_-_B1_-_7003.xls | XLS spreadsheet | |
| LAREDO_-_Wages_-_7003.pdf | ||
| Laredo_LITE_FM_(7003).docx | DOCX document | |
| LAREDO_-_FIG._B2_-_7003_(1).xlsx | XLSX spreadsheet | |
| LAREDO_-_7003_-_SF_33.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lincoln-Juarez rev
| 3 | Facility: Lincoln-Juarez Port of Entry 07020841 | |||||
| Location: Termination of I-35, Laredo, TX | ||||||
| Number of Stories: | ||||||
| Buildings 2, 3, 4, and 5: 1 story | ||||||
| Buiildings 1 and 6: 2 stories | ||||||
| Population: Approximately 180 | ||||||
| Official working hours of building occupants: | ||||||
| Buildings 1, 4, and under canopy/garita at Building 4, and temporary bus processing at | ||||||
| Building 6: 24 hours a day, 7 days a week,including Federal holidays | ||||||
| Buildings 2, 5, and 6 (except temporary bus processing): 8:00 am to 5:00 pm, Monday | ||||||
| through Friday, excluding Federal holidays | ||||||
| Interior Statistics: | ||||||
| Exit Booth TX0281JL | ||||||
| Rentable area | 31 | SF | ||||
| Inspection Booths | 31 | SF | ||||
| Building 2 Admin TX0282JL | ||||||
| Rentable area | 42,368 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 7,592 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | ||||||
| Floors | 1,716 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 20,037 | SF | ||||
| Storage space | 2,355 | SF | ||||
| Fitness areas | 316 | SF | ||||
| Outbound T3 TX0289JL | ||||||
| Rentable area | 5,280 | SF | ||||
| Inspection Booths | 40 | SF | ||||
| 5,280 | SF | |||||
| Building 1 Primary Inspection TX0321JL | ||||||
| Rentable area | 22,279 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 1,545 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 14 | SF | ||||
| Inspection Booths | 709 | SF | ||||
| REMOVE | Building 3 Secondary Inspection TX0322JL | |||||
| Rentable area | 48,506 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 2,333 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | ||||||
| Floors | 1,342 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 2,520 | SF | ||||
| Break area | 456 | SF | ||||
| Building 4 Secondary Inspection TX0323JL | ||||||
| Rentable area | 48,214 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 901 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | ||||||
| Floors | 545 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 3,401 | SF | ||||
| Storage space | 476 | SF | ||||
| Building 5 USDA TX0324JL | ||||||
| Rentable area | 6,647 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 934 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | ||||||
| Floors | 302 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 4,683 | SF | ||||
| Storage space | 246 | SF | ||||
| Fitness areas | 69 | SF | ||||
| Building 6 Import Dock TX0325JL | ||||||
| Rentable area | 40,765 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 1,603 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | 672 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 8,059 | SF | ||||
| Temporary bus processing | 8,288 | SF | ||||
| Storage space | 1,085 | SF | ||||
| Stairways | 2 | Flights | ||||
| Passenger elevators | 1 | Elevators | ||||
| Loading dock | 20,360 | SF | ||||
| Kennel 1 TX0326JL | ||||||
| Rentable area | 633 | SF | ||||
| Kennel 2 TX0327JL | ||||||
| Rentable area | 2,243 | SF | ||||
| Corridors, lobbies, entrances, enclosed pedestrian walkways | 438 | SF | ||||
| Toilet Rooms, holding cells, locker rooms, janitor closets | ||||||
| Floors | 38 | SF | ||||
| General office, file rooms, libraries, conference rooms, ADP rooms, etc. | 304 | SF | ||||
| Truck Primary Inspection TX0328JL | ||||||
| Rentable area | 3,249 | SF | ||||
| Inspection Booths | 338 | SF | ||||
| Guard Booth TX0329JL | ||||||
| Rentable area | 36 | SF | ||||
| Inspection Booths | 36 | SF | ||||
| Outside Grounds Area: | ||||||
| Lawn, shrub, and planted area | 89,238 | SF | ||||
| Paved area | 512,994 | SF |