The file's text, extracted by GovTribe without its formatting.
Building Profile Sheet John C. Klucaynski Federal Building – Zone 1
| Name & Address: |
| John C. Kluczynski Federal Building, 230 S. Dearborn, Chicago, IL |
| Contact: |
| Joe Pumo, Property Manager |
(312) 353-5620
| General Description: |
| 43 story US Federal Building, housing various Federal Agencies |
| Size: |
| Gross area – approximately 1,373,000 sq ft |
Occupiable area – approximately 1,091,393 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. It is expected to be on the National Register of Historic Places in the future and it is the government’s policy to confer with State Preservation Office when repairs to the exterior or public areas of the building are under construction. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays |
| Parking: |
| Parking is not available at this site. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Clark Street. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of two (2) freight elevators servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of 24 passenger elevators and one (1) shuttle elevator. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has limited ACM and PCB’s in light ballasts. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is steel & glass with concrete decks |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block & gypsum drywall. Ceilings are lay in grid on newly remodeled floors & grid on older floors. |
| Ceilings Plenums: |
| Hallways are air returns. |
U.S. Post Office – Loop Station – Zone 1
| Name & Address: |
| US Post Office Loop Station, 211 S. Clark Street, Chicago, IL. |
| Contact: |
| Joe Pumo, Property Manager |
(312) 353-5620
| General Description: |
| 4 story, including one (1) basement & two (2) sub-basements |
| Size: |
| Gross area – approximately 225,826 sq ft |
Occupiable area – approximately 167,889 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. It is expected to be on the National Register of Historic Places in the future and it is the government’s policy to confer with State Preservation Office when repairs to the exterior or public areas of the building are under construction. |
Work Site Conditions
| Standard Building Operating Hours: |
| Twenty Four (24) hours a day, seven days a week |
| Parking: |
| Parking is not available at this site. |
| Loading Dock: |
| The John C. Kluczynski Federal Building loading dock is available for this location. Parking is limited to loading & unloading. Entrance off of Clark Street. Dock dimensions are 12ft, 2” in. in height. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of two (2) freight elevators servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is steel & cement. |
| Partition / Ceilings: |
| Partitions are gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air returns. |
| Interior Finishes: |
| Interior finishes are paint, paneling wall covering and granite flooring. |
Everett M. Dirksen Federal Courthouse – Zone 1
| Name & Address: |
| EMD Federal Courthouse, 219 S. Dearborn Street, Chicago, IL. |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 31 story US Federal Courthouse, housing various Federal Agencies. |
| Size: |
| Gross area – approximately 1,360,460 sq ft |
Occupiable area – approximately 921,973 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. It is expected to be on the National Register of Historic Places in the future and it is the government’s policy to confer with State Preservation Office when repairs to the exterior or public areas of the building are under construction. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s officer prior to utilizing dock. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Jackson Blvd. Dock dimensions are 12ft, 2” in. in height. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of three (3) freight elevators servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of thirty two (32) passenger elevators and one (1) shuttle elevator. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has limited ACM and PCB’s in light ballasts. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is steel & glass with concrete decks. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block and gypsum drywall. Ceilings are lay in grid on newly remodeled floors & plaster on older floors. |
| Ceilings Plenums: |
| Hallways are air returns. |
| Interior Finishes: |
| Interior finishes are carpet tile, paint, and wall covering. |
| Other: |
| Electrical raceways in floor walker duct system. |
Ralph H. Metcalfe Federal Building – Zone 1
| Name & Address: |
| Ralph H. Metcalfe Federal Building, 77 W. Jackson Blvd., Chicago, IL. |
| Contact: |
| Antoine Bell, Property Manager |
(312) 353-6225
| General Description: |
| 28 story US Federal Building, housing various Federal agencies. |
| Size: |
| Gross area – approximately 757,796 sq ft |
Occupiable area – approximately 528,923 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available one block east on Van Buren & one block southeast on Dearborn, must contract Property Manager’s officer prior to parking. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Jackson Blvd. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of one (1) freight elevator servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of seventeen (17) passenger elevators. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Hazardous materials are stored / used in this facility. Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is steel & granite. |
| Partition / Ceilings: |
| Partitions are drywall, ceilings are drop tile. |
| Ceilings Plenums: |
| 3” high between dropped ceiling & slab. |
| Interior Finishes: |
| Interior finishes are carpet tile and vinyl (polyolefin) wall covering, some granite flooring (i.e. lobby area). . |
| Other: |
| Electrical raceways. All electric building with green lights (T-8), with high efficient ballasts. |
450 S. Federal Parkway – Zone 1
| Name & Address: |
| Federal Parking Facility, 450 S. Federal Parkway, Chicago, IL |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 9 story US Federal Parking Garage. |
| Size: |
| Gross area – approximately 335,043 sq ft |
Occupiable area – approximately 12,379 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are concrete, pyro-block, and gypsum drywall. Ceilings are exposed concrete. |
| Ceilings Plenums: |
| Ceilings are exposed. Façade is exposed to exterior. |
536 S. Clark Street Federal Building – Zone 1
| Name & Address: |
| Federal Building, 536 S. Clark Street, Chicago, IL. |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 10 story US Federal Building, housing various Federal agencies. |
| Size: |
| Gross area – approximately 600,000 sq ft |
Occupiable area – approximately 490,351 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. It is expected to be on the National Register of Historic Places in the future and it is the government’s policy to confer with State Preservation Office when repairs to the exterior or public areas of the building are under construction. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 6:30am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is limited at this site. Arrangements must be made through the Property Manager’s officer. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Congress Parkway. Dock dimensions are 13ft, 2” in. in height. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of one (1) freight elevator and one (1) combination freight / passenger servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of seven (7) passenger elevators. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is concrete & steel with brick. |
| Partition / Ceilings: |
| Corridor has cinder & concrete block floor to ceiling. Metal, drywall, and steel stud partitions are in office areas. Ceilings are lay in grid. |
| Interior Finishes: |
| Interior finishes are paint and vinyl wall coverings. |
| Other: |
| Electrical raceways above ceiling. |
U.S. Custom House – Zone 1
| Name & Address: |
| US Customhouse Federal Building, 610 S. Canal Street, Chicago, IL |
| Contact: |
| Haydee Lopez, Property Manager |
(312) 353-8494
| General Description: |
| 11 story US Federal Building, housing various Federal agencies. |
| Size: |
| Gross area – approximately 268,000 sq ft |
Occupiable area – approximately 199,082 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. It is eligible for historic status as it is more than 50 years old, and it is the government’s policy to confer with State Preservation Office when repairs to the exterior or public areas of the building are under construction. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:30pm, excluding Federal holidays. |
| Parking: |
| Parking is limited at this site. Arrangements must be made through the Property Manager’s office. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Clinton street. Dock can handle standard semi-trailer trucks. |
| Elevators: |
| Transportation of tools and equipment is limited to use of one (1) freight elevator servicing the entire building. There are a total of four (4) passenger elevators, which are not to be used without the approval of the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is concrete and steel with brick. |
| Partition / Ceilings: |
| Corridor has cinder and block floor to ceiling. Metal, drywall and steel stud partitions are in office areas. Ceilings are lay in grid. |
| Interior Finishes: |
| Interior finishes are paint and vinyl wall coverings. |
| Other: |
| Some floors are raised. |
701 S. Clinton – Zone 1
| Name & Address: |
| Federal Building, 701 S. Clinton, , Chicago, IL |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 1 story US Federal Building, housing federal tenants. |
| Size: |
| Gross area – approximately 1,161 sq ft |
Occupiable area – approximately 1,099 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are concrete, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
Federal Archives & Records Center – Zone 1
| Name & Address: |
| FARC, 7358 S. Pulaski Road, Chicago, IL |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 1 story US Federal Building, housing National Archives & Records Administration |
| Size: |
| Gross area – approximately 189,521 sq ft |
Occupiable area – approximately 177,361 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s office. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has limited ACM & PCB’s in light ballasts. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
Federal Archives & Records Center – Zone 1
| Name & Address: |
| FARC, 7358 S. Pulaski Road, Chicago, IL |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 1 story US Federal Building, housing National Archives & Records Administration |
| Size: |
| Gross area – approximately 189,521 sq ft |
Occupiable area – approximately 177,361 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s office. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has limited ACM & PCB’s in light ballasts. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
Harold Washington Center – Zone 1
| Name & Address: |
| Harold Washington Center, 600 West Madison Street, Chicago, IL |
| Contact: |
| Annette Zsenyuk, Property Manager |
(312) 353-7020
| General Description: |
| 10 story US Federal Building, housing Social Security Administration |
| Size: |
| Gross area – approximately 758,050 sq ft |
Occupiable area – approximately 514,964 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is concrete and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
William O. Lipinski Federal Building – Zone 1
| Name & Address: |
| William O. Lipinski Federal Building, 844 N. Rush Street, Chicago, IL |
| Contact: |
| Annette Zsenyuk, Property Manager |
(312) 353-7020
| General Description: |
| 15 story US Federal Building, housing Railroad Retirement Board |
| Size: |
| Gross area – approximately 385,410 sq ft |
Occupiable area – approximately 272,192 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
11 West Quincy Court – Zone 1
| Name & Address: |
| Federal Building, 11 W. Quincy Court, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 6 story US Federal Building |
| Size: |
| Gross area – approximately 100,553 sq ft |
Occupiable area – approximately 87,437 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
18 West Jackson – Zone 1
| Name & Address: |
| Federal Building, 18 West Jackson Blvd., Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 2 story US Federal Building, housing retail & commercial tenants. |
| Size: |
| Gross area – approximately 7,335 sq ft |
Occupiable area – approximately 7,072 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
202 S. State Street – Zone 1
| Name & Address: |
| Federal Building, 202 S. State Street, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 18 story US Federal Building, currently vacant |
| Size: |
| Gross area – approximately 68,200 sq ft |
Occupiable area – approximately 50 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
208-212 S. State Street – Zone 1
| Name & Address: |
| Federal Building, 208-212 S. State Street, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 3 story US Federal Building, currently vacant |
| Size: |
| Gross area – approximately 11,499 sq ft |
Occupiable area – approximately 0 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
214 S. State Street – Zone 1
| Name & Address: |
| Federal Building, 214 S. State Street, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 3 story US Federal Building, housing retail |
| Size: |
| Gross area – approximately 7,200 sq ft |
Occupiable area – approximately 3,612 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
220 S. State Street – Zone 1
| Name & Address: |
| Federal Building, 220 S. State Street, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 22 story US Federal Building, housing retail |
| Size: |
| Gross area – approximately 6,312 sq ft |
Occupiable area – approximately 6,312 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
230 S. State Street – Zone 1
| Name & Address: |
| Federal Building, 230 S. State Street, Chicago, IL |
| Contact: |
| Julie Nowak, Property Manager |
(312) 353-6996
| General Description: |
| 7 story US Federal Building, housing retail |
| Size: |
| Gross area – approximately 25,250 sq ft |
Occupiable area – approximately 25,250 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking is not available at this site. . |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is masonry and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are plaster, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |
Hammond Federal Courthouse – Zone 2
| Name & Address: |
| Hammond Federal Courthouse, 5400 Federal Plaza, Hammond, IN |
| Contact: |
| Richard Falzone, Property Manager |
(219) 852-2742
| General Description: |
| 5 story US Federal Courthouse, housing various Federal agencies |
| Size: |
| Gross area – approximately 269,000 sq ft |
Occupiable area – approximately 200,000 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s officer prior to utilizing dock. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Lyman Street. Two dock plates. Dock dimensions are 13ft in height. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of one (1) freight elevator servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of four (4) passenger elevators, two (2) Judge’s elevators, one (1) freight elevator, and one (1) dumbwaiter for ammunition. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has # 2 diesel fuel oil for diesel generator & boiler back up. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is Indiana Limestone & glass Curtain wall with concrete decks. |
| Partition / Ceilings: |
| Partitions are drywall with steel stud framing, pyro-block and gypsum drywall. Ceilings are lay in grid (2” x 2”) on most floors with some drywall. |
| Interior Finishes: |
| Interior finishes are paint and vinyl wall coverings. |
| Other: |
| Some floors are raised. |
Robert Grant Federal Building & US Courthouse – Zone 2
| Name & Address: |
| Robert A. Grant Federal Building & US Courthouse, 204 S. Main Street, South Bend, IN |
| Contact: |
| Fred Peller, Property Manager |
(219) 852-2743
| General Description: |
| 5 story US Federal Courthouse |
| Size: |
| Gross area – approximately 135,972 sq ft |
Occupiable area – approximately 91,698 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s officer prior to utilizing dock. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Entrance off of Lyman Street. Two dock plates. Dock dimensions are 13ft in height. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment is limited to use of one (1) freight elevator servicing the entire building. All arrangements must be coordinated through the Property Manager’s office. There are a total of four (4) passenger elevators, two (2) Judge’s elevators, one (1) freight elevator, and one (1) dumbwaiter for ammunition. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). Building has # 2 diesel fuel oil for diesel generator & boiler back up. |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is Indiana Limestone & glass Curtain wall with concrete decks. |
| Partition / Ceilings: |
| Partitions are drywall with steel stud framing, pyro-block and gypsum drywall. |
| Ceilings Plenums: |
| Hallways are air returns |
| Interior Finishes: |
| Interior finishes are roll carpet, paint, and wall covering. |
| Other: |
| Electrical raceways in floor duct system in 8 courtrooms only. All other outlets are hard piped. In soil lawn and planter irrigation systems. |
Stanley J. Roszkowski U.S. Courthouse – Zone 3
| Name & Address: |
| Stanley J. Roszkowski US Courthouse, 327 S. Church Street, Rockford, IL |
| Contact: |
| Gina Carter, Property Manager |
(312) 353-3734
| General Description: |
| 6 story US Federal Building, housing US courts |
| Size: |
| Gross area – approximately 220,000 sq ft |
Occupiable area – approximately 167,000 sq ft
| Historic Register: |
| Currently not listed on the National Register of Historic Places. |
Work Site Conditions
| Standard Building Operating Hours: |
| Monday – Friday, 7:00am to 6:00pm, excluding Federal holidays. |
| Parking: |
| Parking may be available at this site. Must have approval from the Property Manager’s office. |
| Loading Dock: |
| Parking available, limited to loading & unloading. Must have approval from the Property Manager’s office prior to utilizing dock. |
| Elevators: |
| Transportation of tools and equipment must be coordinated through the Property Manager’s office. |
| Storage / Staging Area: |
| Storage & staging areas are available but very limited. All arrangements must be made through the Property Manager’s office. |
| Hazardous Materials: |
| Fire & other permits must be requested and approved by GSA (Property Management Office). |
| Construction Description |
| General Overview of Major Building Systems |
| Structure: |
| Building structure is concrete and steel with concrete deck. |
| Partition / Ceilings: |
| Partitions are glass, pyro-block, and gypsum drywall. Ceilings are lay in grid. |
| Ceilings Plenums: |
| Hallways are air return. |