Q&A_2.docx

DOCX document 17 KB Posted

Attached to
Third Party Monitoring - Asbestos Abatement AHU
Solicitation number
GS-05-P-17-SA-P-0002
Issued by

About this file

Responses the questions received.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Third Party Monitoring - Asbestos Abatement Solicitation:

GS-05-P-17-SA-P-0002

FBO.gov Posting: https://www.fbo.gov/index?mode=form&id=60a0c7a55fa1093f2b65bc927c411cc9&tab=ntype

Location:

Charles Chamberlain Federal Building 315 W. Allegan St.

Lansing, MI, 48933

Brief project description:

The abatement will consist of approximately 4,240 sq ft of Duct Insulation. The work will be completed Monday Friday 5:30pm 4:00am.

Please see attached abatement submittal for more specific information. Note the abatement submittal has not been accepted however major changes are not anticipated.

Questions and Answers:

1. The SF 1449 Section B calls for Lump Sum pricing. Based on the answers to the questions there is now a requirement for a breakdown of TEM and PCM sample costs. How is this to be reconciled on the SF 1449?

a. An amendment is being issued to add two line items that separate the scenarios into two lump sum prices.

a. Line item 0001 will be the sum of all costs excluding air sampling, (TEM or PCM).

a. Line item 0002 will be based on TEM sample costs.

a. Line item 0003 will be based on PCM sample costs.

a. Payment will be dependent on which analytical method is possible based on available funding and work site conditions.

0. Since no lead abatement appears to be involved in this project, does the lead professional certification still apply?

a. No. unless lead based paint is encountered later.

1. Is the selection of a certified/qualified laboratory included in responsibilities of the GEC, with costs included in the Lump Sum pricing?

a. Yes

2. Is a teaming arrangement acceptable to the GSA for this project?

a. Subcontracting is acceptable.

File details come from the government source that posted it. Updated .