Amendment_002.pdf

PDF 171 KB Posted

Attached to
FBI PVM Antenna Installation - Detroit, Michigan
Solicitation number
GS-05-P-17-FB-C-0004
Issued by

About this file

Amendment 002

View the file

Other files

File Type Posted
Amendment_003.pdf PDF
SF30-16a.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

5P1QCD

Jennifer Styzek

Amendment 002 is issued to revise Specification Section 011000 – 1.3. See attached.

R5 AMD Customer Projects Contracting Team 230 S. Dearborn St.

Room 3300 Chicago, IL 60604 United States

GS-05-P-17-FB-C-0004

1 2

06/06/2017

05/18/2017

Addendum No. 2

Project:

GSA Antenna Installation 477 Michigan Ave.

Detroit, MI 48226

PCN No:

Project No:

N1326631 15074.00

Date: June 6, 2017

Notice

This addendum is issued by the Architect to all known individuals, firms or corporations who have obtained or received bidding documents and contract documents for the above-listed project. This addendum is hereby made a portion of bidding documents or contract documents, as appropriate. It is issued for the purpose of amplifying, clarifying or correcting originally issued bid documents. Bidders are required to acknowledge receipt of this addendum in the appropriate space on bid form.

G E N E R A L

Item AD1-G1 – Schedule of Government Furnished Property Refer to Spec Section 011000 - 1.3:

Revise spec section 011000 – 1.3 as shown below.

1.3 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY

A. The project includes the following Government furnished property to be installed by the Contractor. The contractor shall advise GSA at least 30 days in advance of when the property should be delivered. The Government will be responsible for delivery of the equipment and materials to the work site (26th Floor, Roof, Etc.) building site (storage containers just outside the building). Exact location to be coordinated in the field. Contractors are responsible for moving the equipment to the construction site (26th Floor, Roof, Etc.). Temporary storage locations or staging areas closer to the construction site or at the construction site are to be coordinated in the field.

1. Contractor is to provide to the Government a bill of materials needed that are related to the installation of all the new antenna equipment. Government shall provide the equipment and materials for the antenna towers, the antennas, conduit, cabling, roof cable tray. Contractor will be responsible for and shall furnish and install all other related project scope for structural improvements, general carpentry, roof work and other equipment not otherwise noted.

END OF ADDENDUM No. 2

Addendum No. 1 END OF ADDENDUM No. 1

ADP8A4A.tmp
GENERAL
Item AD1-G1 – Schedule of Government Furnished Property
1.3 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY
A. The project includes the following Government furnished property to be installed by the Contractor. The contractor shall advise GSA at least 30 days in advance of when the property should be delivered. The Government will be responsible for deliv...
1. Contractor is to provide to the Government a bill of materials needed that are related to the installation of all the new antenna equipment. Government shall provide the equipment and materials for the antenna towers, the antennas, conduit, cablin...

File details come from the government source that posted it. Updated .