HVAC Alternative #M-2 Narrative

General Description of Alternative: New water chillers/cooling towers/pumps, new condensing hot water boilers, pumping and piping, new variable volume air handling units in new mechanical rooms on the floors served, new dedicated energy recovery air handling systems.

System Components:

1. Air Side Systems

a. Variable Air Volume Air Handling Systems – General Requirements

• All new air handling systems serving the occupied areas shall be factory constructed custom central station air handling units located in existing mechanical fan room areas throughout the facility. Units shall be broken down into sections to allow for entry into the building areas and then reconstructed in-place with factory witness of re-assembly.

• All new air handling units will be factory custom built type units, with the following general components:

1) Economizer damper section to operate dampers for enthalpy economizer control.

2) Provide separate duct connections for minimum outdoor air from dedicated heat recovery makeup air unit (described in separate section below).

3) Return/relief fan section.

4) 30% MERV 8 prefilter/85% MERV 13 final filter section.

5) Chilled water coil section.

6) Supply Fan Section with centrifugal fans.

7) Discharge air section.

8) Ultraviolet lights in all air handlers.

• All air handling units to deliver 55 F. supply air (summer) with reset of discharge temperatures in winter (up to 60 F.) based on space zone temperatures.

• All air handlers shall be ducted with pre-conditioned outdoor air at a capacity required for minimum outdoor air requirements for people plus an additional amount necessary for pressurization of the building. This pre-conditioned outdoor air shall be supplied by the dedicated energy recovery units identified in the section below. This air shall be ducted from the ERU’s in the mechanical rooms to each air handler.

• All air handlers shall be ducted for full outdoor and relief air to existing or new louvers on the mechanical floors for full enthalpy controlled economizer. The outdoor air dampers shall be fully closed when economizer operation is not possible. The relief damper shall modulate to maintain space pressures based on average of the floor served.

• Provide the following air handling systems:

1) Basement Air Handling Systems Room requirements: Create one new mechanical room as follows:

� Room #1: Approximately 2000 sq. ft. of space required. Locate the room adjoining the east side of existing stairway and shaft B63 (northeasterly stairwell) in the area currently occupied by rooms B55, B57 and B57A. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the 2nd floor mechanical room.

New Air Handling Systems � New Air Handlers B-1 and B-2: 25,000 CFM each – Locate these units in the new floor mechanical room #1.

2) Ground Floor Air Handling Systems Room requirements: Create two new mechanical rooms as follows:

� Room #1: Approximately 3,000 sq. ft. of space required. Locate the room adjoining the west side of the existing stairway and shaft GNE (northeasterly stairway) in the areas currently occupied by rooms G41A and G41B. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the 2nd floor mechanical room.

� Room #2: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing shaft G981 1VPA (southwesterly stairway) in the areas currently occupied by portions of rooms G100, G102 and G982. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the 2nd floor mechanical room.

New Air Handling Systems � New Air Handlers G-1 and G-2 (25,000 CFM each), G-5 (18,000 CFM) and G-6 (10,000 CFM): Locate these units in the new mechanical room #1.

� New Air Handlers G-3 and G-4 (25,000 CFM each) and G-7 (5,000 CFM):

Locate these units in the new mechanical room #2.

3) First Floor Air Handling Systems Room requirements: Create two new mechanical rooms as follows:

� Room #1: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing stairway and shaft 1WA (northwesterly stairway) in the areas currently occupied by room/area 156. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the 2nd floor mechanical room.

� Room #2: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing stairway and shaft 1VPA (southeasterly stairway) in the areas currently occupied by rooms 010103 and 110. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the 2nd floor mechanical room.

New Air Handling Systems � New Air Handlers 1-1, 1-2 and 1-3: 25,000 CFM each – Locate these units in the new mechanical room #1.

� New Air Handlers 1-4 , 1-5 (25,000 CFM each) and 1-6 (7,500 CFM each – Locate these units in the new mechanical room #2.

4) Second Floor Air Handling Systems � 2-1: 15,000 CFM – Locate in 2nd floor mechanical room. Serving second floor.

� 2-2: 15,000 CFM – Locate in 2nd floor mechanical room. Serving second floor.

5) Third Floor Air Handling Systems Room requirements: Create one new mechanical room as follows:

� Room #1: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the east side of the existing shaft 3VPD (easterly location) in the areas currently occupied by room 3101B. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the Penthouse floor mechanical room.

New Air Handling Systems � New Air Handlers 3-1, 3-2 and 3-3: 22,500 CFM each – Locate these units in the new mechanical room #1.

6) Fourth Floor Air Handling Systems Room requirements: Create one new mechanical room as follows:

� Room #1: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing shaft 4VPB (westerly location) in the areas currently occupied by rooms 401, 473, 4C0RC. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the Penthouse floor mechanical room.

New Air Handling Systems � New Air Handlers 4-1, 4-2 and 4-3: 22,500 CFM each – Locate these units in the new mechanical room #1.

7) Fifth Floor Air Handling Systems Room requirements: Create one new mechanical room as follows:

� Room #1: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing shaft 5VPB (easterly location) in the areas currently occupied by rooms 520, 521 and 523. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the Penthouse floor mechanical room.

New Air Handling Systems � New Air Handlers 5-1, 5-2 and 5-3: 22,500 CFM each – Locate these units in the new mechanical room #1.

8) Sixth Floor Air Handling Systems Room requirements: Create one new mechanical room as follows:

� Room #1: Approximately 2,500 sq. ft. of space required. Locate the room adjoining the west side of the existing shaft 6VPD (westerly location) in the areas currently occupied by rooms 673 and 060022. The existing vertical shaft shall be used for vertical transportation of outdoor air, exhaust and relief air from the Penthouse floor mechanical room.

New Air Handling Systems � New Air Handlers 6-1, 6-2 and 6-3: 22,500 CFM each – Locate these units in the new mechanical room #1

b. Special Area Air Handling Systems All special area air handling units will be factory built type units, with the following general components:

1) Economizer damper section to operate dampers for enthalpy economizer control.

2) A separate duct connection for minimum outdoor air from a dedicated heat recovery makeup air unit (described in section c. below).

3) Return/relief fan section (where required).

4) 30% MERV 8 prefilter/85% MERV 13 final filter section.

5) Chilled water coil section.

6) Hot water coil section (where required).

7) Supply Fan Section with centrifugal fans.

8) Discharge air section (where required).

• Kitchen/Cafeteria: The Kitchen/Cafeteria shall be provided with a separate variable air volume air handling unit G-5, with capability of providing of up to 100% outdoor air when kitchen hoods are in use. The unit shall be sized to achieve approximately 18,000 CFM. The unit shall be a variable volume air handling unit. The unit shall control the position of outdoor air and return/relief air dampers, supply and return fans based on space pressure relative to adjoining spaces to provide the required makeup air and to maintain a slight negative condition. The unit shall be a packaged air handling unit with supply and return fans, chilled water cooling and hot water heating coils, located in the 2nd floor mechanical room.

• Mail Room: An air handling unit B-3 shall be provided for the mail room. This unit shall be the sole source of air to and from this space and will have hot water heating and chilled water cooling coils. The unit shall be sized to achieve approximately 3,000 CFM.

The unit shall be a variable volume air handling unit. The unit may be located in the 2nd floor mechanical room (or at the mail room) with duct distribution to and from the room. The mail room shall be provided with an emergency exhaust system to purge the space upon command from the occupants. Outdoor air will be provided for this system from direct intake locations separate from the rest of the building air handling systems.

• Loading Dock: Provide a separate air handling unit G-7 for the temperature control of the loading dock area and to provide 100% makeup air for the exhaust systems. The unit may be located in the loading dock area and shall be provided with supply fan, hot water heating and chilled water cooling coils. The unit shall be sized to achieve 5,000 CFM.

The unit shall be a variable air volume air handling unit. The exhaust of the loading dock shall be provided by exhaust duct inlets located to one side of the space near the floor to remove carbon monoxide/dioxide concentrations. The exhaust system shall be ducted to a fan on 2nd floor in the mechanical room. Exhaust shall be energized through an automatic sensor system located in the loading dock area.

• Main Lobby/Entrance: An air handling unit 1-6 shall be provided for the main lobby/entrance vestibule. This unit shall be located in the 2nd floor mechanical room.

The unit shall be sized to achieve 7,500 CFM. The unit shall be a variable air volume air handling unit. This unit shall have supply and return fans, hot water heating and chilled water cooling coils and shall have the capability of operating up to 100% outdoor air to maintain a positive pressure in the lobby/entrance relative to the rest of the building.

• Auditorium: An air handling unit G-6 shall be provided to serve the Auditorium areas.

This unit may be located in the 2nd floor mechanical room. The unit shall be sized to achieve approximately 10,000 CFM. The unit shall be a variable volume air handling unit.

The unit shall be provided with outdoor air from the energy recovery systems and will adjust the amount of outdoor air based on carbon dioxide sensors located in the space to adjust the amount of outdoor air based on actual occupancy loads.

• Elevator Equipment Room: Provide a fan coil unit 7-1 for this room. The unit shall be located in the penthouse mechanical room. The unit shall be sized to achieve approximately 3,000 CFM. The unit shall be constant volume fan coil unit. The unit shall be provided with chilled water cooling coil and full economizer capability. The room shall be provided with electric unit heater for winter heating needs.

• Fire Command Centers, Building Control System (BAS) Control Rooms, Security Monitoring Rooms, Voice/Data Rooms, Computer Rooms: Dedicated 24/7 packaged four pipe fan coil systems with cooling systems using the building dedicated “house” condenser water system as a source for heat of rejection. Redundant units will be provided where required by PS100 standards.

c. Dedicated Outdoor Air/Energy Recovery Systems – General Requirements

• Exhaust from toilet rooms, janitors closets, loading dock and general exhaust for the kitchens/break rooms and other areas will be collected and routed through total energy recovery air handling systems (recovery of energy from grease producing exhaust systems cannot be achieved due to the grease contamination and fire potential). The energy recovery units will be located in the mechanical rooms located on 2nd and the 7th floor penthouse mechanical rooms.

• Estimated amount of continuous exhaust is = approximately 40,000 CFM.

• Estimated minimum outdoor air requirements are based on the amount required for makeup air to supply the occupants and makeup for the volume of air exhausted (40,000) + the amount required for building pressurization (approximately 40,000). Total required makeup air for the facility = 80,000 CFM.

• The heat recovery units shall be mounted inside the existing mechanical rooms and consist of the following:

1) Supply and exhaust fans.

2) Intake and Exhaust louvers and dampers.

3) Total energy heat wheel.

4) Chilled water coil.

5) Hot water Reheat coil.

6) 30% MERV 8 prefilter/85% MERV 13 final filter section.

7) Unit capable of recovering 80% of the energy from the air being exhausted and transferring this heat energy to the incoming makeup air.

• All energy recovery units to deliver 55 F. supply air (summer) with reset of discharge temperatures in winter (up to 60 F.) based on space zone temperatures.

• All energy recovery units shall be ducted for to existing or new louvers on the mechanical floors with motorized dampers.

• Provide the following energy recovery systems:

1) ERU-1: 17,500 CFM – Located in 2nd floor mechanical room.

2) ERU-2: 17,500 CFM – Located in 2nd floor mechanical room.

3) ERU-3: 17,500 CFM – Located in 2nd floor mechanical room.

4) ERU-4: 17,500 CFM – Located in 2nd floor mechanical room.

5) ERU-5: 15,000 CFM – Located in 7th floor mechanical room.

6) ERU-6: 15,000 CFM – Located in 7th floor mechanical room.

7) ERU-7: 15,000 CFM – Located in 7th floor mechanical room.

• Intake and exhaust ductwork from the seven ERU’s will be connected to the existing louvers on each of the two floors. Provide motorized dampers at these connections.

• Exhaust from the basement through 1st floor sources will be ducted directly to the inlets of the four ERU’s evenly split between each unit.

• Exhaust from the 2nd floor through 6th floor sources will be ducted directly the inlets of the three ERU’s in the 7th floor, evenly split between each unit.

• Makeup air from each of the four (4) ERU’s in the 2nd floor mechanical room will be ducted directly to the inlets of the fourteen (14) air handling units in the new mechanical rooms serving basement through 1st floors for minimum outdoor air requirements.

Makeup from the three (3) ERU’s in the 7th floor mechanical room will be ducted directly to the inlets of the twelve (12) air handling units in the new mechanical rooms serving 2nd floor through 6th floors for minimum outdoor air requirements.

d. General HVAC Systems

• All bathrooms, locker room and janitor rooms will be exhausted at a rate of 10 air changes per hour.

• All break/small kitchen areas on floor x floor locations will be exhausted at a rate to maintain a slight negative condition to adjoining areas.

• Ductwork from shafts serving multiple floors shall be provided with combination smoke/fire dampers at penetrations on to a floor served.

• Areas served by the air handling systems shall be provided with variable air volume boxes for zone control. Perimeter zones shall be fan powered type vav boxes with reheat coils.

Interior areas will be variable air volume boxes.

• Interior conference rooms, training rooms, classrooms, seminar rooms or other rooms with larger occupancy will be provided with VAV boxes with reheat coils and a space carbon dioxide level sensor to enable the VAV box to supply up to 100% air flow for increased outdoor air capabilities when the room(s) are fully occupied.

• Air distribution shall be through overhead vaned type diffusers. Perimeter zones will be provided with linear slot type air diffusers along the exterior window walls.

• Return air from spaces shall be through ceiling return air plenum.

• Perimeter Heating: All perimeter walls with windows and walls exposed to outdoors with a heating load of greater than 400 btuh/lineal foot of exposed wall shall be provided with perimeter hot water finned tube radiation. Hot water will be supplied at a maximum water temperature of 140 F. at -19 F. peak winter condition. Where heating load is under 400 btuh/linear foot for these same locations, overhead slot type diffusers shall be provided in lieu of finned tube radiation under the windows.

• Thermostatic Zones

1) Interior – open office areas: One zone for similar occupancies up to 1500 sq. ft.

maximum.

2) Interior – private offices: One zone per three offices.

3) Interior – larger conference rooms: One zone per conference room.

4) Perimeter offices – No more than 300 sq. ft. per zone along a common exposure.

5) Perimeter conference rooms: One zone per conference room.

6) Perimeter – corner rooms/offices: One corner room per zone.

2. Chiller Plant and Dedicated 24/7 Condenser Water Systems Chillers/Cooling Towers

• Total chilled water system capacity = 950 tons.

• Three water cooled centrifugal chillers, refrigerant R-132 or R-410a. Each chiller 350 nominal tons capacity. Locate the chillers in the existing basement chiller room.

• Chillers operating at .52 KW/ton or less, delivering 42 F. chilled water and returning at 58 F.

• Chillers piped in a primary/secondary piping configuration for efficiency.

• Each chiller shall be provided with a constant volume primary chilled water pump (total of three + one extra redundant pump). Each pump capable of 520 gpm flow at 25 ft. of head.

Each pump provided with a variable speed drive for capacity modulation.

• Provide two (one redundant) secondary chilled water pumps each with variable speed drives.

Each pump shall be capable of 1560 gpm at approximately 75 ft. of head.

• Provide air separator and expansion tank(s) appropriate for the size of the system.

• Provide makeup water fill and chemical pot feeder systems for this chilled water system.

• Distribute new chilled water supply and return water piping to new air handling units and fan coil units in locations described in “Air Systems”. All coils shall be provided with modulating two way valves.

• Provide three (3) nominal 350 ton capacity cross-flow type cooling towers with integral sump. The cooling towers will be located on the roof area ‘A’ at the penthouse mechanical room level. Each cell fan motor shall be provided with a variable speed drive for capacity control.

• Route 12” to 14” condenser water supply from the sump of tower and a 10” to 12” condenser water return from the condenser water pump(s) in the chiller room up to the cooling tower. Route in the current pipe shaft location at the north side of the building.

• Provide a dedicated condenser water pump for each new chiller. Each pump will be capable of 1050 gpm. The pumps will be located near each chiller. Route the condenser water to and from the cooling tower to the pumps.

• Provide automatic chemical feed for the condenser water systems in the chiller room.

Dedicated Condenser Water System

• Provide a dedicated 24/7 condenser water system to supply continuous water to air conditioning systems serving building fire command/building automation/security type communication rooms, voice/data rooms and computer rooms with dedicated AC equipment. Provide two evaporative fluid coolers (one redundant) on the roof area above the 6th floor. Each evaporative fluid cooler shall be sized for approximately 100 tons of cooling capacity. The evaporative fluid coolers will be provided with finned coils for 100% “free cooling” capability in the winter (below 40 F. ambient conditions) and to minimize any potential for water freezing. The fluid cooler fans shall be controlled with variable speed drives. One of the coolers will be redundant.

• Route domestic water for fill of the fluid cooler sump for coil spray.

• Provide two condenser water pumps (one redundant) in the Penthouse mechanical room.

The pump shall deliver approximately 300 gpm at 75 ft. of head. The pumps shall be based mounted centrifugal. The condenser water system shall be filled with a nominal 40% propylene glycol solution.

• Route the condenser water piping from the 24/7 fluid cooler(s) to these pumps and then provide a circulating loop at each floor connecting to the 24/7 AC systems. The condenser water supply and return temperatures shall be based on a 10 F. temperature differential, typically 90 F. supply and 100 F. return during peak summer ambient conditions.

3. Boiler Plant

• Total required hot water capacity of plant = 15,000,000 btu

• Boiler Type: Gas fired, low temperature hot water condensing type boilers.

• Boiler system to operate at maximum 140 F. supply water/120 F. return water temperatures at -19 F. lowering to 100 F. supply/80 F. return at 50 F. outdoor ambient conditions for maximum efficiency. Boiler must operate at minimum 160 F. supply/140 F. return water temperatures when operating on the backup fuel oil source.

• The boiler systems will supply 140 F. hot water, or less, to building system variable air volume box reheat coils, perimeter finned tube radiation, overhanging areas exposed to the outdoors and makeup air handling unit preheating coils. All heating coils and elements will be provided with modulating two way valves.

• The circulating hot water systems shall be filled with a 40% solution of propylene glycol.

• Provide five Fulton, Aerco, or equal 4000 mbh input, 3300 mbh output dual fuel boilers on a skid mounted configuration within the existing boiler room. The basis for design is the Fulton Vantage 4000DF, five boilers in series. The packaged boiler system shall include manifolded piping configuration ready for connection at the site. Each boiler return water connection shall have a motorized valve to enable shut-off of non-operating boilers at lower load conditions. Boilers shall be designed and certified for operation at no flow conditions.

• Route flue connections from the boilers up into the existing boiler stack routing location up through the roof. Intake for the boilers shall be from the outdoor air louvers nearest the mechanical rooms on basement/ground levels.

• Pumping Systems: Provide a primary/secondary piping and pumping configuration. Provide one dedicated primary pump for each boiler (total of five) with one backup for the five pumps. Pumps shall be 330 gpm at approximately 30 ft of head each. Provide two (one redundant) based mounted secondary pumps at 1650 gpm each at approximately 75 ft. of head. Each pump shall have a variable speed drive.

• Provide air separator and expansion tank(s) appropriate for the size of the system.

• Provide makeup water fill and chemical pot feeder systems for this hot water system.

s:\2100\2111\027-00\work\mech\predesign specs and calculations\alternate m-2\alternative m-2 narrative.doc