8715 Questions and Answers Round 3
Q1. Will parking be available for contractors at the GSA parking lots?
A1: Parking on site will be limited and subject to availability at the time of the project.
Parking is available on the streets surrounding the site.
Q2. Will contractors be permitted to use existing bathrooms in the building during construction or will job site toilets be required?
A2: Yes, contractors will be allowed to use the restrooms in the facility.
Q3. Are there any designated staging areas on the property that the contractor can use during construction for trailer locations, staging area, etc.? Is there a site plan available showing the designated location?
A3: There are designated staging areas located in Lot 6 located on the corner of Garfield and Brook Streets. See “Site Plan” document which is posted on FBO.
Q4. Building 5 – A floor plan is missing from the Architectural asbuilts provided, this would be for the Boiler Floor, including the office space, showers, control room, etc. Please provide this missing floor plan if available.
A4: See Building 5 drawing MI0509_G1 which has been posted on FBO.
Q5. From the architectural asbuilts provided, the following building floor plans are missing:
Building 8 (3 Stories), Building 30 (1 Story), UPS/Battery/Switchgear (2 Stories), and Building 20 (1 Story). Please provide the missing floor plans if available.
A5: See Building 8 MI0527BC, Building 20 MI0528BC and Building 30 MI0525BC which have been posted on FBO.
Q6. Building 1B was unable to be accessed during the walkthrough, this space appears to be recently renovated, are there as builts available for this building?
A6: See Building 1B MI0538BC which has been posted on FBO.
Q7. Building 1C was unable to be accessed during the walkthrough, this space appears to be recently renovated, are there as builts available for this building?
A7: Drawings for 1C are are included in drawings for Building 1B. See A6.